BLD-Final | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PASS |
Jim Sly
|
|
|
Richard Phone #: ###-#### OK for Perm Occ
|
FIRE-Final Inspection | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Sprinkler Rough-in | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | DONE |
Troy Cobbley
|
|
|
Inspection was actually for a conference about the fire hydrant. The new fire hydrant has been installed too close to the side walk so that when the fence is installed the 3'-0" clearance can not be met. Also the 5" barrel is installed the wrong direction when the fence is installed. I ended up deferring Jake to Romeo for any variance.
|
BLD-Framing/Rough-in | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | PASS |
Jim Storey
|
|
|
Richard Phone #: ###-####
|
BLD-Foundation | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Jim Sly
|
|
|
Richard-slab Phone #: ###-####
|
BLD-Foundation | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Jim Sly
|
|
|
RICHARD Phone #: ###-####
|
BLD-Foundation | 4/23/2015 | 4/23/2015 | 4/24/2015 | P | PASS |
Jim Sly
|
|
|
Richard Phone #: ###-####
|
BLD-Footing | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PART |
Mike Jordan
|
|
|
Pour time at 1130. Top of the piers // Richard Phone #: ###-####0. work in progress. Noted that east and west footings have been deleted. Will need RFI from engineer of record.
|
BLD-Footing | 4/20/2015 | 4/21/2015 | 4/21/2015 | P | PART |
Jim Sly
|
|
|
late as possible Richard Phone #: ###-####bldg Select columns.... ok Bldg furthest East.
|
BLD-Footing | 4/17/2015 | 4/20/2015 | 4/20/2015 | A | PASS |
Jim Sly
|
|
|
Richard-base of piers Phone #: ###-####-pour time 11:45 Building Furthest East. Talked to Engineer of Record. No special inspection required.
|
Inspection Record Card- Bld | | | 4/16/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/1/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/26/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 2/5/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 2/5/2015 | | DONE |
|
|
|
need RP
|
Routing Off Site - STRUCTURAL | 1/13/2015 | | 1/13/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/13/2015 | | 1/13/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/8/2014 | | 1/13/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Route to Impact Fee Review | 12/29/2014 | 1/1/2015 | 12/31/2014 | | PASS |
Leslie Sullivan
|
|
|
|
Routing - PLAN CHECK | 12/8/2014 | | 12/29/2014 | | PASS |
Carl D Madsen
|
|
|
Pending approval of restroom modification letter.
|
1st review completed | | | 12/29/2014 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/8/2014 | | 12/29/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 12/8/2014 | | 12/12/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Design Review | 12/8/2014 | | 12/10/2014 | | PASS |
Sarah Schafer
|
|
|
Approved under DRH05-00270
|
Routing PW Drainage | 12/8/2014 | | 12/9/2014 | | PASS |
Brian Murphy
|
|
|
|
Plan Reviewer's activity | | | 12/8/2014 | | PASS |
John Menard
|
|
|
Plan intake approved
|
Routing - PLANNING Land Div | 12/8/2014 | | 12/8/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 12/8/2014 | | 12/8/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 12/8/2014 | | 12/8/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 12/8/2014 | | 12/8/2014 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
The addition of one covered storage building for storage of 13,920 SF with site work and exterior lighting. Republic Storage (Building G) Covered storage building. Four permits are attached to Case BLD14-03428 in ePlanReview, Building G BLD14-03428, Building H BLD14-03438, Building I BLD14-03439, and Building J BLD14-03440.
|
Application received | | | 11/21/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2014 1:24PM
|
Pending Assignment by JCM | 12/8/2014 | | | | |
John Menard
|
|
|
|