Print Statement | | | 1/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/6/2016 | | DONE |
|
|
|
emailed Able-he sent me revised final values so i emailed him back with the corrected fees that are due
|
Print Statement | | | 12/28/2015 | | DONE |
|
|
|
|
Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
|
Third Notice | | 10/17/2015 | 11/9/2015 | | DONE |
|
|
|
|
Second Notice | | 9/25/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
First Notice | | 9/4/2015 | 9/15/2015 | | DONE |
|
|
|
Mailed 9/16/15
|
BLD-Final | 8/25/2015 | 8/25/2015 | 8/25/2015 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | | 8/25/2015 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | PASS |
Jim Page
|
|
|
Previously noted items repaired, Life fire safety inspection passed/complete
|
BLD-Conference | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
BLD-Final | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### temp ok pending others
|
FIRE-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | FAIL |
Troy Cobbley
|
|
|
1) Breakroom 108 exit has been moved from interior doors to exterior door. Need approval with the 118 person occupant load. 2) Provide emergnecy light in Fire Pump Rm 3)Repair Emergency Lights in Locker Rms. 4) Provide signage at Fire Pump Rm. 5) Provide exit discharge lighting without photo cells and timers per discussion.
|
FIRE-Final Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | CANC |
Jim Page
|
|
|
Tom Phone #: ###-####
|
Zoning Approval | 8/13/2015 | 8/13/2015 | 8/13/2015 | | DONE |
Cody Riddle
|
|
|
Isolated site, interior to airport campus, no planning inspection necessary.
|
BLD-Framing/Rough-in | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Jim Storey
|
|
|
Early afternoon - Lenard Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy
|
BLD-Framing/Rough-in | 5/8/2015 | 5/11/2015 | 5/11/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy alcoves ok to cover hanger side rated wall.
|
BLD-Wall cover | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy progression gyp ok hanger side/raised floor ok
|
BLD-Framing/Rough-in | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy hard ceillings and raised floor ok
|
BLD-Wall cover | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy ok to cover office/ fire joint ok across hanger side.
|
BLD-Framing/Rough-in | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy
|
BLD-Framing/Rough-in | 3/10/2015 | 3/10/2015 | 3/10/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy framing ok
|
BLD-Framing/Rough-in | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Jim Storey
|
|
|
Framing / Firestopping Phone #: ###-#### Inspection requested via web by Brian Murphy end of 2hr and 1hr walls ok to cover.
|
BLD-Framing/Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PART |
Jim Storey
|
|
|
Brian Phone #: ###-#### review top of wall detail/ rfi to arch for wide flange perpendiclur penatratio. menbrane.
|
Issue PAID IN FULL permit | | | 2/2/2015 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 2/2/2015 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 1/28/2015 | | DONE |
Candy A. Nichols
|
|
|
ws not a call but an email to Tracey @ McAlvain. Gave her the total fees due
|
OVERRIDE | | | 1/27/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/27/2015 | | DONE |
|
|
|
NEEDS- GC form, Certificate of Value, ACHD, and RP (RP received CAN)
|
Routing - PLAN CHECK | 1/26/2015 | | 1/26/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/5/2014 | | 1/26/2015 | | PASS |
Tim L. Woodard
|
|
|
Plan Resubmittals Level 3 TI - ePlanReview - Skywest Maintenance Hangar
|
Routing - MECHANICAL | 1/20/2015 | | 1/20/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 1/12/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 12/5/2014 | 12/5/2014 | 12/19/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 12/19/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 12/5/2014 | | 12/17/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to changemarks on drawings. TLW
|
Routing - PLAN CHECK | 12/5/2014 | | 12/17/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to Eplan Change marks. TLW
|
Routing - MECHANICAL | 12/5/2014 | | 12/12/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 12/5/2014 | | 12/8/2014 | | PASS |
Evan Jenkins
|
|
|
(SKYWEST MAINTENANCE HANGAR) Tenant improvement for a new aircraft maintenance hangar with office space and warehouse space attached. Tenant improvements for office, parts, and shop areas. Work to include... Shell permit was done under BLD14-02926.
|
Routing - PLUMBING | 12/5/2014 | | 12/8/2014 | | PASS |
Bill VanDegrift
|
|
|
Install a RPBP on water line to hose reel after eyewash station as required.
|
Routing - PLANNING | 12/5/2014 | | 12/8/2014 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - CUP14-00050
|
Routing - Addressing | 12/5/2014 | | 12/5/2014 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 12/5/2014 | | 12/5/2014 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 12/4/2014 | | PASS |
|
|
|
Plan intake approved
|
Intake Approval | | | 12/4/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Westfall and plan review fees paid.
|
Application received | | | 12/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2014 9:14AM
|