Permanent Occupancy | | | 2/4/2015 | | DONE |
|
|
|
|
BLD-Final | 12/22/2014 | 12/30/2014 | 12/30/2014 | P | PASS |
Phil Shearer
|
|
|
|
FIRE-Final Inspection | 12/19/2014 | 12/23/2014 | 12/23/2014 | A | PASS |
Forrest France
|
|
|
Life safety passed provided the manual thumbturn at the main entry/exit is removed and replaced with a keyed operated lock from the egress side and two cover plates are installed at open light fixture junction boxes. Items to be finished prior to structural final inspection as discussed with tenant.
|
Issue PAID IN FULL permit | | | 12/19/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 12/17/2014 | | 12/18/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 12/16/2014 | | 12/18/2014 | | PASS |
Rick Christenson
|
|
|
Approved per routing sheet. TLW
|
Plan assigned to (TLW) | | | 12/18/2014 | | PASS |
|
|
|
|
1st review completed | | | 12/18/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/18/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/18/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 12/18/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/18/2014 | | DONE |
Christina Prado
|
|
|
called Diane to advise permit is ready for pick up
|
Routing - PUBLIC WORKS | 12/16/2014 | | 12/17/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 12/12/2014 | | 12/16/2014 | | PASS |
Jason C. Taylor
|
|
|
Verified addresses onsite. All Ok. Jason Taylor ###-####
|
Routing PW Sewer Rating | 12/16/2014 | | 12/16/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/12/2014 | | DONE |
|
|
|
|
Application received | | 12/12/2014 | | | |
|
|
|
|