BLD-Final | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | | | 10/9/2015 | | DONE |
|
|
|
per Final inspection 10-9-15
|
Letter of compliance/Occupancy | | | 10/9/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | FAIL |
Phil Shearer
|
|
|
Kevin Phone #: ###-####. Door swing into path of egress.
|
FIRE-Final Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Troy Cobbley
|
|
|
Given a temporary for life safety until the north exit discharge light to be repaired.
|
FIRE-Final Inspection | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need all small documents, need new location of the fire hydrant approved, need exit discharge light on north end of building repaired. Need the project related fire alarm and fire sprinkler permits finaled.
|
BLD-Foundation | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Phil Shearer
|
|
|
Kevin-rebar-later in the PM if possible Phone #: ###-####
|
BLD-Other | 5/8/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Phil Shearer
|
|
|
panel steel; Kevin Phone #: ###-#### Pending MTI inspection
|
BLD-Footing | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | PASS |
Phil Shearer
|
|
|
11 pour // Kevin Phone #: ###-####
|
BLD-Footing | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-#### Footinf West half of building
|
BLD-Footing | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Phil Shearer
|
|
|
Kevin// pour time 130pm Phone #: ###-####. Interior column footings
|
BLD-Footing | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | NR |
Phil Shearer
|
|
|
Kevin-rebar-pour time 2:30 Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/25/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/25/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 2/4/2015 | | |
|
|
|
|
Routing PW Sewer Design | 1/23/2015 | | 2/4/2015 | | PASS |
Kristal Soland
|
|
|
All sewer connections are existing.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2015 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 2/4/2015 | | |
|
|
|
NEED Certificate of Value, ACHD,
|
Routing - PLAN CHECK | 1/21/2015 | | 2/4/2015 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 12/16/2014 | | 2/4/2015 | | PASS |
John Menard
|
|
|
1st Review Complete 1/15/2015
|
Routing Off Site - STRUCTURAL | 1/21/2015 | | 1/27/2015 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 1/21/2015 | | 1/23/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 1/20/2015 | | 1/20/2015 | | FAIL |
John Menard
|
|
|
Failed resubmittal to have applicant resubmit structural drawings with horizontal orientation. JCM
|
1st review completed | | | 1/15/2015 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 12/16/2014 | | 1/15/2015 | | FAIL |
John Menard
|
|
|
|
Routing PW Sewer Design | 1/8/2015 | | 1/8/2015 | | FAIL |
Mike Sheppard
|
|
|
Submit Plan to April Wing of Boise City Public Works and Request New Sewer Manhole Number and add note to CCTV new line segment from existing manhole to new manhole.
|
Routing - FIRE | 12/16/2014 | | 12/24/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing Off Site - STRUCTURAL | 12/16/2014 | | 12/24/2014 | | FAIL |
John Menard
|
|
|
Structural review comments attached to this case and emailed to architect to have addressed.
|
Routing PW Solid Waste | 12/16/2014 | | 12/22/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 12/16/2014 | | 12/19/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 12/16/2014 | | 12/17/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing PW Sewer Rating | 12/16/2014 | | 12/16/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 12/16/2014 | | 12/16/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 12/16/2014 | | 12/16/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING Land Div | 12/16/2014 | | 12/16/2014 | | PASS |
Dave Abo
|
|
|
Parcel "C" on Record of Survey #9882.
|
Routing - Addressing | 12/16/2014 | | 12/16/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 12/16/2014 | | 12/16/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 12/16/2014 | | 12/16/2014 | | PASS |
Evan Jenkins
|
|
|
South Cole Center: Building C. New Single Story Concrete Tilt-up Building and site improvements.
|
Intake Approval | | | 12/16/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 12/16/2014 | | 12/16/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 12/8/2014 | | FAIL |
Sam Zahorka
|
|
|
See the items circled in RED on the Submittal Checklist.
|
Application received | | | 12/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 1 2014 2:41PM
|