Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03688
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1099 W FRONT ST
Project NameSimplot Office Building
Customer Number 
ePlanReviewYes
Description
SIMPLOT OFFICE Tenant Improvement - This permit is to finish a new 306,345 square foot, nine story office building for occupancy. **Plan Modification 5/14/18 screens added to meet DR requirements, approved by engineer and DR**ajs****PLAN MODIFICATION 3-30-16 - Modification submitted to change the build out of the Lab space on the 5th floor. TLW** The first floor will have a large lobby area, customer experience area and office and training areas. There will be a wellness center at the south end of the main building. Separate tenant improvement permits will be required to finish the future coffee shop, incubator space and future restaurant at the first floor of the annex. The second floor of the main building will be office space. The second floor of the annex will have a large lobby, a multipurpose assembly room and an auditorium. The third floor of the main building will be office space. The fourth floor of the main building will be office space. The fourth floor of the annex is a restaurant with a full kitchen and large exterior patio seating area. The fifth floor of the main building will be office space. The fifth floor of the annex has a kitchen, office areas and a greenhouse. The greenhouse structure is deferred and has not been reviewed or approved. The sixth floor will be office space with an exterior deck at the south end of the floor. The seventh floor will be office space with a large conference room, a kitchen and exterior decks at the east and west ends of the floor. The eighth floor will be office space. The ninth floor will be office space. The core areas were completed under the shell and core permit BLD14-02173. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/7/2019 DONE
Third Notice 11/11/201812/13/2018 DONE
mailed 12-14
Second Notice 10/21/201811/6/2018 DONE
mailed 11-12
First Notice 9/15/201810/11/2018 DONE
mailed 10-12-18
Permanent Occupancy  9/5/2018 DONE
BLD-Final8/31/20189/4/20189/4/2018PPASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection8/31/20189/4/20189/4/2018APASS
DetailsJim Page
Final life fire safety inspection complete.

Victoria Phone #: ###-####
Zoning Approval8/15/20188/15/20188/15/2018 DONE
DetailsAndrea Tuning
BLD-Aging Inspection7/25/20187/25/20187/30/2018 PASS
DetailsDave Hannah
Temporary Occupancy7/10/201810/8/20187/10/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 90 day extension from 7-8-18
Telephone call  7/6/2018 DONE
emailed Victoria that the temp c of o was about to expire so she can email Jason B if they're not ready for a perm c of o yet
BLD-Aging Inspection5/25/20185/25/20185/30/2018 PEND
DetailsDave Hannah
Plan assigned to (AJS)4/9/20184/9/20185/22/2018 DONE
DetailsAdele J Schaffeld-Griffin
Plan Mod - Add mechanical screen wall
OVERRIDE  5/15/2018  
Temporary Occupancy5/15/20188/13/20185/15/2018 DONE
DetailsCandy A. Nichols
deferred submittals plan review complete-issued and changed back to Temp C of O status
Print Occupancy Form  5/15/2018 DONE
CHANGE STATUS TO (ISS)  5/15/2018 DONE
Routing Off Site - STRUCTURAL5/9/2018 5/15/2018 PASS
DetailsAdele J Schaffeld-Griffin
Permit Ready to Issue  5/15/2018 DONE
no fees due for the deferred submittals
Routing - PLAN CHECK5/9/2018 5/15/2018 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Design Review5/9/2018 5/11/2018 PASS
DetailsSarah Schafer
Routing - PLAN CHECK4/12/2018 5/9/2018 FAIL
DetailsAdele J Schaffeld-Griffin
pending structural, DR
Routing Off Site - STRUCTURAL4/25/2018 4/25/2018 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK4/25/2018 4/25/2018 FAIL
DetailsAdele J Schaffeld-Griffin
need DR and structural approval
Routing - Design Review4/12/2018 4/23/2018 FAIL
DetailsSarah Schafer
Show the details of the mechanical screens and the two locations where the mechanical screens will need to be installed.
