Permit Information
Permit NumberBLD14-03528
StatusFinaled
Name TBL CONSTRUCTION
Site Address 1403 N 10TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
## 4-1-2012 THIS PERMIT IS MODIFIED TO REFLECT THE APPROVAL OF THE NEW DETACHED GARAGE THROUGH DRH14-00391 ALL OTHER PLAN REVIEQW NOTES APPLY. 440S.F. GARAGE AND 308S.F. UNFINISHED STORAGE SPACE ABOVE THAT IS ACCESSED BY AN EXTERIOR STAIRWAY. ADDED VALUE $10,200.00 4-1-2015 pep ###**1/26/15 Plan addendum to construct roof framing and second and first floor framing per attached engineering. Work to include basement expanded footings per engineering//leg*** 12-22-2014 This project is starting the 2nd phase that includes the erection of forms and the placement of concrete and reinforcing for the new basement foundation for this single family dwelling. All work is to per the engineer's details dated 12-22-2014. Phase 3 will include a completed engineering package and specific explanation of work to be completed. **Added Value $50,000.00. **All per the approved plan sheets dated 12-22-2014 pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/1/201510/6/201510/6/2015APASS
DetailsTony Young
Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
DOC - Permit Finaled10/6/201510/6/201510/6/2015APASS
DetailsTony Young
BLD-Final9/30/201510/1/201510/1/2015APART
DetailsTony Young
Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, ok pending address #s
BLD-Conference9/30/20159/30/20159/30/2015PPASS
DetailsTony Young
Electrical has been called in for this morning. And the fixes are corrected. Historical has been scheduled for early afternoon. Please call me as discussed last night. Thank you much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, conf on final
Zoning Approval9/30/20159/30/20159/30/2015 DONE
DetailsMatthew A Halitsky
BLD-Framing/Rough-in7/6/20157/6/20157/6/2015PPART
DetailsTony Young
Garage framing only. Call Tim with any issues

Thank you much

Tim Phone #: ###-#### Inspection requested via web by Timothy ,, ok to insulate
BLD-Wall Bracing5/17/20155/18/20155/18/2015APASS
DetailsTony Young
Shear inspection - call Tim if there are any issues. Thank you much Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Energy code compliance5/5/20155/6/20155/6/2015APASS
DetailsTony Young
Call Tim if any problems or issues.

Thanks, Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, ok to cover house now
BLD-Energy code compliance5/4/20155/5/20155/5/2015APART
DetailsTony Young
Call Tim if any problems or issues.

Thanks, Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, still need fire place rough in,, ok to cover unaffected areas
BLD-Energy code compliance5/4/20155/4/20155/4/2015PPART
DetailsTony Young
Call Tim if any problems or issues.

Thanks, Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, need fireplace rough pass
Plan Modification Accepted  4/29/2015  
new manual j
Routing - MECHANICAL4/29/2015 4/29/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Framing/Rough-in4/21/20154/23/20154/23/2015APART
DetailsMike Jordan
Tim is available by phone before 9 and will be available after 9 and before 12 in person. Please call if any issues. Thank you much Phone #: ###-#### Inspection requested via web by Timothy Beaudoin. Needs to fire block all furdowns, above fireplace. Squash block under LVL upstairs, strap new construction to old construction north wall. Ok to insulate.
Routing - MECHANICAL4/21/2015 4/21/2015 PASS
DetailsTroy James
Routing Walk-In (BLD)4/1/20154/1/20154/1/2015ADONE
DetailsPerry Paine
Inspection Record Card- Bld  4/1/2015  
PLANS/APPL TAKEN TO FRONT DESK  4/1/2015 DONE
CHANGE STATUS TO (ISS)  4/1/2015 DONE
BLD-Footing3/31/20153/31/20153/31/2015PPART
DetailsTony Young
garage ftgs
BLD-Conference2/13/20152/13/20152/13/2015PPASS
DetailsTony Young
Mark Phone #: ###-####,, house is on the new foundation
Routing Walk-In (BLD)1/26/20151/26/20151/26/2015APASS
DetailsTisha Gallop
Case Summary (BLD)  1/26/2015 DONE
Inspection Record Card- Bld  1/26/2015 DONE
BLD-Foundation1/8/20151/9/20151/9/2015APART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, basement walls ok,, will add heat for cure
BLD-Footing12/31/201412/31/201412/31/2014PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, house basement footings ok
BLD-Footing12/30/201412/31/201412/31/2014APASS
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, heaters and tenting/ blankets on site,, will heat for 3 days
BLD-Footing12/28/201412/29/201412/29/2014PCANC
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Conference12/29/201412/29/201412/29/2014PPEND
DetailsDave Hannah
Call Tim please. Reference concrete pour in cold conditions.

Thank you much Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
Routing Walk-In (Zoning)12/22/201412/22/201412/22/2014APASS
DetailsMatthew A Halitsky
Routing Walk-In (BLD)12/22/201412/22/201412/22/2014ADONE
DetailsPerry Paine
Case Summary (BLD)  12/22/2014  
Inspection Record Card- Bld  12/22/2014  
PLANS/APPL TAKEN TO FRONT DESK  12/22/2014 DONE
CHANGE STATUS TO (ISS)  12/22/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  12/8/2014  
Routing Walk-In (Zoning)12/8/201412/8/201412/8/2014PDONE
DetailsPerry Paine
Routing Walk-In (BLD)12/8/201412/8/201412/8/2014PDONE
DetailsPerry Paine
Plan assigned to (PEP)12/8/201412/8/201412/8/2014 PASS
DetailsPerry Paine
Inspection Record Card- Bld  12/8/2014  
1st review completed  12/8/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/8/2014 DONE
Permit Ready to Issue  12/8/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  12/8/2014 DONE
DetailsChristina Prado
Application received 12/8/2014