Permit Information
Permit NumberBLD14-03559
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 3201 W AIRPORT WAY
Project NameCross Grain Brewhouse
Customer NumberBLD15-00751
ePlanReviewYes
Description
(CROSS GRAIN BREWHOUSE - CITY OF BOISE AIR TERMINAL - 2ND STORY – “Concourse B”) Fire sprinklers used for fire area. This permit is to remodel an existing 2,098 square foot restaurant. PLAN MODIFICATION 3-31-15 – Modification submitted to create two restaurants that share the same kitchen area. Café Del Sol will now occupy a 180 square foot area under BLD15-00751. Work is to include: construct interior non-bearing walls to enclose kitchen area, installation of new lighting, installation of new mechanical ductwork, installation of new ceilings, installation of new accessible counter, installation of new equipment under existing hood, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/20/20156/25/2015 DONE
This permit finaled on the web by Karen Trusty
First Notice 5/23/20156/10/2015 DONE
Mailed out 6-10-15
BLD-Final5/13/20155/13/20155/13/2015PPASS
DetailsJim Storey
Trent Phone #: ###-####
Permanent Occupancy  5/13/2015 DONE
FIRE-Final Inspection5/7/20155/8/20155/8/2015APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final5/6/20155/7/20155/7/2015PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Trent Green need exit sign at passage door fire to locate sign
Print Occupancy Form  4/15/2015 DONE
Routing - FIRE4/13/20154/13/20154/13/2015 PASS
DetailsScott Arellano
Attached comments to plans.
PLANS/APPL TAKEN TO FRONT DESK  4/13/2015 DONE
CHANGE STATUS TO (ISS)  4/13/2015 DONE
Plan assigned to (TLW)3/16/2015 4/13/2015 PASS
DetailsTim L. Woodard
Routing - PLUMBING3/18/2015 3/18/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Plan Modification Accepted  3/16/2015 DONE
DetailsTim L. Woodard
Plan Modification to reduce tenant space size and add additional tenant in left over area. The new tenant will be "Cafe Del Sol" and will be permitted under BLD15-00751. TLW
BLD-Wall cover2/26/20152/27/20152/27/2015APASS
DetailsJim Storey
before lunch please Phone #: ###-#### Inspection requested via web by Trent Green
BLD-Conference2/25/20152/26/20152/26/2015PCANC
DetailsJim Storey
Job site walk Phone #: ###-#### Inspection requested via web by Trent Green
Permit Ready to Issue  1/20/2015 DONE
Issue PAID IN FULL permit  1/20/2015 DONE
DetailsCandy A. Nichols
Print Occupancy Form  1/20/2015 DONE
DetailsCandy A. Nichols
PLANS/APPL TAKEN TO FRONT DESK  1/12/2015 DONE
Plan assigned to (TLW)12/15/2014 1/12/2015 PASS
DetailsTim L. Woodard
Level 3 TI - ePlanReview - Cross Grain Brewhouse in Airport
Routing - PLAN CHECK12/30/2014 1/9/2015 PASS
DetailsTim L. Woodard
Routing - MECHANICAL12/30/2014 1/2/2015 PASS
DetailsTroy James
1st review completed  12/24/2014 DONE
Routing - PLAN CHECK12/15/2014 12/24/2014 FAIL
DetailsTim L. Woodard
Refer to changemarks in e-plan review. TLW
Routing - FIRE12/15/201412/15/201412/23/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - MECHANICAL12/15/2014 12/16/2014 FAIL
DetailsTroy James
Routing - PLUMBING12/15/2014 12/16/2014 PASS
DetailsBill VanDegrift
AAV cannot be used on commercial venting. G/I vent to go out by itself or to existing sanitary if cannot go out by itself.
Routing - Addressing12/15/2014 12/15/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS12/15/2014 12/15/2014 PASS
DetailsBeverly Mountain
Plan Reviewer's activity  12/15/2014 PASS
DetailsCarl Westfall
Plan intake review approved
Intake Approval  12/15/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Westfall and plan review fees paid.
Pending Assignment by JCB12/15/2014 12/15/2014 DONE
DetailsJason Blais
Application received  12/11/2014 DONE
Application submitted via PDS Online on Dec 11 2014 12:58PM