Temporary Occupancy4/11/20187/10/20184/11/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd an extension request for the temp C of O
CHANGE STATUS TO (REV)  4/11/2018 DONE
had to change status to TMP to extend the expiration date-then had to change status back to REV for the plan mod
Telephone call  4/11/2018 DONE
called Victory again to let know that the temp c of o is now expired and that we need toleft message on her phone-also called Josh Durham and Mark Bowned - left a message on both phones
Plan Modification Accepted  4/9/2018 DONE
DetailsChristina Prado
Plan Mod - Install additionsl mechanical screening to match existing
Telephone call  4/6/2018 DONE
emailed Victoria that the Temp C of O was about to expire
DOC - Permit Expired3/16/20183/16/20183/16/2018ACANC
DetailsDave Hannah
BLD-Aging Inspection3/12/20183/12/20183/16/2018 PEND
DetailsDave Hannah
Temporary Occupancy1/17/20184/17/20181/17/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd temp c of o extension good for 90 days starting from 1/9/18
BLD-Final1/8/20181/9/20181/9/2018ANR
DetailsDave Hannah
Victoria Phone #: ###-####
Telephone call  1/3/2018 DONE
emailed Victoria that the temp c of o will expire on 1/15/18
BLD-Aging Inspection11/8/201711/8/201711/15/2017 PEND
DetailsDave Hannah
needs air seal and mec connection at stairs in garage
Temporary Occupancy10/17/20171/15/201810/17/2017 DONE
DetailsCandy A. Nichols
Jason B ok'd extension starting from 10/11/17
Telephone call  10/11/2017 DONE
called Victoria-she will email Jason B to requet an extension for the temp c of o
BLD-Aging Inspection8/28/20178/28/20178/29/2017 PEND
DetailsDave Hannah
Temporary Occupancy8/29/201711/27/20178/29/2017 DONE
DetailsCandy A. Nichols
Jason Blais ok'd temp c of o extension-i put the expiration date good thru BND date 10/11/17
Telephone call  8/22/2017 DONE
called Virginia to let know temp c of o is expired-she will look into it and either call in the final or request another extension
Temporary Occupancy6/30/20179/28/20176/30/2017 DONE
DetailsCandy A. Nichols
Temporary Occupancy6/30/20179/28/20176/30/2017 DONE
DetailsCandy A. Nichols
Temporary Occupancy6/30/20179/28/20176/30/2017 DONE
DetailsCandy A. Nichols
Temporary Occupancy6/30/20179/28/20176/30/2017 DONE
DetailsChristina Prado
FIRE-Final Inspection6/28/20176/28/20176/28/2017PPART
DetailsJim Page
Life fire safety inspection complete for SWHQ main building (to include level 5 lab area and fire command), baffles will be fabricated to prevent cold solder in the tasting room on level 5 of annex building. FIR15-00641 is attached to this projec in project related cases, this FIR permit will remain in issued status until courtyard area is complete. Fire panel for SWHQ builing is showing a ground fault, issue will need to be resolved before final life fire safety inspection for courtyard area. After mentioned items have passed inspection then life fire safety can be finalized.
BLD-Aging Inspection6/16/20176/16/20176/20/2017 PEND
DetailsDave Hannah
Temporary Occupancy4/11/20177/10/20174/11/2017 DONE
DetailsCandy A. Nichols
as per Jason B-request for extension granted from 4/5/17 for 90 days
Temporary Occupancy4/11/20177/10/20174/11/2017 DONE
DetailsCandy A. Nichols
Jason B ok'd an extension from May 4th not April 5th so had to redo temp c of o
BLD-Aging Inspection3/27/20173/27/20173/28/2017 PEND
DetailsDave Hannah
Temporary Occupancy2/3/20175/4/20172/3/2017 DONE
DetailsCandy A. Nichols
as per Angie for the temp c of o
BLD-Final1/23/20171/27/20171/27/2017APART
DetailsDave Hannah
Requesting TCO on office building levels 1-9. Phone #: ###-#### Inspection requested via web by Joe Borelli ok for temp occ
FIRE-Final Inspection1/24/20171/26/20171/26/2017PPART
DetailsJim Page
Egress lighting inspection complete for area's that sustained water damage.
