BLD-Final | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 10/15/2015 | 10/15/2015 | 10/15/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | PART |
Phil Shearer
|
|
|
Eric Phone #: ###-#### Missing truss bracing. Missing truss hangers on J12 and J13. OK to insulate.
|
BLD-Other | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | PASS |
Phil Shearer
|
|
|
Fire rated soffit - Eric Phone #: ###-####
|
BLD-Wall Bracing | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Phil Shearer
|
|
|
Shear // Eric Phone #: ###-####
|
BLD-Foundation | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PASS |
Phil Shearer
|
|
|
Ben Phone #: ###-#### column piers and plainter walls
|
BLD-Footing | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | FAIL |
Phil Shearer
|
|
|
We would like a late morning inspection Phone #: ###-#### Inspection requested via web by Ben Sears Need Engeener to aprove changes to the interior footing.
|
BLD-Foundation | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Phil Shearer
|
|
|
Early afternoon - Manny Phone #: ###-####
|
BLD-Footing | 2/3/2015 | 2/3/2015 | 2/3/2015 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
PubWorks Subgrade Approval | 1/27/2015 | 1/27/2015 | 1/27/2015 | | DONE |
Jason C. Taylor
|
|
|
*FOOTINGS ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Override - Parcel Holds | | | 1/12/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 1/9/2015 | | |
|
|
|
|
Plan assigned to (JG) | 12/12/2014 | 12/12/2014 | 1/9/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 12/31 W L2 Hillside**
|
Routing - PLAN CHECK | 12/26/2014 | | 1/9/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 1/9/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Override - Parcel Holds | | | 1/9/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/9/2015 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2015 | | DONE |
|
|
|
called Jeff- left message that permit is ready for pick up and remaining fees
|
1st review completed | | | 12/26/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | | | 12/26/2014 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicants
|
Routing - FIRE | 12/19/2014 | | 12/22/2014 | | PASS |
Scott Arellano
|
|
|
This building has been evaluated for Fire Department Vehicle Access. A letter from the HOA that affords continued access for the purpose of maintenaning defensible space provisions of the WUI code has been submitted and part of the application package.
|
Routing - Erosion and Sediment | 12/19/2014 | | 12/19/2014 | | PASS |
Evan Jenkins
|
|
|
WUI Zone A, Class A Roof, Permit for the construction of a new 3835 sq. ft., two story (first story 2805 sq. ft., second story 1030 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 653.5 sq. ft. of covered patio/porch and a 1123 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning.
|
Routing - MECHANICAL | | | 12/19/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/16/2014 | | 12/16/2014 | | PASS |
Leon Letson
|
|
|
Letter from Boulder Heights HOA for Defensible Space Requirements requred before Building Permit can be issued.
|
Routing - PUBLIC WORKS | 12/15/2014 | | 12/16/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | | | 12/15/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 12/12/2014 | | 12/15/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | | 12/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2014 11:01AM
|
Intake Approval | | | 12/12/2014 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/12/2014 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/12/2014 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/12/2014 | | DONE |
|
|
|
|
Intake Approval | | | 12/12/2014 | | PASS |
|
|
|
|