BLD-Final | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Phil Shearer
|
|
|
Home will be open Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
|
DOC - Permit Finaled | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 6/17/2015 | 6/18/2015 | 6/18/2015 | A | PASS |
Dave Hannah
|
|
|
Corrections will be made today. Call Tim if any issues.
Thank you. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
|
BLD-Framing/Rough-in | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PART |
Dave Hannah
|
|
|
Call tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin c/n on site ok to insulate
|
BLD-Wall Bracing | 6/3/2015 | 6/3/2015 | 6/4/2015 | P | PART |
Dave Hannah
|
|
|
ok to cover ext but slill needs hold downs installed on inside
|
BLD-Conference | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Dave Hannah
|
|
|
Call Lucas if any problems. Lucas will be onsite.
Thank you much. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
|
CHANGE STATUS TO (ISS) | | | 6/2/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/1/2015 | 6/1/2015 | 6/1/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 6/1/2015 | | 6/1/2015 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2015 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/1/2015 | | DONE |
Tisha Gallop
|
|
|
modification for engineered placement of hold-downs. The original hold-downs were missed at foundation stage out on site and this is to correct that.
|
BLD-Wall Bracing | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | NR |
Jim Storey
|
|
|
Shear only. Framers are on site. Call if any problems
Thanks much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin not built per aproved pan or engineering.
|
BLD-Wall Bracing | 5/20/2015 | 5/20/2015 | 5/21/2015 | P | FAIL |
Dave Hannah
|
|
|
Re inspection for shear panels. Framing crew and siding crew are on site
Thank you much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
|
BLD-Wall Bracing | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | FAIL |
Phil Shearer
|
|
|
plans are hanging inside the closet near the front door. Call Tim if any problems. Thank you much Phone #: ###-#### Inspection requested via web by Timothy Beaudoin. Missing hold downns, Shear nailing wrong CN posted
|
Plan Modification Accepted | | | 5/12/2015 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 5/12/2015 | | 5/12/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Wall Bracing | 5/8/2015 | 5/8/2015 | 5/8/2015 | A | FAIL |
Dave Hannah
|
|
|
Shear inspection. gate code is 1201
Call Tim if any issues. Thank you. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin no plans on site
|
BLD-Foundation | 4/8/2015 | 4/8/2015 | 4/9/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 6971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/6/2015 | 4/6/2015 | 4/7/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Telephone call | | | 3/31/2015 | | DONE |
|
|
|
called Catherine to let her know that Javier made the corrections requested for modification and that I batched stamped them and the three drawings are in the approved folder in eplan// KRS
|
BLD-Foundation | 2/8/2015 | 2/9/2015 | 2/10/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 1/28/2015 | 1/29/2015 | 1/30/2015 | A | CANC |
Dave Hannah
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 1/30/2015 | 1/30/2015 | 1/30/2015 | A | PASS |
Dave Hannah
|
|
|
Heron Phone #: ###-#### basement ftgs
|
Issue PAID IN FULL permit | | | 1/26/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2015 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 1/13/2015 | | |
|
|
|
|
Plan assigned to (JG) | 1/6/2015 | 1/6/2015 | 1/13/2015 | | PASS |
Javier Guzman
|
|
|
1/16 F L1 ePlan**
|
Routing - PLAN CHECK | 1/6/2015 | | 1/13/2015 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/13/2015 | | DONE |
|
|
|
|
1st review completed | | | 1/13/2015 | | DONE |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/6/2015 | | PASS |
|
|
|
|
Routing - MECHANICAL | 1/6/2015 | | 1/6/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/6/2015 | | 1/6/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 1/6/2015 | | 1/6/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 1/6/2015 | | 1/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | | 12/22/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2014 8:59AM
|
Intake Approval | | | 12/22/2014 | | FAIL |
Candy A. Nichols
|
|
|
need manual j's, res check, revised sheet needs to be stamped by engineer and can not be done in red (you can do in black or blue), also need set backs
|