FIRE-Final Inspection1/23/20171/24/20171/24/2017ACANC
DetailsJim Page
Egress/emergency lighting to be tested on 26JAN2017, this inspection request cancelled due to Simplot functions/personel that did not want to be interupted.
BLD-Final1/21/20171/25/20171/23/2017PCANC
DetailsDave Hannah
Requesting TCO update for office building levels 1-9. Phone #: ###-#### >> Inspection requested via web by Joe Borelli Inspection cancelled from web by: Joe Borelli
CHANGE STATUS TO (ISS)  1/18/2017 DONE
as per Angie-temp c of o but changed back to iss so could call in inspections
BLD-Final1/12/20171/13/20171/13/2017ANR
DetailsDave Hannah
Requesting TCO for Office Building Level 1 West Phone #: ###-#### Inspection requested via web by Joe Borelli
Print Occupancy Form  1/13/2017 DONE
Print Occupancy Form  1/9/2017 DONE
BLD-Final11/21/201611/22/201611/22/2016PPART
DetailsDave Hannah
Requesting TCO on levels 1-4 of Annex Phone #: ###-#### Inspection requested via web by Joe Borelli ok for temp occ
FIRE-Final Inspection11/21/201611/22/201611/22/2016PPART
DetailsJim Page
Fire sprinkler inspections are complete for annex levels 1 through 4, fire alarm inspections are complete for annex levels 1 through 4, fire extinguishers are in place with current inspection tags for annex levels 1 through 4, commercial hood suppression system inspections for annex level 4 kitchen are complete, exit/emergency egress lighting inspected for annex levels 1 through 4 complete. Partial life fire safety inspection for TCO complete for levels 1 through 4 of annex building.
BLD-Final11/21/201611/21/201611/22/2016ACANC
DetailsDave Hannah
Requesting TCO for levels 1-4 of Annex building Phone #: ###-#### Inspection requested via web by Joe Borelli
Extend Permit 90/180 days11/19/201611/21/201611/21/2016ACANC
DetailsDave Hannah
Requesting TCO for levels 1-4 of Annex building Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Final11/17/201611/18/201611/21/2016PCANC
DetailsDave Hannah
Requesting TCO for levels 1-4 of Annex building Phone #: ###-#### Inspection requested via web by Joe Borelli
FIRE-Final Inspection11/17/201611/18/201611/18/2016PCANC
DetailsJim Page
Inspection request will be rescheduled.
BLD-Conference11/3/201611/4/201611/4/2016ADONE
DetailsDave Hannah
Requesting walk through and TCO status review of Annex building. Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Final11/1/201611/2/201611/2/2016APART
DetailsDave Hannah
Requesting TCO for levels 1-9 of Office building. Phone #: ###-#### Inspection requested via web by Joe Borelli ok for temp occ on floors 1 thru 7 of office building
BLD-Final10/28/201610/28/201610/31/2016ANR
DetailsDave Hannah
Requesting final inspection for TCO of levels 1-9 of the Office building Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Final10/26/201610/27/201610/28/2016ACANC
DetailsDave Hannah
Requesting final inspection for TCO of levels 1-9 of the Office building Phone #: ###-#### Inspection requested via web by Joe Borelli
Extend Permit 90/180 days10/28/201610/28/201610/28/2016ACANC
DetailsDave Hannah
Requesting final inspection for TCO of levels 1-9 of the Office building Phone #: ###-#### Inspection requested via web by Joe Borelli
FIRE-Final Inspection10/26/201610/27/201610/27/2016APART
DetailsJim Page
TCO authorized for levels 2 through 9 of Simplot World Headquarters as well as lobby section of level 1, final inspection for parking level and annex building to be completed at a later date. Fire alarm complete for level 1 lobby, levels 2 through 9 for TCO. Fire sprinklers complete for level 1 lobby, levels 2 through 9 for TCO. Fire extinguishers are in place with current inspection tags in mentioned area's. Partial life fire safety inspection complete for TCO in mentioned area's. Remaining inspections to be completed at a later date.
