BLD-Final | 1/29/2016 | 1/29/2016 | 1/29/2016 | P | PEND |
Tony Young
|
|
|
would like call ahead; Dan Phone #: ###-####
|
BLD-Final | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PART |
Tony Young
|
|
|
would like call ahead; Dan Phone #: ###-####,, all ok except needs address posted on home,, and deck finished
|
BLD-Final | 1/26/2016 | 1/28/2016 | 1/28/2016 | A | DEFR |
Tony Young
|
|
|
would like call ahead; Dan Phone #: ###-####
|
BLD-Aging Inspection | 1/13/2016 | 1/13/2016 | 1/15/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PEND |
Tony Young
|
|
|
status review
|
BLD-Aging Inspection | 1/12/2016 | 1/12/2016 | 1/14/2016 | | PASS |
Tony Young
|
|
|
|
BLD - Request for Extension | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####// please call before
|
BLD-Energy code compliance | 1/30/2015 | 2/2/2015 | 2/2/2015 | A | PASS |
Tony Young
|
|
|
Insulation // Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2015 | 1/28/2015 | 1/28/2015 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, ok to insulate pending electrical
|
BLD-Wall Bracing | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | PASS |
Tony Young
|
|
|
Dan ###-####,, ext shear
|
Telephone call | | | 1/5/2015 | | |
|
|
|
W Dan Hemmer,
As there is not a fire resistive product available to meet all of the WUI requirements for the exterior "WALL" coverings (less than 1- square) any Soffit / overhangs are to be protected in the affected area. typical wall finish with matching masonite lap siding will be ok here.
|
BLD-Framing/Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | P | PART |
Tony Young
|
|
|
Dan Phone #: ###-####, floor built over garage slab ok
|
BLD-Footing | 12/10/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####,, pier footings
|
PubWorks Subgrade Approval | 12/11/2014 | 12/11/2014 | 12/11/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing and column pads subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (PW Hillside) | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | PASS |
Colleen T Carroll
|
|
|
Subgrade inspection required by geotechnical engineer prior to scheduling footing/column with building department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2014 | | |
|
|
|
|
1st review completed | | | 11/28/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/28/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/28/2014 | | DONE |
|
|
|
|
Application received | | 11/28/2014 | | | |
|
|
|
|