Print Statement | | | 6/22/2015 | | DONE |
|
|
|
|
First Notice | | 5/22/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Permanent Occupancy | | | 5/12/2015 | | DONE |
|
|
|
|
BLD-Final | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Dave Hannah
|
|
|
I will be on site all day thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
FIRE-Final Inspection | 5/4/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Troy Cobbley
|
|
|
fire/life safety passed. The two exit discharge lights and two emergency can lights to be repaired prior to a building inspection sign off. Also provide verification to the building inspector that the thumbturn deadbolts provided on the restroom doors meets ADA
|
Zoning Approval | 5/4/2015 | 5/4/2015 | 5/4/2015 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Framing/Rough-in | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Jim Storey
|
|
|
soffit cover above cooler box, will be ready by noon, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Tony Young
|
|
|
restroom wall insulation only, early after lunch, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PART |
Tony Young
|
|
|
above cooler/freezer box ceiling insulation only, early afternoon if possible, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, insulation ok,, ok to one side walls pending trades
|
BLD-Energy code compliance | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Tony Young
|
|
|
Changed inspection to afternoon, interior perimeter wall rigid insulation, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | CANC |
Tony Young
|
|
|
interior perimeter wall rigid insulation, thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
|
BLD-Concrete | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PART |
Tony Young
|
|
|
Rebar and vapor barrier for expansion slab, pour is at 10:30 am, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | CANC |
Tony Young
|
|
|
interior perimeter wall rigid board, after 1:30 thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
|
BLD-Framing/Rough-in | 3/26/2015 | 3/26/2015 | 3/26/2015 | A | PART |
Tony Young
|
|
|
roof nailing inspection required and truss inspection Phone #: ###-#### Inspection requested via web by Miles Hash,, roof ok
|
BLD-Foundation | 3/13/2015 | 3/13/2015 | 3/14/2015 | P | PEND |
Tony Young
|
|
|
2:00 grout pour, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, top grout pour,, ok pending special inspection report
|
BLD-Wall Bracing | 3/12/2015 | 3/13/2015 | 3/13/2015 | P | PART |
Tony Young
|
|
|
2:00 grout pour, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, S.I. on site
|
BLD-Wall Bracing | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | PART |
Tony Young
|
|
|
2nd lift grout pour at 2:00pm, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, special inspector on site,, work in progress,, pending report
|
BLD-Wall Bracing | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | PASS |
Phil Shearer
|
|
|
2:30 grout pour on the 1st lift, MTI will be on site. thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash. 1st lift OK
|
BLD-Foundation | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PART |
Tony Young
|
|
|
Have a 1:00 pour, MTI will be on site for epoxy, rebar and concrete inspections. Thanks Miles Hash Phone #: ###-#### Inspection requested via web by Miles Hash,, ok pending special inspection report
|
BLD-Footing | 2/25/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Tony Young
|
|
|
Have a 1:00 pour, MTI will be on site for epoxy, rebar and concrete inspections. Thanks Miles Hash Phone #: ###-#### Inspection requested via web by Miles Hash,, special inspector on site also
|
Issue PAID IN FULL permit | | | 2/24/2015 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 2/24/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/20/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 1/2/2015 | 1/2/2015 | 2/20/2015 | | PASS |
Jason Blais
|
|
|
1st review completed Comm Addition & Remodel - ePlanReview - Stinker Store
|
Print Occupancy Form | | | 2/20/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/20/2015 | | 2/20/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/20/2015 | | DONE |
|
|
|
Need ACHD for issuance, all other requirements met///c_p
|
Routing - PLAN CHECK | 2/2/2015 | | 2/9/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 1/23/2015 | 1/26/2015 | 1/26/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 1/2/2015 | | 1/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 1/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 1/2/2015 | | 1/13/2015 | | PASS |
Matthew A Halitsky
|
|
|
Matt Halitsky - DRH14-00383
|
Routing PW Solid Waste | 1/2/2015 | | 1/13/2015 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - FIRE | 1/2/2015 | 1/2/2015 | 1/12/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Environmental | 1/2/2015 | | 1/6/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing - PUBLIC WORKS | 1/2/2015 | | 1/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 1/2/2015 | | 1/5/2015 | | PASS |
Evan Jenkins
|
|
|
SITE PREP INSPECTION REQUIRED:
(STINKER STORE) New 587 sq. ft. addition to existing 2,400 sq. ft. building and interior remodel within the existing convenience store per approved plans. New total building area will be 2,987 sq. ft.
|
Routing PW Sewer Rating | 1/2/2015 | | 1/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Street Lights | 1/2/2015 | | 1/2/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Drainage | 1/2/2015 | | 1/2/2015 | | PASS |
Brian Murphy
|
|
|
less than 1`000sqft
|
Routing PW Sewer Design | 1/2/2015 | | 1/2/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLUMBING | 1/2/2015 | | 1/2/2015 | | PASS |
Bill VanDegrift
|
|
|
additional cross connection protection may be required
|
Routing - Addressing | 1/2/2015 | | 1/2/2015 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 1/2/2015 | | 1/2/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 12/30/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Westfall and plan review fees paid.
|
Plan Reviewer's activity | | | 12/15/2014 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Application received | | | 12/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2014 10:50AM
|