Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03579
StatusFinaled
Name ESI
Site Address 1620 N 13TH ST
Project NameStinker Store
Customer Number 
ePlanReviewYes
Description
(STINKER STORE) Permit for new 587 sq. ft. addition to existing 2,400 sq. ft. building and interior remodel within the existing convenience store per approved plans. New total building area will be 2,987 sq. ft. Work to include new exterior site work per approved plans. Demolition shall be per approved plans. The interior restrooms will be relocated to provide 2 new ADA compliant restrooms. The new layout will include fixtures, nonbearing walls, and new interior coolers. Special inspection required. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/22/2015 DONE
First Notice 5/22/20156/10/2015 DONE
Mailed out 6-10-15
Permanent Occupancy  5/12/2015 DONE
BLD-Final5/8/20155/8/20155/8/2015PPASS
DetailsDave Hannah
I will be on site all day thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
FIRE-Final Inspection5/4/20155/6/20155/6/2015PPASS
DetailsTroy Cobbley
fire/life safety passed. The two exit discharge lights and two emergency can lights to be repaired prior to a building inspection sign off. Also provide verification to the building inspector that the thumbturn deadbolts provided on the restroom doors meets ADA
Zoning Approval5/4/20155/4/20155/4/2015 DONE
DetailsMatthew A Halitsky
BLD-Framing/Rough-in4/22/20154/22/20154/22/2015PPASS
DetailsJim Storey
soffit cover above cooler box, will be ready by noon, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
BLD-Energy code compliance4/14/20154/14/20154/14/2015PPASS
DetailsTony Young
restroom wall insulation only, early after lunch, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
BLD-Energy code compliance4/13/20154/13/20154/13/2015PPART
DetailsTony Young
above cooler/freezer box ceiling insulation only, early afternoon if possible, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, insulation ok,, ok to one side walls pending trades
BLD-Energy code compliance4/7/20154/7/20154/7/2015PPASS
DetailsTony Young
Changed inspection to afternoon, interior perimeter wall rigid insulation, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
BLD-Energy code compliance4/7/20154/7/20154/7/2015ACANC
DetailsTony Young
interior perimeter wall rigid insulation, thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
BLD-Concrete4/2/20154/3/20154/3/2015APART
DetailsTony Young
Rebar and vapor barrier for expansion slab, pour is at 10:30 am, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
BLD-Energy code compliance4/2/20154/2/20154/2/2015PCANC
DetailsTony Young
interior perimeter wall rigid board, after 1:30 thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
BLD-Framing/Rough-in3/26/20153/26/20153/26/2015APART
DetailsTony Young
roof nailing inspection required and truss inspection Phone #: ###-#### Inspection requested via web by Miles Hash,, roof ok
BLD-Foundation3/13/20153/13/20153/14/2015PPEND
DetailsTony Young
2:00 grout pour, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, top grout pour,, ok pending special inspection report
BLD-Wall Bracing3/12/20153/13/20153/13/2015PPART
DetailsTony Young
2:00 grout pour, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, S.I. on site
BLD-Wall Bracing3/11/20153/12/20153/12/2015PPART
DetailsTony Young
2nd lift grout pour at 2:00pm, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, special inspector on site,, work in progress,, pending report
BLD-Wall Bracing3/11/20153/11/20153/11/2015PPASS
DetailsPhil Shearer
2:30 grout pour on the 1st lift, MTI will be on site. thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash. 1st lift OK
BLD-Foundation2/26/20152/27/20152/27/2015APART
DetailsTony Young
Have a 1:00 pour, MTI will be on site for epoxy, rebar and concrete inspections. Thanks Miles Hash Phone #: ###-#### Inspection requested via web by Miles Hash,, ok pending special inspection report
BLD-Footing2/25/20152/26/20152/26/2015PPASS
DetailsTony Young
Have a 1:00 pour, MTI will be on site for epoxy, rebar and concrete inspections. Thanks Miles Hash Phone #: ###-#### Inspection requested via web by Miles Hash,, special inspector on site also
Issue PAID IN FULL permit  2/24/2015 DONE
DetailsChristina Prado
Print Occupancy Form  2/24/2015 DONE
DetailsChristina Prado
OVERRIDE  2/20/2015  
Plan assigned to (AJS)1/2/20151/2/20152/20/2015 PASS
DetailsJason Blais
1st review completed Comm Addition & Remodel - ePlanReview - Stinker Store
Print Occupancy Form  2/20/2015 DONE
Routing - PLAN CHECK2/20/2015 2/20/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/20/2015 DONE
Permit Ready to Issue  2/20/2015 DONE
Need ACHD for issuance, all other requirements met///c_p
Routing - PLAN CHECK2/2/2015 2/9/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Route to Impact Fee Review1/23/20151/26/20151/26/2015 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK1/2/2015 1/23/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  1/23/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - Design Review1/2/2015 1/13/2015 PASS
DetailsMatthew A Halitsky
Matt Halitsky - DRH14-00383
Routing PW Solid Waste1/2/2015 1/13/2015 PASS
DetailsPeter J. McCullough
Routing - FIRE1/2/20151/2/20151/12/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing PW Environmental1/2/2015 1/6/2015 PASS
DetailsRick Christenson
Routing - PUBLIC WORKS1/2/2015 1/5/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment1/2/2015 1/5/2015 PASS
DetailsEvan Jenkins
SITE PREP INSPECTION REQUIRED:
(STINKER STORE) New 587 sq. ft. addition to existing 2,400 sq. ft. building and interior remodel within the existing convenience store per approved plans. New total building area will be 2,987 sq. ft.
Routing PW Sewer Rating1/2/2015 1/5/2015 PASS
DetailsJennifer Bruner
Routing PW Street Lights1/2/2015 1/2/2015 PASS
DetailsMike D Hedge
Routing PW Drainage1/2/2015 1/2/2015 PASS
DetailsBrian Murphy
less than 1`000sqft
Routing PW Sewer Design1/2/2015 1/2/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PLUMBING1/2/2015 1/2/2015 PASS
DetailsBill VanDegrift
additional cross connection protection may be required
Routing - Addressing1/2/2015 1/2/2015 PASS
DetailsEmily Dixon
Pending Assignment by JCB1/2/2015 1/2/2015 DONE
DetailsJason Blais
Intake Approval  12/30/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Westfall and plan review fees paid.
Plan Reviewer's activity  12/15/2014 PASS
DetailsCarl Westfall
Plan intake review approved
Application received  12/12/2014 DONE
Application submitted via PDS Online on Dec 12 2014 10:50AM