BLD-Final | 11/19/2014 | 11/20/2014 | 11/20/2014 | P | PART |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Ok for 90 day temp occ. existing walls ok for restroom and dressing rooms, which were orginally permited when vanity fair occupied space, 2nd required exit is clear and these rooms do not entervine the 2nd. exit.
|
FIRE-Final Inspection | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | PART |
Troy Cobbley
|
|
|
A temporary was given for life safety as per the scope of work. Bill claims Tim Woodard is ok with existing walls that are not shown on plans. I could not contact Tim. Bill shall provide verification to Building inspector of said conversation prior to a final sign off.
|
Temporary Occupancy | 11/20/2014 | 2/18/2015 | 11/20/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (FNL) | | | 11/20/2014 | | DONE |
Christina Prado
|
|
|
Tenant granted temp occupancy only. No need for perm
|
Plans ACCEPTED BY PLAN TECH | | | 11/19/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/19/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 11/19/2014 | | 11/19/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/19/2014 | | 11/19/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/19/2014 | | DONE |
|
|
|
|
1st review completed | | | 11/19/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/19/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/19/2014 | | | |
|
|
|
|