Second Notice | | 9/25/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
First Notice | | 8/24/2015 | 9/15/2015 | | DONE |
|
|
|
mailed 9-15-15
|
BLD-Final | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Phil Shearer
|
|
|
Jab Phone #: ###-####
|
FIRE-Final Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Jim Page
|
|
|
Previously noted items corrected, stairs in place, egress lighting operation. Life fire safety passed/complete
|
Permanent Occupancy | | | 8/14/2015 | | DONE |
|
|
|
|
Zoning Approval | 8/12/2015 | 8/12/2015 | 8/12/2015 | | PASS |
Josh Wilson
|
|
|
Parking lot landscaping will be installed with Phase II.
|
Print Occupancy Form | | | 8/11/2015 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 8/10/2015 | 8/10/2015 | 8/10/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 8/6/2015 | 8/7/2015 | 8/7/2015 | P | PART |
Phil Shearer
|
|
|
Jed Phone #: ###-####. OK for temp
|
FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy for life safety with Romeo's permission until the correct address is posted and the stairs are installed. One exit discharge light repaired while on site.
|
BLD-Energy code compliance | 7/7/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Jim Sly
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Wall Bracing | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Other | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Jim Sly
|
|
|
Nail off // Jef Phone #: ###-#### Roof nailing....OK.
|
BLD-Foundation | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Phil Shearer
|
|
|
Jeff// pour time is 12pm Phone #: ###-####
|
BLD-Concrete | 4/21/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Phil Shearer
|
|
|
Jeff// pour time is 2pm Phone #: ###-####
|
OVERRIDE | | | 4/17/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/17/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/13/2015 | | 4/17/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (AJS) | 3/23/2015 | | 4/17/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
review completed American Semiconductro
|
Routing Off Site - STRUCTURAL | 4/13/2015 | | 4/15/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 3/25/2015 | | 4/6/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 3/25/2015 | | 3/25/2015 | | PASS |
Josh Wilson
|
|
|
|
Plan Reviewer's activity | | | 3/23/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Email sent to Steve 3/23/15
Steve, I have deleted all of the new files that your uploaded for American Semiconductor drawings folder. Please re upload them with the same file name as the original file. This is required in order for the files to version.
Thank you.
Adele Schaffeld-Griffin
Plans Examiner II
Planning and Development Services
City of Boise
###-####
|
Routing Off Site - STRUCTURAL | 12/26/2014 | | 1/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/6/2015 | | DONE |
|
|
|
all requirments met
|
Plan assigned to (AJS) | 12/11/2014 | | 1/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New Building - ePlan - Priority Review - American Semiconductor
|
Routing - PLAN CHECK | 12/26/2014 | | 1/5/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 12/20/2014 | 12/23/2014 | 12/23/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 12/11/2014 | | 12/20/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 12/11/2014 | | 12/20/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 12/20/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 12/11/2014 | | 12/18/2014 | | PASS |
Peter J. McCullough
|
|
|
Gates to the enclosure must open 120 degrees minimum. signed off by Peter M in e plan
|
Routing PW Drainage | 12/11/2014 | | 12/18/2014 | | PASS |
Brian Murphy
|
|
|
approval for bld and p. lot not regional system bulk test required
|
Routing PW Environmental | 12/11/2014 | | 12/17/2014 | | PASS |
Rick Christenson
|
|
|
Electronics assembly only. No wet processes. Future process changes must be cleared through Boise City Pretreatment, ###-####.
|
Routing - FIRE | 12/11/2014 | | 12/17/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLANNING Land Div | 12/16/2014 | | 12/16/2014 | | PASS |
Dave Abo
|
|
|
Parcel A on ROS 9921.
|
Routing - Design Review | 12/11/2014 | | 12/16/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 12/11/2014 | | 12/12/2014 | | PASS |
Daryl Spivey
|
|
|
|
Routing - Erosion and Sediment | 12/11/2014 | | 12/12/2014 | | PASS |
Evan Jenkins
|
|
|
Construct a 9,000 SF new building consisting of a fabrication area with support spaces.
|
Routing PW Street Lights | 12/11/2014 | | 12/12/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing PW Sewer Design | 12/11/2014 | | 12/11/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 12/11/2014 | | 12/11/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 12/11/2014 | | 12/11/2014 | | PASS |
Emily Dixon
|
|
|
Parcel number corrected to R3138970052.
|
Routing - PUBLIC WORKS | 12/11/2014 | | 12/11/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 12/11/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 12/11/2014 | | 12/11/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 12/8/2014 | | FAIL |
Sam Zahorka
|
|
|
see the circled items on the intake submittal chaecklist.
|
Application received | | | 12/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2014 2:00PM
|
Routing - PLAN CHECK | 3/25/2015 | | | | |
Adele J Schaffeld-Griffin
|
|
|
|