BLD-Final | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | DONE |
Tony Young
|
|
|
trent
|
DOC - Permit Finaled | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/10/2017 | 8/11/2017 | 8/11/2017 | A | PART |
Tony Young
|
|
|
Trent Phone #: ###-####,, conf on final.. need handrails and plumbing
|
Zoning Approval | 7/31/2017 | 7/31/2017 | 7/31/2017 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Aging Inspection | 4/12/2017 | 4/12/2017 | 4/13/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/11/2017 | 4/11/2017 | 4/12/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PASS |
Tony Young
|
|
|
Trent Phone #: ###-####
|
BLD-Framing/Rough-in | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PART |
Tony Young
|
|
|
Trent Phone #: ###-####,, ok to insulate,, verify fireblocking,, support floor joists
|
BLD-Conference | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Tony Young
|
|
|
Trent Phone #: ###-####,, frame conf
|
BLD-Framing/Rough-in | 11/10/2016 | 11/14/2016 | 11/14/2016 | P | FAIL |
Jim Sly
|
|
|
Trent Phone #: ###-#### Fireblocking.....Over-notching.....knee walls adjacent to attic space only 2x4 ....and no encapsulating 6 sides........Recommended a conferance on site. fireblocking in basement.....to many to list.
|
BLD-Aging Inspection | 8/26/2016 | 8/26/2016 | 8/26/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/25/2016 | 8/25/2016 | 8/26/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/7/2016 | 4/7/2016 | 4/13/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/6/2016 | 4/6/2016 | 4/13/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Footing | 11/19/2015 | 11/24/2015 | 11/24/2015 | A | PART |
Tony Young
|
|
|
Trent Phone #: ###-####
|
BLD-Footing | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PART |
Tony Young
|
|
|
Trent Phone #: ###-####,, basement footings ok,, need point loads added on north and south footings
|
Inspection Record Card- Bld | | | 10/26/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/26/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/23/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 9/24/2015 | 9/24/2015 | 10/23/2015 | | DONE |
Brian McGowan
|
|
|
walk in. First Review Completed, Failed. Additional drawings requested. Needs to go thru Design Review again. 9-28-15
|
Routing - PLAN CHECK | 9/28/2015 | | 10/23/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/23/2015 | | 10/23/2015 | | PASS |
Javier Guzman
|
|
|
Brian M. did plan review
|
Inspection Record Card- Bld | | | 10/23/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/23/2015 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Plan resubmittals received | | | 10/21/2015 | | DONE |
|
|
|
received (2) sets of wall section plans
|
Routing Walk-In (Zoning) | 10/15/2015 | 10/15/2015 | 10/16/2015 | A | DONE |
Kristal Soland
|
|
|
resubmittals
|
Plan resubmittals received | | | 10/9/2015 | | DONE |
|
|
|
received (2) sets of plans
|
1st review completed | | | 9/30/2015 | | FAIL |
Brian McGowan
|
|
|
Plans need to go thru Design Review. Additional drawings have been requested. 9-28-15
|
Routing - MECHANICAL | 9/29/2015 | | 9/29/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 9/28/2015 | | 9/28/2015 | | FAIL |
Troy James
|
|
|
emailed rubin with corrections
|
Routing Walk-In (Zoning) | 9/24/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
David Moser
|
|
|
modifications to plans- doing some additions
|
BLD-Energy code compliance | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Tony Young
|
|
|
Trent Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Tony Young
|
|
|
Trent Phone #: ###-####,, correction notice on plans,, ok to insulate
|
BLD-Footing | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | PART |
Tony Young
|
|
|
Trent-pour time 1:00 so would like insp late AM Phone #: ###-####,,, work in progress
|
BLD-Foundation | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | PART |
Tony Young
|
|
|
Trent-pour time 1:00 so would like insp late AM Phone #: ###-####,, work in progress
|
BLD-Conference | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PART |
Tony Young
|
|
|
Trent Phone #: ###-####,, set back ?s
|
OVERRIDE | | | 12/19/2014 | | |
|
|
|
|
Routing Walk-In (Zoning) | 12/19/2014 | 12/19/2014 | 12/19/2014 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 12/19/2014 | 12/19/2014 | 12/19/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 12/19/2014 | 12/19/2014 | 12/19/2014 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 12/19/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 12/19/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/19/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 12/19/2014 | | | |
|
|
|
|