Print Statement | | | 2/7/2019 | | DONE |
|
|
|
|
Third Notice | | 11/11/2018 | 12/13/2018 | | DONE |
|
|
|
mailed 12-14
|
Second Notice | | 10/21/2018 | 11/6/2018 | | DONE |
|
|
|
mailed 11-12
|
First Notice | | 9/15/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
Permanent Occupancy | | | 9/5/2018 | | DONE |
|
|
|
|
BLD-Final | 8/31/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Dave Hannah
|
|
|
Victoria Phone #: ###-####
|
FIRE-Final Inspection | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Victoria Phone #: ###-####
|
Zoning Approval | 8/15/2018 | 8/15/2018 | 8/15/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 7/25/2018 | 7/25/2018 | 7/30/2018 | | PASS |
Dave Hannah
|
|
|
|
Temporary Occupancy | 7/10/2018 | 10/8/2018 | 7/10/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 90 day extension from 7-8-18
|
Telephone call | | | 7/6/2018 | | DONE |
|
|
|
emailed Victoria that the temp c of o was about to expire so she can email Jason B if they're not ready for a perm c of o yet
|
BLD-Aging Inspection | 5/25/2018 | 5/25/2018 | 5/30/2018 | | PEND |
Dave Hannah
|
|
|
|
Plan assigned to (AJS) | 4/9/2018 | 4/9/2018 | 5/22/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod - Add mechanical screen wall
|
OVERRIDE | | | 5/15/2018 | | |
|
|
|
|
Temporary Occupancy | 5/15/2018 | 8/13/2018 | 5/15/2018 | | DONE |
Candy A. Nichols
|
|
|
deferred submittals plan review complete-issued and changed back to Temp C of O status
|
Print Occupancy Form | | | 5/15/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/15/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2018 | | 5/15/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 5/15/2018 | | DONE |
|
|
|
no fees due for the deferred submittals
|
Routing - PLAN CHECK | 5/9/2018 | | 5/15/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 5/9/2018 | | 5/11/2018 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLAN CHECK | 4/12/2018 | | 5/9/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending structural, DR
|
Routing Off Site - STRUCTURAL | 4/25/2018 | | 4/25/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/25/2018 | | 4/25/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
need DR and structural approval
|
Routing - Design Review | 4/12/2018 | | 4/23/2018 | | FAIL |
Sarah Schafer
|
|
|
Show the details of the mechanical screens and the two locations where the mechanical screens will need to be installed.
|
Temporary Occupancy | 4/11/2018 | 7/10/2018 | 4/11/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd an extension request for the temp C of O
|
CHANGE STATUS TO (REV) | | | 4/11/2018 | | DONE |
|
|
|
had to change status to TMP to extend the expiration date-then had to change status back to REV for the plan mod
|
Telephone call | | | 4/11/2018 | | DONE |
|
|
|
called Victory again to let know that the temp c of o is now expired and that we need toleft message on her phone-also called Josh Durham and Mark Bowned - left a message on both phones
|
Plan Modification Accepted | | | 4/9/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod - Install additionsl mechanical screening to match existing
|
Telephone call | | | 4/6/2018 | | DONE |
|
|
|
emailed Victoria that the Temp C of O was about to expire
|
DOC - Permit Expired | 3/16/2018 | 3/16/2018 | 3/16/2018 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/12/2018 | 3/12/2018 | 3/16/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 1/17/2018 | 4/17/2018 | 1/17/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd temp c of o extension good for 90 days starting from 1/9/18
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | NR |
Dave Hannah
|
|
|
Victoria Phone #: ###-####
|
Telephone call | | | 1/3/2018 | | DONE |
|
|
|
emailed Victoria that the temp c of o will expire on 1/15/18
|
BLD-Aging Inspection | 11/8/2017 | 11/8/2017 | 11/15/2017 | | PEND |
Dave Hannah
|
|
|
needs air seal and mec connection at stairs in garage
|
Temporary Occupancy | 10/17/2017 | 1/15/2018 | 10/17/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd extension starting from 10/11/17
|
Telephone call | | | 10/11/2017 | | DONE |
|
|
|
called Victoria-she will email Jason B to requet an extension for the temp c of o
|
BLD-Aging Inspection | 8/28/2017 | 8/28/2017 | 8/29/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 8/29/2017 | 11/27/2017 | 8/29/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd temp c of o extension-i put the expiration date good thru BND date 10/11/17
|
Telephone call | | | 8/22/2017 | | DONE |
|
|
|
called Virginia to let know temp c of o is expired-she will look into it and either call in the final or request another extension
|
Temporary Occupancy | 6/30/2017 | 9/28/2017 | 6/30/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 6/30/2017 | 9/28/2017 | 6/30/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 6/30/2017 | 9/28/2017 | 6/30/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 6/30/2017 | 9/28/2017 | 6/30/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PART |
Jim Page
|
|
|
Life fire safety inspection complete for SWHQ main building (to include level 5 lab area and fire command), baffles will be fabricated to prevent cold solder in the tasting room on level 5 of annex building. FIR15-00641 is attached to this projec in project related cases, this FIR permit will remain in issued status until courtyard area is complete. Fire panel for SWHQ builing is showing a ground fault, issue will need to be resolved before final life fire safety inspection for courtyard area. After mentioned items have passed inspection then life fire safety can be finalized.
