Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-03583
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 5925 W VANDAL WAY
Project NameBody Building . Com
Customer Number 
ePlanReviewYes
Description
(BODY BUILDING.COM – Break room addition) Permit to construct a 400 square foot break room in existing warehouse. This building was given occupancy under BLD07-01726. Scope of work includes: construction of interior non-bearing walls, new lighting, new millwork and interior finishes. Per: discussion w/ Bruce Chatterton, Jenifer Gilliland, and Teresa Sobotka we will consider easement outlined on ROS-5567 as public way due to Recorded Easement Documentation (100030011) and that documentation stating that the easement cannot be terminated unless ACHD agrees. Building area was determined by using Section 506.2 and the exception allowing W to by less than or equal to two. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/13/20153/10/2015 DONE
This permit finaled on the web by Brian McCoy
First Notice2/13/20152/13/20153/3/2015 DONE
DetailsMike Jordan
mailed 3-3-15
BLD-Final2/13/20152/13/20152/13/2015PPASS
DetailsMike Jordan
Please call 30 minutes prior to inspection Thanks Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy
DOC - Permit Finaled2/13/20152/13/20152/13/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection2/13/20152/13/20152/13/2015PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection2/9/20152/10/20152/10/2015APART
DetailsMike Jordan
Please call 30 minutes prior to inspection Thank You Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy. pending mech. rough in inspection.
BLD-Framing/Rough-in1/19/20151/20/20151/20/2015PPASS
DetailsMike Jordan
Please Call 30 minutes prior to inspection. Thanks Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy. Interior steel stud framed walls for break room and reception ok.
CHANGE STATUS TO (ISS)  12/29/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  12/29/2014 DONE
Issue PAID IN FULL permit  12/29/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  12/19/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (TLW)12/15/2014 12/19/2014 PASS
DetailsTim L. Woodard
Body Building.com TI
Routing - PLAN CHECK12/15/2014 12/19/2014 PASS
DetailsTim L. Woodard
Routing - PUBLIC WORKS12/15/2014 12/19/2014 PASS
DetailsTim L. Woodard
Approved in E-Plan. TLW
1st review completed  12/19/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/19/2014 DONE
Case Summary (BLD)  12/19/2014 DONE
Routing - Addressing12/15/2014 12/15/2014 PASS
DetailsEmily Dixon
Intake Approval  12/15/2014 PASS
DetailsAdele J Schaffeld-Griffin
Application received  12/12/2014 DONE
Application submitted via PDS Online on Dec 12 2014 2:20PM