Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03332
StatusFinaled
Name WHITE CLOUD COMMUNICATION INC
Site Address 3680 E WARM SPRINGS AVE
Project NameHarris Ranch Communications
Customer Number 
ePlanReviewYes
Description
(HARRIS RANCH COMMUNICATIONS - COMMUNICATIONS TOWER FOR ADA COUNTY) The equipment building will not have a fire sprinkler system. To install a 50 foot tall self-supporting free-standing communications tower (with 8 feet 3 inches by 8 feet 3 inches by 4 feet 4 inches thick concrete footing) and an associated 300 square foot concrete equipment building (based on 12’ x 25’ outside dimensions) located next to an existing fire station building. The equipment building is a modular building and is required to have a state tag. The building will be placed 4 feet from the fire station building and 5 feet from the South interior property line. Special Inspections are required for soils, concrete, welding, expansion anchors, and bolting. The concrete slab for the equipment building is required to bear on compacted structural fill materials, the expansive clay being removed and/or prepared per the soils report. Special Inspection for soil is required for the tower and for the equipment building. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/22/2015 DONE
Third Notice 8/16/20159/15/2015 DONE
Second Notice 7/19/20158/11/2015 DONE
DetailsCandy A. Nichols
mailed notice
First Notice 6/25/20157/9/2015 DONE
mailed in 7-10-15
Zoning Approval6/15/20156/15/20156/15/2015 PASS
DetailsJosh Wilson
Permanent Occupancy  6/15/2015 DONE
BLD-Final6/11/20156/12/20156/12/2015APASS
DetailsPhil Shearer
Call 20 mins before //Bill Phone #: ###-####
FIRE-Final Inspection6/9/20156/9/20156/9/2015PPASS
DetailsKatie Marron
Life safety pass
BLD-Foundation4/9/20154/10/20154/10/2015APASS
DetailsPhil Shearer
Rebar // Bruce Phone #: ###-####
BLD-Foundation4/3/20154/7/20154/7/2015APASS
DetailsPhil Shearer
Rebar // Bruce Phone #: ###-####
Issue PAID IN FULL permit  3/13/2015 DONE
Print Occupancy Form  3/13/2015 DONE
OVERRIDE  3/6/2015  
Plan assigned to (CJW)12/15/201412/15/20143/6/2015 PASS
DetailsCarl Westfall
HARRIS RANCH COMMUNICATIONS - New Commercial - ePlanReview - (15 days - Jan 1)
Routing - PLAN CHECK3/5/2015 3/6/2015 PASS
DetailsCarl Westfall
Drawings approved with redlines
PLANS/APPL TAKEN TO FRONT DESK  3/6/2015 DONE
Permit Ready to Issue  3/6/2015 DONE
DetailsCandy A. Nichols
need GC, RP & ACHD
Plan resubmittals received  3/5/2015 DONE
Plan resubmittals requested  1/27/2015 DONE
Routing - PLAN CHECK1/26/2015 1/27/2015 FAIL
DetailsCarl Westfall
Items not resolved
Plan resubmittals received  1/26/2015 DONE
Route to Impact Fee Review1/9/20151/12/20151/15/2015 PASS
DetailsCindy M. Gould
1st review completed  1/9/2015 FAIL
DetailsCarl Westfall
Failed building
Plan resubmittals requested  1/9/2015 DONE
Routing - PLAN CHECK12/15/2014 1/9/2015 FAIL
DetailsCarl Westfall
Routing - FIRE12/15/201412/15/201412/22/2014 PASS
DetailsScott Arellano
If stationary storage battery systems are present with this facility, the provisions of IFC section 608 may apply. Provisions include, but are not limited to, exterior signage on building doors indicating the presence of energized electrical circuits and battery systems etc.
Routing - PLANNING Land Div12/15/2014 12/16/2014 PASS
DetailsDave Abo
Lot 1, Block 15 of Dallas Harris Estates Subdivision No. 3
Routing - Design Review12/15/2014 12/15/2014 PASS
DetailsJosh Wilson
Ok per DRH14-00395.
Routing - Addressing12/15/2014 12/15/2014 PASS
DetailsEmily Dixon
Address corrected to 3680 E Warm Springs Ave.
Routing - PUBLIC WORKS12/15/2014 12/15/2014 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment12/15/2014 12/15/2014 PASS
DetailsEvan Jenkins
(HARRIS RANCH COMMUNICATIONS) New communications tower and shelter adjacent to the existing fire station building. Construction of 555sq ft' concrete pad, sidewalks for placement of 300 sq ft prefab building. Trenching approx 110'ft, not exceeding 4'ft deep for power
Pending Assignment by JCB12/15/2014 12/15/2014 DONE
DetailsJason Blais
Plan Reviewer's activity  12/12/2014 PASS
Plan intake completed. OK to sumit.
Intake Approval  12/12/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Westfall and plan review fees paid.
Intake Approval  11/14/2014 FAIL
Please resolve the items circled on the plan intake checklist.
Application received  11/10/2014 DONE
Application submitted via PDS Online on Nov 10 2014 2:42PM