|
BLD-Aging Inspection | 6/16/2017 | 6/16/2017 | 6/20/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 4/11/2017 | 7/10/2017 | 4/11/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B-request for extension granted from 4/5/17 for 90 days
|
Temporary Occupancy | 4/11/2017 | 7/10/2017 | 4/11/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd an extension from May 4th not April 5th so had to redo temp c of o
|
BLD-Aging Inspection | 3/27/2017 | 3/27/2017 | 3/28/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 2/3/2017 | 5/4/2017 | 2/3/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Angie for the temp c of o
|
BLD-Final | 1/23/2017 | 1/27/2017 | 1/27/2017 | A | PART |
Dave Hannah
|
|
|
Requesting TCO on office building levels 1-9. Phone #: ###-#### Inspection requested via web by Joe Borelli ok for temp occ
|
FIRE-Final Inspection | 1/24/2017 | 1/26/2017 | 1/26/2017 | P | PART |
Jim Page
|
|
|
Egress lighting inspection complete for area's that sustained water damage.
|
FIRE-Final Inspection | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | CANC |
Jim Page
|
|
|
Egress/emergency lighting to be tested on 26JAN2017, this inspection request cancelled due to Simplot functions/personel that did not want to be interupted.
|
BLD-Final | 1/21/2017 | 1/25/2017 | 1/23/2017 | P | CANC |
Dave Hannah
|
|
|
Requesting TCO update for office building levels 1-9. Phone #: ###-#### >> Inspection requested via web by Joe Borelli Inspection cancelled from web by: Joe Borelli
|
CHANGE STATUS TO (ISS) | | | 1/18/2017 | | DONE |
|
|
|
as per Angie-temp c of o but changed back to iss so could call in inspections
|
BLD-Final | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | NR |
Dave Hannah
|
|
|
Requesting TCO for Office Building Level 1 West Phone #: ###-#### Inspection requested via web by Joe Borelli
|
Print Occupancy Form | | | 1/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/9/2017 | | DONE |
|
|
|
|
BLD-Final | 11/21/2016 | 11/22/2016 | 11/22/2016 | P | PART |
Dave Hannah
|
|
|
Requesting TCO on levels 1-4 of Annex Phone #: ###-#### Inspection requested via web by Joe Borelli ok for temp occ
|
FIRE-Final Inspection | 11/21/2016 | 11/22/2016 | 11/22/2016 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspections are complete for annex levels 1 through 4, fire alarm inspections are complete for annex levels 1 through 4, fire extinguishers are in place with current inspection tags for annex levels 1 through 4, commercial hood suppression system inspections for annex level 4 kitchen are complete, exit/emergency egress lighting inspected for annex levels 1 through 4 complete. Partial life fire safety inspection for TCO complete for levels 1 through 4 of annex building.
|
BLD-Final | 11/21/2016 | 11/21/2016 | 11/22/2016 | A | CANC |
Dave Hannah
|
|
|
Requesting TCO for levels 1-4 of Annex building Phone #: ###-#### Inspection requested via web by Joe Borelli
|
Extend Permit 90/180 days | 11/19/2016 | 11/21/2016 | 11/21/2016 | A | CANC |
Dave Hannah
|
|
|
Requesting TCO for levels 1-4 of Annex building Phone #: ###-#### Inspection requested via web by Joe Borelli
|
BLD-Final | 11/17/2016 | 11/18/2016 | 11/21/2016 | P | CANC |
Dave Hannah
|
|
|
Requesting TCO for levels 1-4 of Annex building Phone #: ###-#### Inspection requested via web by Joe Borelli
|
FIRE-Final Inspection | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | CANC |
Jim Page
|
|
|
Inspection request will be rescheduled.
