Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-03441
StatusIssued
Name EKC INC
Site Address 1249 W GRAND AVE
Project NameRiver Plaza Apartments
Customer Number 
ePlanReviewYes
Description
(RIVER PLAZA APARTMENTS) Project includes adding 196 sq. ft. of roof structures over portions of the third floor walkway. Work to include: construct a new 80 square foot roof cover over the third floor walkway at the north west location near stair #2; construct a new 112 square foot roof cover over the third floor walkway at the south east location near stair #7. All work per the approved plans, engineering, and adopted codes. Note: This building is Fire Sprinklered for height and occupancy provisions. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in7/8/20157/8/20157/8/2015PPASS
DetailsDave Hannah
Tim Phone #: ###-####
Issue PAID IN FULL permit  5/13/2015 DONE
Print Occupancy Form  5/13/2015 DONE
Expiration Notice5/5/20155/27/20155/5/2015 DONE
DetailsBrittany Hill
Permit Ready to Issue  3/11/2015 DONE
DetailsCandy A. Nichols
requirements met
Plan assigned to (SRZ)12/18/201412/18/20141/20/2015 PASS
DetailsSam Zahorka
Level 3 TI - ePlanReview - River Plaza Apartments
Routing - PLAN CHECK12/18/2014 1/20/2015 PASS
DetailsSam Zahorka
1st review completed  1/20/2015 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/20/2015 DONE
DetailsSam Zahorka
Routing - FIRE12/18/201412/18/201412/24/2014 PASS
DetailsScott Arellano
No comments attached.
Routing - Design Review12/18/2014 12/18/2014 PASS
DetailsSarah Schafer
Sarah Schafer - CZC14-00334 - Approved per the CZC.
Pending Assignment by JCB12/18/2014 12/18/2014 DONE
DetailsJason Blais
Intake Approval  12/16/2014 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Intake Approval  12/5/2014 FAIL
DetailsTim L. Woodard
Mark,

Please upload a Major Tenant Improvement Checklist. This project does not comply as a Minor Tenant Improvement. There is additional square feet being added and it is not one of the approved occupancies that do apply to the Minor TI process. Upon completeing the #520 Major TI Checklist and submitting all appropriate documents I will complete the "Prescreening" process.

Some things I already see missing are:
1) Planning Approval
2) Code Analysis for new code showing compliance with additional area added.
3) Fire Flow letter from United Water.
4) Grading and drainage requirements. (Unless project meets exceptions)

Tim Woodard
###-####
Application received  11/25/2014 DONE
Application submitted via PDS Online on Nov 25 2014 9:45AM