BLD-Framing/Rough-in7/8/20167/8/20167/8/2016APASS
DetailsDave Hannah
Ceiling framing inspection on level 7, stacks 3 and 4. Contact Steve Lawson ###-####.
BLD-Framing/Rough-in7/8/20167/8/20167/8/2016APASS
DetailsDave Hannah
Interior framing level 9. Contact John Woods ###-####.
BLD-Framing/Rough-in7/8/20167/8/20167/8/2016APASS
DetailsDave Hannah
Ceiling framing inspection for all of level 6 for anytime this morning. Call Steve Lawson ###-####.
Print Occupancy Form  7/8/2016 DONE
Issue PAID IN FULL permit  7/8/2016 DONE
Expiration Notice6/29/20167/21/20166/29/2016 DONE
DetailsBrittany Hill
PLANS/APPL TAKEN TO FRONT DESK  5/17/2016 DONE
Instructed Permit Technicians not to batch stamp until shell and core plan was complete as well under BLD14-02143. Realizing the shell and core mod doesn't affect this lab area I am now sending to front desk to process. TLW
Permit Ready to Issue  5/17/2016 DONE
DetailsChristina Prado
DO NOT RE-ISSUE - PLAN MOD APPROVED 5/17/16
ALL REQUIREMENTS MET
MUST PAY ALL FEES PRIOR TO CHANGING STATUS TO ISS
Plan assigned to (TLW)2/11/2016 5/4/2016 PASS
DetailsTim L. Woodard
Plan Mod
Routing - MECHANICAL5/3/2016 5/4/2016 PASS
DetailsTroy James
Plan resubmittals received  5/3/2016 DONE
Routing - PLAN CHECK5/3/2016 5/3/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/31/2016 4/20/2016 FAIL
DetailsTim L. Woodard
Corrections noted in E-Plan Review. TLW
Routing PW Environmental4/1/2016 4/15/2016 PASS
DetailsRick Christenson
Routing - FIRE3/31/20163/31/20164/7/2016 PASS
DetailsKatie Marron
Plan modification to 5th floor lab layout. No additional comments required.
Routing - PLUMBING3/31/2016 4/6/2016 PASS
DetailsDaryl Spivey
install R.P. on lab water
Routing - MECHANICAL3/31/2016 4/4/2016 FAIL
DetailsTroy James
Routing - PUBLIC WORKS3/31/2016 4/1/2016 PASS
DetailsRachael Beierle
Changing the build out of the lab space on the 5th floor. TLW
Plan Modification Accepted  2/11/2016 DONE
DetailsChristina Prado
Plan mod to finish out the lab space per Angie
Issue PAID IN FULL permit  7/24/2015 DONE
DetailsChristina Prado
Print Occupancy Form  7/24/2015 DONE
DetailsChristina Prado
CHANGE ISSUED DATE  7/24/2015  
Extend Review Timeline  7/8/2015 DONE
DetailsChristina Prado
1st extension approved 7/8/15
Telephone call  7/6/2015 DONE
Spoke with Michael informing him that this permit is 12 days past its expiration and that all we need from the GC is the 302 and 306. I recommended to him to send an extension email to Jason Blais just to be safe.
