BLD-Final | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Phil Shearer
|
|
|
Brian Phone #: ###-####
|
DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Phil Shearer
|
|
|
Bryan Phone #: ###-####
|
BLD-Wall Bracing | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | PASS |
Phil Shearer
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Phil Shearer
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | FAIL |
Phil Shearer
|
|
|
Brian Phone #: ###-####. Missing the straps for the portal frame on the back of the house. CN posted
|
BLD-Wall Bracing | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | FAIL |
Phil Shearer
|
|
|
Brian Phone #: ###-####. Shear panels need to have 8d comm at 6" edge and 12" in the feild CN posted
|
BLD-Foundation | 12/22/2014 | 12/24/2014 | 12/24/2014 | P | PASS |
Phil Shearer
|
|
|
call from Eric to changeblhh12-24-14 Phone #: ###-####
|
BLD-Foundation | 12/19/2014 | 12/22/2014 | 12/22/2014 | P | CANC |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 12/16/2014 | 12/17/2014 | 12/17/2014 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 12/17/2014 | 12/17/2014 | 12/17/2014 | | DONE |
Jason C. Taylor
|
|
|
* FOOTINGS ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 12/15/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Permit Ready to Issue | | | 12/15/2014 | | DONE |
|
|
|
|
Plan assigned to (JG) | | 11/13/2014 | 12/5/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 11/25 T L1**
|
Routing - PLAN CHECK | 11/25/2014 | | 12/5/2014 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 12/5/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 12/2/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A-103, S-101 & S-106; Plans stamped and taken to Javier for further review
|
1st review completed | | | 11/25/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 11/24/2014 | | 11/25/2014 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Routing - MECHANICAL | 11/18/2014 | | 11/24/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to idaho hvac
|
Routing - MECHANICAL | 11/24/2014 | | 11/24/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | | | 11/18/2014 | | PASS |
|
|
|
|
Routing - Addressing | 11/13/2014 | | 11/17/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/17/2014 | | 11/17/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 11/13/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 11/13/2014 | | PASS |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/13/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 11/13/2014 | | | |
|
|
|
|