Permit NumberBLD14-03615
StatusFinaled
Name PREMIER HAIR STUDIO
Site Address 10804 W FAIRVIEW AVE Unit: 101
Project NamePremier Hair Studio
Customer Number 
ePlanReviewNo
Description
(PREMIER HAIR STUDIO - FAIRVIEW BUSINESS PARK BLDG B - SPACE #101) This building does NOT have a fire sprinkler system. To remodel an existing 938 square foot tenant space within an existing 6,000 square foot multi-tenant building for a new beauty salon. An interior nonbearing wall will be removed under this permit. Hair washing sinks will be installed in conjunction with this permit. The existing suspended acoustical ceiling, light fixtures, and accessible restroom will be maintained. The restroom is required to be maintained accessible to the disabled and available to the public. The drinking fountain was allowed to be removed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/22/2015 DONE
Print Statement  6/19/2015 DONE
Print Statement  5/26/2015 DONE
Print Statement  5/26/2015 DONE
First Notice 2/13/20153/3/2015 DONE
mailed 3-3-15
Permanent Occupancy  2/3/2015 DONE
CHANGE STATUS TO (FNL)  2/3/2015 DONE
DetailsKristal Soland
BLD-Final2/2/20152/2/20152/2/2015PPASS
DetailsJim Sly
Ryan Phone #: ###-####
OK for perm Occ.
FIRE-Final Inspection2/2/20152/2/20152/2/2015PPASS
DetailsForrest France
Life safety inspection completed satisfactory. The posted PFE was certified while on site.
Issue PAID IN FULL permit  1/8/2015 DONE
Permit Ready to Issue  1/5/2015 DONE
DetailsKristal Soland
Plan assigned to (CJW)12/17/2014 1/5/2015 PASS
DetailsCarl Westfall
PREMIER HAIR STUDIO - Level 3 TI - Paper - (10 days - Dec 31)
Routing - FIRE12/30/2014 1/5/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - PLAN CHECK1/5/2015 1/5/2015 DONE
DetailsCarl Westfall
Inserted new sheets and sent back to Mechanical
1st review completed  1/5/2015 FAIL
Failed Mechanical.
Routing - MECHANICAL1/5/2015 1/5/2015 PASS
DetailsTroy James
Routing - PLAN CHECK1/5/2015 1/5/2015 DONE
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  1/5/2015 DONE
Print Occupancy Form  1/5/2015 DONE
DetailsCandy A. Nichols
Routing - PLAN CHECK12/24/2014 12/30/2014 PASS
DetailsCarl Westfall
Drawings approved with redlines. Could not figure out the email address or the phone number. Could not contact the applicant.
Plan resubmittals received  12/30/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked M0 & M2; Plans stamped and taken to Tim Woodard for further review
Routing - MECHANICAL12/22/2014 12/24/2014 FAIL
DetailsTroy James
emailed correction to applicant
Routing - PLUMBING12/19/2014 12/22/2014 PASS
DetailsBill VanDegrift
additional cross connection protection may be required at the sinks, addition will not overload the existing system.
Routing - Addressing12/18/2014 12/19/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS12/19/2014 12/19/2014 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating12/19/2014 12/19/2014 PASS
DetailsConnie Baumgartner
Intake Approval  12/17/2014 PASS
Plans ACCEPTED BY PLAN TECH  12/17/2014 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/17/2014 DONE
DetailsChristina Prado
Pending Assignment by JCB12/17/2014 12/17/2014 DONE
DetailsJason Blais
Application received 12/17/2014