BLD-Final | 7/20/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Tony Young
|
|
|
Johnny Phone #: ###-####
|
BLD-Blower Door Test Results | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Tony Young
|
|
|
Johnny Phone #: ###-####/// 3.45
|
DOC - Permit Finaled | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 7/20/2015 | 7/20/2015 | 7/20/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Wall Bracing | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | PASS |
Tony Young
|
|
|
Please call with results - John Phone #: ###-####,, interior ok
|
BLD-Energy code compliance | 5/5/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Phil Shearer
|
|
|
Johnny Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Phil Shearer
|
|
|
Johnny Phone #: ###-####
|
BLD-Framing/Rough-in | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | CANC |
Tony Young
|
|
|
Johnny Phone #: ###-####
|
BLD-Energy code compliance | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | CANC |
Tony Young
|
|
|
Johnny Phone #: ###-####-pleae call with results
|
BLD-Framing/Rough-in | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PART |
Phil Shearer
|
|
|
*Fire rated soffits* would like call after inspection; Johnny Phone #: ###-####. Soffits OK Missing some of the truss bracing contractor need to check all of the bracing. OK to insulate
|
BLD-Wall Bracing | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PART |
Tony Young
|
|
|
call after inspection; Johnny Phone #: ###-####,, exterior ok after nailing sill plate w/ galv nails
|
BLD-Foundation | 2/27/2015 | 3/2/2015 | 3/2/2015 | A | PASS |
Tony Young
|
|
|
Mana Phone #: ###-####,, late am
|
BLD-Footing | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PART |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 2/25/2015 | 2/26/2015 | 2/26/2015 | P | NR |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 2/25/2015 | 2/26/2015 | 2/26/2015 | P | NR |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | NR |
Tony Young
|
|
|
Mana Phone #: ###-####
|
PubWorks Subgrade Approval | 2/24/2015 | 2/24/2015 | 2/24/2015 | | DONE |
Jason C. Taylor
|
|
|
* Entire Footing, Retaining Wall, & Columns**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 1/28/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 1/27/2015 | | |
|
|
|
|
Plan assigned to (JG) | 1/12/2015 | 1/12/2015 | 1/27/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 1/28 W L2 Hillside ePlan*
|
Routing PW Grading-Hillside | 1/26/2015 | | 1/27/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/27/2015 | | DONE |
|
|
|
|
1st review completed | | | 1/26/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/26/2015 | | 1/26/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/12/2015 | | 1/26/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 1/12/2015 | 1/12/2015 | 1/14/2015 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing PW Grading-Hillside | | | 1/13/2015 | | FAIL |
|
|
|
Grading plan and geotechncial report do not match. Need plans or geotech modified to meet setbacks. Jason Taylor ###-####.
|
Routing - MECHANICAL | 1/13/2015 | | 1/13/2015 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 1/12/2015 | | 1/13/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 1/12/2015 | | 1/12/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
WUI Zone A, Class A Roof, Permit for the construction of a new 2586 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 254 sq. ft. of covered patio/porch and a 1016 sq. ft. attached garage per the approved plans, plan review report and any notations.
|
Routing - MECHANICAL | 1/12/2015 | | 1/12/2015 | | FAIL |
Troy James
|
|
|
emailed correction to idaho hvac
|
Routing - PLANNING | 1/12/2015 | | 1/12/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 1/12/2015 | | 1/12/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 1/12/2015 | | PASS |
|
|
|
|
Intake Approval | | | 12/30/2014 | | FAIL |
Candy A. Nichols
|
|
|
need A sheets including floor plans, ele. plans, mech, geotech report, manual j, res check-see notes in eplan for more
|
Application received | | | 12/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 17 2014 4:03PM
|