BLD-Final | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Jim Storey
|
|
|
josh Phone #: ###-#### - call prior to access
|
DOC - Permit Finaled | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 8/19/2015 | 8/19/2015 | 8/19/2015 | | DONE |
Jason C. Taylor
|
|
|
Recieved structural calculations and approval letter for construction of the wall from structural engineer (Structural Edge Engineering). Occupancy may be given when building department is ready. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 7/27/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Bruce Eggleston
|
|
|
poured concrete driveway over 33 feet wide. Will remove a portion and landscape to make two driveways.
|
PubWorks Temp Occupancy Appr | 7/16/2015 | 7/16/2015 | 7/16/2015 | | FAIL |
Jason C. Taylor
|
|
|
***NO OCCUPANCY TO BE GIVEN**** WORK DONE WITHOUT PERMITS AND P&Z APPROVAL. JASON TAYLOR ###-####.
|
BLD-Final | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | NR |
Jim Storey
|
|
|
Josh Phone #: ###-#### need ele and pw
|
BLD-Final | 6/3/2015 | 6/4/2015 | 6/4/2015 | A | NR |
Jim Storey
|
|
|
Josh Phone #: ###-#### ele and pw
|
BLD-Energy code compliance | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Jim Storey
|
|
|
josh Phone #: ###-####
|
BLD-Framing/Rough-in | 3/30/2015 | 3/30/2015 | 3/30/2015 | P | PASS |
Jim Storey
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PASS |
Jim Storey
|
|
|
Josh Phone #: ###-####
|
BLD-Foundation | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-#### geo-tec letter ok and on file per j willie.
|
BLD-Footing | 2/13/2015 | 2/13/2015 | 2/17/2015 | P | FAIL |
Jim Sly
|
|
|
Adam// pour time 2pm Phone #: ###-#### At time I was there for an inspection, Subgrade was not approved. Left the jobsite and waited for a call from Contractor letting me know that subgrade was approved so I could verify and pass. That never happened. Never got a Telephone call. Still need Subgrade approval per Jason Taylor.
|
OVERRIDE | | | 2/12/2015 | | |
|
|
|
|
Plan assigned to (JG) | | 12/4/2014 | 2/12/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 12/22 M L2 Hillside** Pending hillside
|
Issue PAID IN FULL permit | | | 2/12/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Routing PW Grading-Hillside | 2/12/2015 | | 2/12/2015 | | PASS |
Jason C. Taylor
|
|
|
New grading plan approved (Riveridge 2-11-15) Jason Taylor ###-####. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | 2/12/2015 | | 2/12/2015 | | PASS |
Colleen T Carroll
|
|
|
Revised Site Plan provides 30' WUI
|
Case Summary (BLD) | | | 2/12/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
Christina Prado
|
|
|
All requirements met - Call Josh Baker as well as Westminster Homes for pick up
|
Routing - PLAN CHECK | 2/5/2015 | | 2/11/2015 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 2/11/2015 | | DONE |
|
|
|
Received 3 copies of the Erosion & Sediment control plan and 3 copies of pages 1 and 2 of the graining and drainage plan- put with plans on Javier's desk
|
Plan resubmittals received | | | 2/10/2015 | | DONE |
Christina Prado
|
|
|
Received two full revised sets of plans marked A1,A2, A3, A4, A5, A6, A7, A8, A9, A10 & A11 as well as two sets revised structural calcs;Plans taken to Javier for further review
|
Routing PW Grading-Hillside | 2/5/2015 | | 2/10/2015 | | FAIL |
Jason C. Taylor
|
|
|
Need new grading plans for new footprint of house. Jason Taylor ###-####.
|
Routing - PLAN CHECK | 2/5/2015 | | 2/5/2015 | | FAIL |
Javier Guzman
|
|
|
emailed applicant review report
|
Plan resubmittals received | | | 2/2/2015 | | DONE |
Candy A. Nichols
|
|
|
resubmittals received 2 sets of sheet:A1, A2, A3, A4, A5, A7, A8, A9, A10, A10.1, A1 1-took to mJG
|
Plan resubmittals received | | | 1/9/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked A2; Plans stamped and taken to Javier for review
|
Routing - PLAN CHECK | 12/23/2014 | | 1/9/2015 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 1/6/2015 | | DONE |
|
|
|
received two sets of plans- put with plans
|
1st review completed | | | 12/23/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | | | 12/23/2014 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Routing - FIRE | 12/16/2014 | 12/4/2014 | 12/19/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department Vehicle Access.
|
Routing - MECHANICAL | | | 12/16/2014 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 12/16/2014 | | 12/16/2014 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED) Permit for the construction of a new 4286 sq. ft., two story (first story 2452 sq. ft., second story 1834 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 755 sq. ft. of covered patio’s/porches and 1040 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning.
|
Routing - PLANNING | 12/10/2014 | | 12/15/2014 | | PASS |
Leon Letson
|
|
|
* A maintenance agreement with the Elevation Ridge Owner's Association must be established to meet the WUI 30' Defensible Space requirement.
|
Routing - Addressing | 12/9/2014 | | 12/10/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2014 | | 12/10/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 12/10/2014 | | 12/10/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 12/4/2014 | | PASS |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/4/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLANNING | 2/5/2015 | | 2/5/2014 | | PASS |
Leon Letson
|
|
|
* A maintenance agreement with the Elevation Ridge Owner's Association must be established to meet the WUI 30' Defensible Space requirement.
|
Application received | | 12/4/2014 | | | |
|
|
|
|