Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-03372
StatusFinaled
Name HCD INC
Site Address 2757 S BROADWAY AVE
Project NamePIZZA PIE CAFE'
Customer Number 
ePlanReviewYes
Description
(PIZZA PIE CAFÉ – Gateway Shopping Center) Permit is to remodel a 4,530 square foot tenant space previously created as a “Vanilla Finish” under BLD14-03282. Work to include: installation of new mechanical, installation of a class I hood, installation of new plumbing, construct interior non-bearing walls, all new seating, installation of new accessible doors / hardware, installation of all new lighting, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PRINT Activities  3/19/2015 DONE
PRINT Activities  3/19/2015 DONE
Print Statement  3/19/2015 DONE
Permanent Occupancy  3/13/2015 DONE
First Notice2/2/20152/2/20153/3/2015 DONE
DetailsJim Storey
mailed 3-3-15
BLD-Final2/2/20152/2/20152/2/2015PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Dennis Harmon
DOC - Permit Finaled2/2/20152/2/20152/2/2015PPASS
DetailsJim Storey
Issue PAID IN FULL permit  12/30/2014 DONE
Print Occupancy Form  12/30/2014 DONE
OVERRIDE  12/29/2014  
PLANS/APPL TAKEN TO FRONT DESK  12/29/2014 DONE
Permit Ready to Issue  12/29/2014 DONE
DetailsChristina Prado
pending RP
Plan assigned to (TLW)11/19/2014 12/29/2014 PASS
DetailsTim L. Woodard
Level 3 TI - ePlanReview - Pizza Pie Cafe'
Routing - PLAN CHECK12/18/2014 12/23/2014 PASS
DetailsTim L. Woodard
Routing - MECHANICAL12/18/2014 12/23/2014 PASS
DetailsTroy James
Routing Off Site - C.D.H12/18/2014 12/23/2014 PASS
DetailsTim L. Woodard
Failed. Still needs applicant to pay fees and conduct plan review meeting at CDH. TLW
Plan resubmittals received  12/18/2014 DONE
1st review completed  12/11/2014 FAIL
DetailsTim L. Woodard
Routing - PLAN CHECK11/19/2014 12/11/2014 FAIL
DetailsTim L. Woodard
Routing PW Environmental11/19/2014 12/4/2014 PASS
DetailsRick Christenson
Routing - FIRE11/19/201411/19/201411/25/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 11-25-14
Routing Off Site - C.D.H11/19/2014 11/24/2014 FAIL
DetailsTim L. Woodard
Routing - MECHANICAL11/19/2014 11/21/2014 FAIL
DetailsTroy James
Routing - PLUMBING11/19/2014 11/19/2014 PASS
DetailsBill VanDegrift
1) additional cross connection protection may be required.
2) floor sinks to be 50% exposed under cabinets.
Routing - Addressing11/19/2014 11/19/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS11/19/2014 11/19/2014 PASS
DetailsBeverly Mountain
Routing - Design Review11/19/2014 11/19/2014 PASS
DetailsSarah Schafer
Sarah Schafer - one new replaced exterior door at rear
Approved new exterior man door through building permit.
Routing - Erosion and Sediment11/19/2014 11/19/2014 PASS
DetailsEvan Jenkins
(PIZZA PIE CAFE') Remodel splitting the space changing occupancy from retail to a new assembly restaurant tenant within an existing building per approved plans. Work to include... Demising wall occurring under permit BLD14-03282 and adjacent Vanilla Finish occurring under BLD14-03352.
Plan Reviewer's activity  11/19/2014 DONE
DetailsJason Blais
Emailed architect to contact ACHD and provide them any needed documents to evaluate if any additional impact fees are due. Written verification from ACHD shall be provided to our Permit Counter prior to the building permit being issued.
Plan Reviewer's activity  11/19/2014 DONE
DetailsJason Blais
No ACHD impact fees or inspection required. Email from Christy Little below:

Roger,
ACHD will not have any impact fees, and no inspection is required for this tenant improvement. Please provide this e-mail to the City with your application materials so that this can be noted in their system.
Thanks,
Christy

Christy Little
Program Administrator
Development Services
###-####
Routing PW Sewer Rating11/19/2014 11/19/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCB11/19/2014 11/19/2014 DONE
DetailsJason Blais
Intake Approval  11/18/2014 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Application received  11/14/2014 DONE
Application submitted via PDS Online on Nov 14 2014 10:56AM