Permit Information
Permit NumberBLD14-03545
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 1150 N CURTIS RD
Project NameBureau of Reclamation
Customer Number 
ePlanReviewYes
Description
(BUREAU OF RECLAMATION) Tenant Improvement to the interior of all three floors of this existing 79,369 building per plans.
Exterior site improvements will be made to bring parking and access up to current codes, addition of security fencing and addition of covered car and bike parking. Demo permit under BLD14-03598. All building sprinkler and alarm systems must be maintained. This building is fully Fire Sprinklered for area increase and has an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/26/2016 DONE
Third Notice 1/19/20162/11/2016 DONE
Third Notice 12/15/20151/14/2016 DONE
Second Notice 11/19/201512/10/2015 DONE
Mailed 12-11-15
First Notice 10/10/201511/9/2015 DONE
Mailed 11-10-15
BLD-Final9/29/20159/30/20159/30/2015APASS
DetailsJim Sly
Colyn Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  9/30/2015 DONE
FIRE-Final Inspection9/23/20159/24/20159/24/2015APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval9/23/20159/23/20159/23/2015 PASS
DetailsJosh Wilson
BLD-Ceiling Grid Inspection9/8/20159/8/20159/8/2015PPASS
DetailsJim Sly
Colyn Phone #: ###-####
Temporary Occupancy9/2/201512/1/20159/2/2015 DONE
DetailsCandy A. Nichols
Temporary Occupancy9/2/201512/1/20159/2/2015 DONE
DetailsCandy A. Nichols
see extension letter
Telephone call  8/31/2015 DONE
called Jackie about the temp c of o-she will email Jason Blais before 9/2 to ask for an extension
BLD-Framing/Rough-in8/5/20158/6/20158/6/2015APASS
DetailsJim Sly
Colyn-3rd floor Phone #: ###-####
Meeting  6/24/2015 DONE
Discussed Project with Scott A. (Fire Manager) and agreed to extend TCO by 30 day timeframe to complete work. TLW
Temporary Occupancy6/4/20159/2/20156/4/2015 DONE
DetailsCandy A. Nichols
BLD-Final5/29/20156/3/20156/3/2015APART
DetailsJim Sly
Colyn Phone #: ###-####
Temp Occ. OK.....Floors 1 and 2
FIRE-Final Inspection5/29/20156/2/20156/2/2015APART
DetailsTroy Cobbley
A temporary occupancy for the life safety is being given for the 1st and 2nd floors until the 3rd floor is complete. The door mags and the hvac shutdown, as previously discussed, needs to be addressed prior to a final sign off.
Zoning Approval Temp6/1/20156/1/20156/1/2015 PASS
DetailsJosh Wilson
30 day temp ok
BLD-Ceiling Grid Inspection5/4/20155/4/20155/5/2015PPASS
DetailsJim Sly
Phone #: ###-####
BLD-Ceiling Grid Inspection4/8/20154/9/20154/9/2015APART
DetailsJim Sly
Colyn Phone #: ###-####
OK to do perimeters and sprinkler penitrations. most lights are in and ok. Call back to inspect remaining lights.
BLD-Framing/Rough-in2/6/20152/6/20152/6/2015PPART
DetailsJim Sly
Colyn Phone #: ###-####
1st and 2nd floors only.....OK
Issue PAID IN FULL permit  1/21/2015 DONE
DetailsCandy A. Nichols
Print Occupancy Form  1/21/2015 DONE
DetailsCandy A. Nichols
OVERRIDE  1/20/2015  
Permit Ready to Issue  1/20/2015 DONE
DetailsChristina Prado
Plan assigned to (SRZ)12/11/201412/11/20141/16/2015 PASS
DetailsSam Zahorka
1st review completed. Level 3 TI - ePlanReview - Bureau of Reclamation
PLANS/APPL TAKEN TO FRONT DESK  1/16/2015 DONE
DetailsSam Zahorka
Routing - MECHANICAL1/16/2015 1/16/2015 PASS
DetailsTroy James
Routing - PLAN CHECK1/16/2015 1/16/2015 PASS
DetailsSam Zahorka
1st review completed  1/9/2015 DONE
DetailsSam Zahorka
Routing - PLAN CHECK12/11/2014 1/9/2015 FAIL
DetailsSam Zahorka
Routing - Design Review12/11/2014 12/29/2014 PASS
DetailsJosh Wilson
Ok per DRH14-00434
Routing - MECHANICAL12/11/2014 12/19/2014 FAIL
DetailsTroy James
need comcheck
Routing - FIRE12/11/201412/11/201412/17/2014 PASS
DetailsScott Arellano
Attached plan review comments to plans.
Routing PW Sewer Rating12/12/2014 12/15/2014 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment12/11/2014 12/12/2014 PASS
DetailsEvan Jenkins
(BUREAU OF RECLAMATION) Tenant Improvement to interior of building.
Exterior site improvements will be made to bring parking and access up to current codes, addition of security fencing and addition of covered car and bike parking.
Routing - PLUMBING12/11/2014 12/12/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - Addressing12/11/2014 12/12/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS12/11/2014 12/12/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCB12/11/2014 12/11/2014 DONE
DetailsJason Blais
Application received  12/10/2014 DONE
Application submitted via PDS Online on Dec 10 2014 8:52AM
Intake Approval  12/10/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.