Permit Information
Permit NumberBLD14-03533
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 11789 W EXECUTIVE DR
Project NameDiversified Fluid Solutions
Customer Number 
ePlanReviewYes
Description
(DIVERSIFIED FLUID SOLUTIONS) //1-13-2020 There is a Men’s & Women’s restroom fixture ratio approval see attached document, any changes in workforce Men’s & Women’s percentages may require alterations to the restrooms. JG// **PRIORITY REVIEW** Remodel for new tenant with offices and industrial work areas in a 37,555 sq. ft. space per approved plans. Work to include removal and construction of new interior nonbearing partition walls new accessible restrooms in the fabrication area and a new unisex shower for the fabrication area, placement of a new RTU and the installation of miscelaneous equipment. No racking over 8 feet in height is allowed under this permit. This is a fully sprinklered building for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  1/13/2020 DONE
DetailsJavier Guzman
added a Men’s & Women’s restroom fixture ratio approval see attached document, any changes in workforce Men’s & Women’s percentages may require alterations to the restrooms.
Third Notice 5/9/20156/9/2015 DONE
Second Notice 3/13/20155/4/2015 DONE
First Notice 2/28/20153/3/2015 DONE
mailed 3-3-15
BLD-Final2/17/20152/18/20152/18/2015APASS
DetailsMike Jordan
Dylan Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  2/18/2015 DONE
DetailsCandy A. Nichols
BLD-Final2/12/20152/13/20152/13/2015APART
DetailsMike Jordan
Dillion Phone #: ###-####. Ok for temp occ. Needs to provide ADA restroom sign provide flusher on toilet in mens restroom on turning side, Provide a high/low drinking fountain. A racking permit is also required.
Temporary Occupancy2/13/20155/14/20152/13/2015 DONE
DetailsChristina Prado
FIRE-Final Inspection2/12/20152/12/20152/12/2015PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection2/10/20152/11/20152/11/2015AFAIL
DetailsTroy Cobbley
Provide the four exit discharge lights as per the approved plans.
FIRE-Sprinkler Rough-in2/9/20152/9/20152/9/2015PCANC
DetailsTroy Cobbley
wrong permit called in.
BLD-Ceiling Grid Inspection2/5/20152/5/20152/5/2015PPASS
DetailsMike Jordan
Dillon Phone #: ###-####
BLD-Ceiling Grid Inspection2/3/20152/4/20152/4/2015AFAIL
DetailsMike Jordan
Dillon Phone #: ###-####. Needs to provide clips on permiter to prevent the runners from spreading.
BLD-Framing/Rough-in1/13/20151/14/20151/14/2015APASS
DetailsMike Jordan
Dillion Phone #: ###-####. INterior steel stud framed walls for restroom package. Hardlids are ok, but still needs fire sprinkler rough in inspection.
BLD-Framing/Rough-in1/7/20151/7/20151/7/2015PPASS
DetailsMike Jordan
Dillon Phone #: ###-####. All interior steel stud framed walls except for restrooms ok. N o grid at this time.
BLD-Framing/Rough-in1/6/20151/7/20151/7/2015ANR
DetailsMike Jordan
Dillon Phone #: ###-####. No city approved plans. Electrical rough in completed. Ok to start one side with shhretrock. Contractor will recall inspection for this afternoon or tomorrow morning.
Permit Ready to Issue  1/5/2015 DONE
Issue PAID IN FULL permit  1/5/2015 DONE
Print Occupancy Form  1/5/2015 DONE
Plan assigned to (CDM)12/12/201412/12/201412/30/2014 PASS
DetailsCarl D Madsen
**Priority Review** Level 3 TI - ePlanReview - Diversified Fluid Solutions
Routing - PLAN CHECK12/30/2014 12/30/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  12/30/2014 DONE
1st review completed  12/29/2014 FAIL
Routing - PLAN CHECK12/12/2014 12/29/2014 FAIL
DetailsCarl D Madsen
Routing - FIRE12/12/201412/12/201412/22/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Routing PW Solid Waste12/12/2014 12/22/2014 PASS
DetailsPeter J. McCullough
Routing - MECHANICAL12/18/2014 12/18/2014 PASS
DetailsTroy James
Routing - MECHANICAL12/12/2014 12/16/2014 FAIL
DetailsTroy James
Routing - PLUMBING12/12/2014 12/12/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing PW Environmental12/12/2014 12/12/2014 PASS
DetailsRick Christenson
As long as manufacturing processes do not differ from current facility at 335 N Steelhead Way, no additional Pretreatment requirements exist. If new, wet processes are being added, please contact Boise City Pretreatment (###-####) for evaluation and regulatory guidance.
Routing PW Sewer Rating12/12/2014 12/12/2014 PASS
DetailsJennifer Bruner
Routing - Addressing12/12/2014 12/12/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS12/12/2014 12/12/2014 PASS
DetailsJennifer Bruner
Intake Approval  12/12/2014 PASS
DetailsJason Blais
Prescreen passed by Carl Westfall and plan review fees paid.
Pending Assignment by JCB12/12/2014 12/12/2014 DONE
DetailsJason Blais
Intake Approval  12/10/2014 FAIL
(12-10-14) Please refer to the annotations on the plan intake checklist. The circled items require resolution. CJW
Application received  12/8/2014 DONE
Application submitted via PDS Online on Dec 8 2014 4:56PM