Third Notice | | 12/15/2015 | 1/4/2016 | | DONE |
Christina Prado
|
|
|
Completed 1-4-16
|
Print Statement | | | 1/4/2016 | | DONE |
Christina Prado
|
|
|
|
Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
|
Third Notice | | 10/17/2015 | 11/9/2015 | | DONE |
|
|
|
|
Second Notice | | 9/25/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
First Notice | 9/11/2015 | 9/11/2015 | 9/15/2015 | | DONE |
Phil Shearer
|
|
|
Mailed 9/16/15
|
BLD-Final | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Phil Shearer
|
|
|
Call 1st Jeff seismic components and -engineering approval.......###-####. Tony youg has reseved all documentation needed.
|
DOC - Permit Finaled | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Phil Shearer
|
|
|
|
FIRE-Final Inspection | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete per this building permit/scope of work.
|
BLD-Other | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PEND |
Tony Young
|
|
|
Call 1st Jeff seismic components and -engineering approval.......###-####,, call into J. Wylie, about flood plain cert,, not sure if its for this permit or not?,, all seismic up grades done,, still needs f/l/s ?
|
BLD-Other | 9/8/2015 | 9/9/2015 | 9/9/2015 | P | PEND |
Jim Sly
|
|
|
Jeff/// seismic inspection Phone #: ###-#### Re-sched.............
|
BLD-Other | 9/9/2015 | 9/10/2015 | 9/9/2015 | A | CANC |
Jim Sly
|
|
|
Call jeff 1st ......seismic Components and engineering approval. ###-####
|
BLD-Other | 8/26/2015 | 8/27/2015 | 8/28/2015 | P | PEND |
Dave Hannah
|
|
|
Jeff---epoxy bolt inspection Phone #: ###-#### needs spec inspection
|
OVERRIDE | | | 3/11/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/11/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 3/11/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 3/11/2015 | | DONE |
Christina Prado
|
|
|
|
Routing Off Site - STRUCTURAL | 2/12/2015 | | 3/10/2015 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2015 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (TLW) | 1/6/2015 | | 3/10/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete - Level 3 TI - ePlanReview - Armory Seismic Upgrade
|
Routing - PLAN CHECK | 2/12/2015 | | 3/6/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved contingent on outsource review. TLW
|
Plan resubmittals received | | | 2/12/2015 | | DONE |
|
|
|
|
1st review completed | | | 1/23/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/6/2015 | | 1/23/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 1/6/2015 | | 1/22/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 1/6/2015 | | 1/6/2015 | | PASS |
Evan Jenkins
|
|
|
(RESERVE STREET ARMORY) Seismic Upgrade of the existing concrete and timber structure to allow for new future tenants of any type to occupy with a use of up to a Assembly type. (Increased Importance factor used for seismic forces) Work to include...seismic upgrade which will include sum concrete interior foundations. Contractor shall abide by existing SWPPP onsite under ESC14-00696
|
Pending Assignment by JCB | 1/6/2015 | | 1/6/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/5/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Intake Approval | | | 12/24/2014 | | FAIL |
John Menard
|
|
|
It does not appear that this project was submitted as required.
Please review the ePlanReview Submittal Standards on the PDS web site. See link below.
http://pds.cityofboise.org/pds-online/e-services/eplanreview/
Please include a completed Major Tenant Improvement Check List along
with all applicable items required by that checklist.
|
Application received | | | 12/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 23 2014 4:04PM
|