Routing - MECHANICAL6/23/2015 6/30/2015 PASS
DetailsTroy James
Approved in E-Plan. TLW
Permit Ready to Issue  6/30/2015 DONE
need GC and rev cert of val
Routing Off Site - C.D.H1/23/2015 6/30/2015 PASS
DetailsJohn Menard
Routing - PLAN CHECK4/27/2015 6/30/2015 PASS
DetailsJohn Menard
Plan assigned to (TLW)5/5/2015 6/30/2015 PASS
DetailsTim L. Woodard
Simplot Headquarters TI - Reassigned from John Menard
Routing - PLAN CHECK5/18/2015 6/30/2015 PASS
DetailsTim L. Woodard
Routing PW Environmental5/28/2015 6/30/2015 PASS
DetailsRick Christenson
Approved in E-Plan Review. TLW
Routing - PLAN CHECK6/23/2015 6/23/2015 PASS
DetailsTim L. Woodard
A review to see if Previous "Changemarks" was completed. The original review was conducted by John Menard. Changemarks were all addressed. TLW
Plan resubmittals received  6/18/2015 DONE
Routing - PUBLIC WORKS5/28/2015 5/28/2015 PASS
DetailsJennifer Bruner
Revised plumbing sheets added
Routing PW Sewer Rating5/28/2015 5/28/2015 PASS
DetailsJennifer Bruner
Routing - MECHANICAL5/18/2015 5/28/2015 FAIL
DetailsTroy James
Routing - PUBLIC WORKS5/18/2015 5/19/2015 PASS
DetailsJennifer Bruner
New plumbing sheets resubmitted.
Routing PW Sewer Rating5/19/2015 5/19/2015 PASS
DetailsJennifer Bruner
No change to customer service area. Therefore, no change to fee.
Routing PW Environmental1/23/2015 5/19/2015 PASS
DetailsRick Christenson
Interceptor installed for bleach injection
Routing - PLUMBING5/18/2015 5/18/2015 PASS
DetailsDaryl Spivey
New plumbing sheets resubmitted.
See redline marks.
Plan resubmittals received  5/18/2015 DONE
Plan assigned to (JCM)1/23/2015 5/5/2015 DEFR
DetailsJohn Menard
1st Review Complete 3/12/2015
Reassigned to Tim Woodard.
Routing - MECHANICAL4/27/2015 4/29/2015 FAIL
DetailsTroy James
Routing - PLAN CHECK4/15/2015 4/27/2015 FAIL
DetailsJohn Menard
Routing - MECHANICAL4/15/2015 4/24/2015 FAIL
DetailsTroy James
1st review completed  3/19/2015 DONE
DetailsJohn Menard
Routing - PLAN CHECK2/5/2015 3/19/2015 FAIL
DetailsJohn Menard
Routing - MECHANICAL2/5/2015 2/12/2015 FAIL
DetailsTroy James
eplan
Routing - PLUMBING2/5/2015 2/5/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLAN CHECK1/23/2015 2/4/2015 FAIL
DetailsJohn Menard
Not yet reviewed, failed to allow upload of revised MEP plans. JCM
Routing - FIRE1/23/2015 2/2/2015 PASS
DetailsScott Arellano
Attached Fire Code comments to plans.
Routing PW Sewer Rating1/23/2015 1/29/2015 PASS
DetailsJennifer Bruner
Routing - MECHANICAL1/23/2015 1/29/2015 FAIL
DetailsTroy James
Need Idaho Stamped Mechanical Engineer for the sheets that apply.
Routing - PLUMBING1/23/2015 1/27/2015 FAIL
DetailsDaryl Spivey
re-submit with Idaho Engineer stamp
Routing - PUBLIC WORKS1/23/2015 1/23/2015 PASS
DetailsJennifer Bruner
Intake Approval  1/23/2015 PASS
DetailsJohn Menard
Pending Assignment by JCM1/23/2015 1/23/2015 DONE
DetailsJohn Menard
Plan Reviewer's activity  1/16/2015 PASS
DetailsCarl Westfall
2nd plan intake review completed. OK to submit.
Intake Approval  1/7/2015 FAIL
DetailsCarl Westfall
(1-7-15) Please resolve the circled items on the plan intake checklist.
Temporary Occupancy1/18/20174/18/2017   
Application received 12/26/2014