Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03581
StatusFinaled
Name TWO PLANK CONSTRUCTION
Site Address 274 N 8TH ST
Project NamePROST!
Customer NumberBLD14-03587
ePlanReviewYes
Description
(PROST!)(IDAHO BUILDING) Plan modificaion to replace store front windows 5/12/15 **ajs** Remodel changing occupancy from retail to a new restaurant tenant in an existing 790 sq. ft. tenant space per approved plans. Work to include 2 new ADA compliant restrooms a kitchen with associated mechanical equipment. The area under this space in the basement will be used for storage and a new walk in cooler will be installed. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/14/2015 DONE
Second Notice 6/20/20157/9/2015 DONE
Mailed 7-10-15
Telephone call  6/24/2015 DONE
Called and left a message asking for a updated address
First Notice 6/6/20156/10/2015 DONE
Mailed out 6-10-15
BLD-Final5/26/20155/27/20155/27/2015APASS
DetailsJim Storey
TJ Phone #: ###-####
Permanent Occupancy  5/27/2015 DONE
FIRE-Final Inspection5/26/20155/26/20155/26/2015PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference5/22/20155/22/20155/22/2015PDONE
DetailsForrest France
On site conference with tenant regarding fire extinguisher placement and life safety inspection items.
BLD-Final5/20/20155/21/20155/22/2015APEND
DetailsDave Hannah
T.J. Phone #: ###-####needs fire finals
Override - Parcel Holds  5/13/2015  
Permit Ready to Issue  5/13/2015 DONE
DetailsChristina Prado
NO NOT RE-ISSUE************
Need revised certificate of value for window replacement
CHANGE STATUS TO (ISS)  5/13/2015 DONE
(F) Reprint permit  5/13/2015 DONE
Plan assigned to (AJS)4/17/20154/17/20155/12/2015 PASS
DetailsAdele J Schaffeld-Griffin
needs zoning cert - back to applicant-plan mod, windows added
Routing - PLAN CHECK5/12/2015 5/12/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Design Review5/12/2015 5/12/2015 PASS
DetailsSarah Schafer
Approved per zoning certificate.
PLANS/APPL TAKEN TO FRONT DESK  5/12/2015 DONE
Routing - Design Review4/17/2015 4/24/2015 FAIL
DetailsSarah Schafer
needs zoning certificate
Routing - PLAN CHECK4/17/2015 4/20/2015 PASS
DetailsAdele J Schaffeld-Griffin
approved pending DR approval
Plan Modification Accepted  4/17/2015 DONE
per Jeff with ALC; started plan mod for changes to front windows
Plan Reviewer's activity  4/13/2015 DONE
DetailsAdele J Schaffeld-Griffin
Called Teejay Sales left message need revised plans and zoning approval for new store front windows.
BLD-Framing/Rough-in4/1/20154/1/20154/1/2015PPASS
DetailsDave Hannah
BLD-Final3/31/20154/1/20154/1/2015ACANC
DetailsDave Hannah
TJ Phone #: ###-####
BLD-Framing/Rough-in3/18/20153/19/20153/19/2015APASS
DetailsDave Hannah
TJ Phone #: ###-####
BLD-Conference3/6/20153/10/20153/10/2015APASS
DetailsDave Hannah
TJ Phone #: ###-####
BLD-Conference2/5/20152/6/20152/6/2015ADONE
DetailsDave Hannah
TJ-please call to meet Phone #: ###-####
Issue PAID IN FULL permit  1/23/2015 DONE
DetailsChristina Prado
Print Occupancy Form  1/23/2015 DONE
DetailsChristina Prado
Plan assigned to (AJS)12/15/201412/15/20141/15/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 3 TI - ePlanReview - Prost!
Routing Off Site - C.D.H1/5/2015 1/15/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  1/15/2015 DONE
Permit Ready to Issue  1/15/2015 DONE
DetailsChristina Prado
Routing - PLAN CHECK1/5/2015 1/5/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  1/2/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - C.D.H12/15/2014 1/2/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK12/15/2014 1/2/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE12/15/201412/15/201412/23/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Routing PW Environmental12/15/2014 12/22/2014 PASS
DetailsRick Christenson
Routing PW Solid Waste12/15/2014 12/22/2014 PASS
DetailsPeter J. McCullough
Routing - MECHANICAL12/15/2014 12/22/2014 PASS
DetailsTroy James
Routing - PLUMBING12/15/2014 12/16/2014 PASS
DetailsBill VanDegrift
Provide tempered water to hand wash sinks.
Routing PW Sewer Rating12/15/2014 12/16/2014 PASS
DetailsBeverly Mountain
Plan Reviewer's activity  12/15/2014 DONE
DetailsAdele J Schaffeld-Griffin
see attached email to tenant/contractor and architect regarding fire rated exterior wall and floor assembly.
Routing - Addressing12/15/2014 12/15/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS12/15/2014 12/15/2014 PASS
DetailsBeverly Mountain
Intake Approval  12/15/2014 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Pending Assignment by JCB12/15/2014 12/15/2014 DONE
DetailsJason Blais
Application received  12/12/2014 DONE
Application submitted via PDS Online on Dec 12 2014 11:46AM
Intake Approval  12/12/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Please see change marks on the check list.

Please contact ACHD for any additonal fees they may require for the change in use.