Second Notice | | 2/12/2015 | 3/3/2015 | | DONE |
|
|
|
mailed 3-3-15
|
First Notice | | 1/16/2015 | 2/2/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed 2/2/15
|
BLD-Final | 1/5/2015 | 1/6/2015 | 1/6/2015 | P | PASS |
Dave Hannah
|
|
|
Please call ahead - Matt Phone #: ###-####
|
FIRE-Final Inspection | 1/5/2015 | 1/6/2015 | 1/6/2015 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | | 1/6/2015 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/5/2015 | 1/5/2015 | 1/5/2015 | P | PASS |
Forrest France
|
|
|
Noted corrections completed. Fire life safety finaled.
|
BLD-Final | 12/30/2014 | 1/2/2015 | 1/5/2015 | A | NR |
Dave Hannah
|
|
|
Brad-please call before you head out Phone #: ###-####
|
FIRE-Final Inspection | 12/30/2014 | 12/31/2014 | 12/31/2014 | P | NR |
Forrest France
|
|
|
Need project related fire sprinkler permit work completed and scheduled for inspection prior to fire life safety final.
|
FIRE-Conference | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | DONE |
Forrest France
|
|
|
Regarding fire sprinkler coverage at the tenant remodel area.
|
BLD-Final | 12/23/2014 | 12/24/2014 | 12/24/2014 | P | NR |
Dave Hannah
|
|
|
Brad Phone #: ###-#### needs fire finals
|
FIRE-Final Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 | P | FAIL |
Forrest France
|
|
|
Modifications to the existing fire sprinkler system will be necessary due to remodel work- noted spacing and coverage issues, missing PFE per plan, revise room use on the drawings to match field conditions (office and video conference rooms are reversed).
|
BLD-Framing/Rough-in | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Permit Ready to Issue | | | 12/8/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 12/8/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 12/8/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/2/2014 | | PASS |
|
|
|
|
Plan assigned to (TLW) | 12/2/2014 | | 12/2/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 12/2/2014 | | 12/2/2014 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 12/2/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2014 | | DONE |
|
|
|
|
Application received | | | 11/19/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 19 2014 11:36AM
|