Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-03406
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 503
Project NameUS Bank - 5th Flr
Customer Number 
ePlanReviewYes
Description
(LaMar COURT REPORTING - US Bank Building - Ste#503) Permit is to remodel a 1,675 sqaure foot existing office tenant space (Integrys - BLD08-00835). Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create a new office area, installation of new accessible doors / hardware, relocating existing lighting, and finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/12/20153/3/2015 DONE
mailed 3-3-15
First Notice 1/16/20152/2/2015 DONE
DetailsCandy A. Nichols
mailed 2/2/15
BLD-Final1/5/20151/6/20151/6/2015PPASS
DetailsDave Hannah
Please call ahead - Matt Phone #: ###-####
FIRE-Final Inspection1/5/20151/6/20151/6/2015APASS
DetailsForrest France
Fire life safety finaled.
Permanent Occupancy  1/6/2015 DONE
DetailsChristina Prado
FIRE-Final Inspection1/5/20151/5/20151/5/2015PPASS
DetailsForrest France
Noted corrections completed. Fire life safety finaled.
BLD-Final12/30/20141/2/20151/5/2015ANR
DetailsDave Hannah
Brad-please call before you head out Phone #: ###-####
FIRE-Final Inspection12/30/201412/31/201412/31/2014PNR
DetailsForrest France
Need project related fire sprinkler permit work completed and scheduled for inspection prior to fire life safety final.
FIRE-Conference12/29/201412/29/201412/29/2014PDONE
DetailsForrest France
Regarding fire sprinkler coverage at the tenant remodel area.
BLD-Final12/23/201412/24/201412/24/2014PNR
DetailsDave Hannah
Brad Phone #: ###-#### needs fire finals
FIRE-Final Inspection12/24/201412/24/201412/24/2014PFAIL
DetailsForrest France
Modifications to the existing fire sprinkler system will be necessary due to remodel work- noted spacing and coverage issues, missing PFE per plan, revise room use on the drawings to match field conditions (office and video conference rooms are reversed).
BLD-Framing/Rough-in12/9/201412/10/201412/10/2014APASS
DetailsDave Hannah
John Phone #: ###-####
Permit Ready to Issue  12/8/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  12/8/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  12/8/2014 DONE
DetailsChristina Prado
Intake Approval  12/2/2014 PASS
Plan assigned to (TLW)12/2/2014 12/2/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/2/2014 12/2/2014 PASS
DetailsTim L. Woodard
1st review completed  12/2/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/2/2014 DONE
Application received  11/19/2014 DONE
Application submitted via PDS Online on Nov 19 2014 11:36AM