Second Notice | | 6/20/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
Print Statement | | | 6/23/2015 | | DONE |
|
|
|
|
Print Statement | | | 6/23/2015 | | DONE |
|
|
|
|
First Notice | | 5/3/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Permanent Occupancy | | | 4/23/2015 | | DONE |
|
|
|
|
BLD-Final | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Dave Hannah
|
|
|
Craig Phone #: ###-####
|
BLD-Final | 3/27/2015 | 3/30/2015 | 3/30/2015 | P | PEND |
Dave Hannah
|
|
|
Craig Phone #: ###-#### ok for temp occ needs to drop brake room sink change door hardwear one office and post restroom sign
|
FIRE-Final Inspection | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PASS |
Forrest France
|
|
|
Noted correction items finished. Life safety passed. Signature card not available on site.
|
FIRE-Final Inspection | 3/25/2015 | 3/27/2015 | 3/27/2015 | A | PART |
Forrest France
|
|
|
Final pending door hardware and posting of one fire extinguisher per plan. Remainder okayed.
|
PubWorks Occupancy Approval | 3/27/2015 | 3/27/2015 | 3/27/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 2/27/2015 | 3/2/2015 | 3/2/2015 | A | PASS |
Dave Hannah
|
|
|
Craig Phone #: ###-####
|
BLD-Footing | 2/25/2015 | 2/25/2015 | 2/26/2015 | P | PASS |
Dave Hannah
|
|
|
Craig// please call for access Phone #: ###-#### this was for the hold downs and blocking under the new office moble office bldg
|
Issue PAID IN FULL permit | | | 2/25/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/25/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/9/2015 | 2/12/2015 | 2/24/2015 | | PASS |
Cindy M. Gould
|
|
|
|
OVERRIDE | | | 2/19/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 2/19/2015 | | DONE |
Christina Prado
|
|
|
Need RP, GC & Revised Cert of Value prior to fee calculation and issuance
|
Routing - FIRE | 2/9/2015 | 2/9/2015 | 2/18/2015 | | PASS |
Scott Arellano
|
|
|
Attached fire review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/9/2015 | | 2/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 1/2/2015 | | 2/18/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete - New Modular - ePlanReview - Zoo Boise
|
Routing PW Flood Plain | 1/2/2015 | | 2/9/2015 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan. TLW
|
Routing PW Solid Waste | 1/2/2015 | | 2/9/2015 | | PASS |
Peter J. McCullough
|
|
|
Approved in E-Plan. TLW
|
Routing PW Sewer Design | 2/9/2015 | | 2/9/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Plan resubmittals received | | | 2/9/2015 | | DONE |
|
|
|
|
1st review completed | | | 1/28/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/2/2015 | | 1/27/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 1/2/2015 | 1/2/2015 | 1/13/2015 | | FAIL |
Scott Arellano
|
|
|
Attached comments to plans. Emailed report to architect.
|
Routing PW Drainage | 1/2/2015 | | 1/12/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 1/2/2015 | | 1/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLUMBING | 1/2/2015 | | 1/5/2015 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - Erosion and Sediment | 1/2/2015 | | 1/5/2015 | | PASS |
Evan Jenkins
|
|
|
SITE PREP INSPECTION REQUIRED
(ZOO BOISE)(ADMINISTRATION TRAIL MODULAR BLDG) New modular building installation for office space that includes a restroom and kitchenette.
|
Intake Approval | | | 1/2/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 1/2/2015 | | 1/2/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 1/2/2015 | | 1/2/2015 | | PASS |
Jennifer Bruner
|
|
|
Approved in E-Plan. TLW
|
Routing - PUBLIC WORKS | 1/2/2015 | | 1/2/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Street Lights | 1/2/2015 | | 1/2/2015 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing PW Sewer Design | 1/2/2015 | | 1/2/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
The connection to the existing 8" sewer main line is to be an 8" x2" PVC Tee. Label existing manhole 81F3. Contractor to CCTV sewer mainline between manholes 81F3 and 81F2 after installation of the service line. Contact Boise Public Works 48 hours to tapping new service to obtain a tap permit.
|
Routing - PLANNING Land Div | 1/2/2015 | | 1/2/2015 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Application received | | | 12/22/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2014 2:57PM
|