Permit Information
Permit NumberBLD14-03666
StatusFinaled
Name CITY OF BOISE (BOISE PARKS & RECRE
Site Address 355 W JULIA DAVIS DR
Project NameZoo Boise-Administration Trail
Customer Number 
ePlanReviewYes
Description
(ZOO BOISE – Administration Trailer) To install a 1,440 square foot, one story modular office building and related site improvements. This modular will be located with a finished floor level at 30 inches. There will be an accessible metal ramp installed to the entry door. A compliant stair and landings are required at the south door. The Idaho State Tag Number must be verified by inspection prior to issuance of a Certificate of Occupancy. All construction per the approved plans. **TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/20/20157/9/2015 DONE
Mailed 7-10-15
Print Statement  6/23/2015 DONE
Print Statement  6/23/2015 DONE
First Notice 5/3/20156/10/2015 DONE
Mailed out 6-10-15
Permanent Occupancy  4/23/2015 DONE
BLD-Final4/16/20154/17/20154/17/2015APASS
DetailsDave Hannah
Craig Phone #: ###-####
BLD-Final3/27/20153/30/20153/30/2015PPEND
DetailsDave Hannah
Craig Phone #: ###-#### ok for temp occ needs to drop brake room sink change door hardwear one office and post restroom sign
FIRE-Final Inspection3/27/20153/30/20153/30/2015APASS
DetailsForrest France
Noted correction items finished. Life safety passed. Signature card not available on site.
FIRE-Final Inspection3/25/20153/27/20153/27/2015APART
DetailsForrest France
Final pending door hardware and posting of one fire extinguisher per plan. Remainder okayed.
PubWorks Occupancy Approval3/27/20153/27/20153/27/2015 DONE
DetailsTiffany Lowery
BLD-Conference2/27/20153/2/20153/2/2015APASS
DetailsDave Hannah
Craig Phone #: ###-####
BLD-Footing2/25/20152/25/20152/26/2015PPASS
DetailsDave Hannah
Craig// please call for access Phone #: ###-#### this was for the hold downs and blocking under the new office moble office bldg
Issue PAID IN FULL permit  2/25/2015 DONE
Print Occupancy Form  2/25/2015 DONE
Route to Impact Fee Review2/9/20152/12/20152/24/2015 PASS
DetailsCindy M. Gould
OVERRIDE  2/19/2015  
Permit Ready to Issue  2/19/2015 DONE
DetailsChristina Prado
Need RP, GC & Revised Cert of Value prior to fee calculation and issuance
Routing - FIRE2/9/20152/9/20152/18/2015 PASS
DetailsScott Arellano
Attached fire review comments to plans.
PLANS/APPL TAKEN TO FRONT DESK  2/18/2015 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK2/9/2015 2/18/2015 PASS
DetailsTim L. Woodard
Plan assigned to (TLW)1/2/2015 2/18/2015 PASS
DetailsTim L. Woodard
1st Review Complete - New Modular - ePlanReview - Zoo Boise
Routing PW Flood Plain1/2/2015 2/9/2015 PASS
DetailsJim Wyllie
Approved in E-Plan. TLW
Routing PW Solid Waste1/2/2015 2/9/2015 PASS
DetailsPeter J. McCullough
Approved in E-Plan. TLW
Routing PW Sewer Design2/9/2015 2/9/2015 PASS
DetailsKyle S. Rosenmeyer
Plan resubmittals received  2/9/2015 DONE
1st review completed  1/28/2015 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK1/2/2015 1/27/2015 FAIL
DetailsTim L. Woodard
Routing - FIRE1/2/20151/2/20151/13/2015 FAIL
DetailsScott Arellano
Attached comments to plans. Emailed report to architect.
Routing PW Drainage1/2/2015 1/12/2015 PASS
DetailsBrian Murphy
Routing PW Sewer Rating1/2/2015 1/6/2015 PASS
DetailsJennifer Bruner
Routing - PLUMBING1/2/2015 1/5/2015 PASS
DetailsBill VanDegrift
Routing - Erosion and Sediment1/2/2015 1/5/2015 PASS
DetailsEvan Jenkins
SITE PREP INSPECTION REQUIRED
(ZOO BOISE)(ADMINISTRATION TRAIL MODULAR BLDG) New modular building installation for office space that includes a restroom and kitchenette.
Intake Approval  1/2/2015 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Pending Assignment by JCB1/2/2015 1/2/2015 DONE
DetailsJason Blais
Routing - Addressing1/2/2015 1/2/2015 PASS
DetailsJennifer Bruner
Approved in E-Plan. TLW
Routing - PUBLIC WORKS1/2/2015 1/2/2015 PASS
DetailsJennifer Bruner
Routing PW Street Lights1/2/2015 1/2/2015 PASS
DetailsMike D Hedge
No street lighting required.
Routing PW Sewer Design1/2/2015 1/2/2015 FAIL
DetailsKyle S. Rosenmeyer
The connection to the existing 8" sewer main line is to be an 8" x2" PVC Tee. Label existing manhole 81F3. Contractor to CCTV sewer mainline between manholes 81F3 and 81F2 after installation of the service line. Contact Boise Public Works 48 hours to tapping new service to obtain a tap permit.

Routing - PLANNING Land Div1/2/2015 1/2/2015 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Application received  12/22/2014 DONE
Application submitted via PDS Online on Dec 22 2014 2:57PM