BLD-Ceiling Grid Inspection | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Final | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | NH |
Jim Sly
|
|
|
Kelly Phone #: ###-#### Called Kelly 3 times....... Return call when I was out of time to meet him. Re-call for final.
|
FIRE-Final Inspection | 7/11/2017 | 7/11/2017 | 7/11/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspections are complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | CANC |
Troy Cobbley
|
|
|
Kelly did not have approved plans. Phone #: ###-####
|
BLD-Aging Inspection | 1/29/2016 | 1/29/2016 | 2/1/2016 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/28/2016 | 1/28/2016 | 2/1/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 10/26/2015 | 10/27/2015 | 10/27/2015 | A | DONE |
Dave Hannah
|
|
|
Phil Phone #: ###-####
|
BLD-Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble first phase ok
|
BLD-Final | 9/11/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble
|
FIRE-Final Inspection | 9/11/2015 | 9/11/2015 | 9/11/2015 | A | PART |
Jim Page
|
|
|
Project being completed in phases, inspected areas requesting final, area's for this phase passed/complete for llife fire safety. Contractor will schedule remaining area to inspect when complete.
|
BLD-Ceiling Grid Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble
|
BLD-Wall cover | 7/1/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by phil doble
|
BLD-Wall cover | 6/12/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble
|
BLD-Conference | 5/15/2015 | 5/15/2015 | 5/15/2015 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble. Inspected and discussed placement of vault door.
|
BLD-Footing | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PART |
Dave Hannah
|
|
|
before 2:30 pm. would work best for us. thanks Phil Phone #: ###-#### Inspection requested via web by phil doble strata on site covering spec. inspection.
|
OVERRIDE | | | 3/2/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 1/22/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 1/21/2015 | | 1/22/2015 | | DONE |
Carl Westfall
|
|
|
Failed ESC on Jan. 14, 2015. The issue was evidently resolved outside or ePlanReview because the formerly "failed" ESC review activity was changed to "passed". Had to route it to ESC to get it signed off in ePlanReview by ESC.
|
Routing - PLAN CHECK | 1/22/2015 | | 1/22/2015 | | DONE |
Carl Westfall
|
|
|
Routing started
|
Routing - Erosion and Sediment | 1/22/2015 | | 1/22/2015 | | PASS |
Evan Jenkins
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/22/2015 | | DONE |
|
|
|
Needs ACHD, RP, GC & Cert of value
|
Plan assigned to (CJW) | 11/25/2014 | | 1/22/2015 | | PASS |
Carl Westfall
|
|
|
MSTI VAULT EXPANSION FOR TRUEBEAM ACCELERATOR (15 days - Dec 15) (1st review done)
|
Plan resubmittals received | | | 1/21/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 1/13/2015 | | 1/15/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/8/2015 | | 1/15/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with red lines
|
Plan resubmittals requested | | | 1/15/2015 | | DONE |
Carl Westfall
|
|
|
Failed ESC
|
Routing - Erosion and Sediment | 1/13/2015 | | 1/14/2015 | | PASS |
Evan Jenkins
|
|
|
For ESC Site Map, please reference ESC14-00859. This is for the actual Building that will be placed in the excavated hole. This is attached to GRD14-00014 and another BLD. SWPPP is already onsite, due to previously submitted approved plans/permits.
|
Plan resubmittals received | | | 1/8/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 12/18/2014 | 12/21/2014 | 12/19/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 11/25/2014 | | 12/18/2014 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
1st review completed | | | 12/18/2014 | | DONE |
|
|
|
Failed ESC, mec, and bld.
|
Plan resubmittals requested | | | 12/18/2014 | | DONE |
|
|
|
|
Routing PW Drainage | 11/26/2014 | | 12/12/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 11/25/2014 | | 12/12/2014 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Routing Off Site - STRUCTURAL | 11/25/2014 | | 12/10/2014 | | PASS |
Carl Westfall
|
|
|
Chris Merrill with Stapley Engineering was the consultant Structural Engineer.
|
Routing - MECHANICAL | 11/25/2014 | | 12/9/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 11/25/2014 | | 12/2/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 11/25/2014 | | 12/1/2014 | | FAIL |
Evan Jenkins
|
|
|
ESC Site Map Required for Approval: Site Map shall identify BMP locations and types of BMP's used during construction
This project consists of a vault for the truebeam accelerator located on the ground floor level of the msti building located at 100 east idaho street, boise, idaho. The entire building is fire sprinkled including the area of this tenant improvement
|
Routing - PLUMBING | 11/25/2014 | | 11/28/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 11/25/2014 | | 11/26/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING Land Div | 11/25/2014 | | 11/25/2014 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 11/25/2014 | | 11/25/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/25/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 11/25/2014 | | 11/25/2014 | | DONE |
John Menard
|
|
|
|
Application received | | | 11/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 24 2014 11:51AM
|