|
BLD-Conference | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | DONE |
Dave Hannah
|
|
|
Requesting walk through and TCO status review of Annex building. Phone #: ###-#### Inspection requested via web by Joe Borelli
|
BLD-Final | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PART |
Dave Hannah
|
|
|
Requesting TCO for levels 1-9 of Office building. Phone #: ###-#### Inspection requested via web by Joe Borelli ok for temp occ on floors 1 thru 7 of office building
|
BLD-Final | 10/28/2016 | 10/28/2016 | 10/31/2016 | A | NR |
Dave Hannah
|
|
|
Requesting final inspection for TCO of levels 1-9 of the Office building Phone #: ###-#### Inspection requested via web by Joe Borelli
|
BLD-Final | 10/26/2016 | 10/27/2016 | 10/28/2016 | A | CANC |
Dave Hannah
|
|
|
Requesting final inspection for TCO of levels 1-9 of the Office building Phone #: ###-#### Inspection requested via web by Joe Borelli
|
Extend Permit 90/180 days | 10/28/2016 | 10/28/2016 | 10/28/2016 | A | CANC |
Dave Hannah
|
|
|
Requesting final inspection for TCO of levels 1-9 of the Office building Phone #: ###-#### Inspection requested via web by Joe Borelli
|
FIRE-Final Inspection | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PART |
Jim Page
|
|
|
TCO authorized for levels 2 through 9 of Simplot World Headquarters as well as lobby section of level 1, final inspection for parking level and annex building to be completed at a later date. Fire alarm complete for level 1 lobby, levels 2 through 9 for TCO. Fire sprinklers complete for level 1 lobby, levels 2 through 9 for TCO. Fire extinguishers are in place with current inspection tags in mentioned area's. Partial life fire safety inspection complete for TCO in mentioned area's. Remaining inspections to be completed at a later date.
|
BLD-Framing/Rough-in | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Dave Hannah
|
|
|
Ceiling framing inspection on level 7, stacks 3 and 4. Contact Steve Lawson ###-####.
|
BLD-Framing/Rough-in | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Dave Hannah
|
|
|
Interior framing level 9. Contact John Woods ###-####.
|
BLD-Framing/Rough-in | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Dave Hannah
|
|
|
Ceiling framing inspection for all of level 6 for anytime this morning. Call Steve Lawson ###-####.
|
Print Occupancy Form | | | 7/8/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/8/2016 | | DONE |
|
|
|
|
Expiration Notice | 6/29/2016 | 7/21/2016 | 6/29/2016 | | DONE |
Brittany Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2016 | | DONE |
|
|
|
Instructed Permit Technicians not to batch stamp until shell and core plan was complete as well under BLD14-02143. Realizing the shell and core mod doesn't affect this lab area I am now sending to front desk to process. TLW
|
Permit Ready to Issue | | | 5/17/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE - PLAN MOD APPROVED 5/17/16
ALL REQUIREMENTS MET
MUST PAY ALL FEES PRIOR TO CHANGING STATUS TO ISS
|
Plan assigned to (TLW) | 2/11/2016 | | 5/4/2016 | | PASS |
Tim L. Woodard
|
|
|
Plan Mod
|
Routing - MECHANICAL | 5/3/2016 | | 5/4/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 5/3/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/3/2016 | | 5/3/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/31/2016 | | 4/20/2016 | | FAIL |
Tim L. Woodard
|
|
|
Corrections noted in E-Plan Review. TLW
|
Routing PW Environmental | 4/1/2016 | | 4/15/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 3/31/2016 | 3/31/2016 | 4/7/2016 | | PASS |
Katie Marron
|
|
|
Plan modification to 5th floor lab layout. No additional comments required.
|
Routing - PLUMBING | 3/31/2016 | | 4/6/2016 | | PASS |
Daryl Spivey
|
|
|
install R.P. on lab water
|
Routing - MECHANICAL | 3/31/2016 | | 4/4/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 3/31/2016 | | 4/1/2016 | | PASS |
Rachael Beierle
|
|
|
Changing the build out of the lab space on the 5th floor. TLW
|
Plan Modification Accepted | | | 2/11/2016 | | DONE |
Christina Prado
|
|
|
Plan mod to finish out the lab space per Angie
|
Issue PAID IN FULL permit | | | 7/24/2015 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/24/2015 | | DONE |
Christina Prado
|
|
|
|
CHANGE ISSUED DATE | | | 7/24/2015 | | |
|
|
|
|
Extend Review Timeline | | | 7/8/2015 | | DONE |
Christina Prado
|
|
|
1st extension approved 7/8/15
|
Telephone call | | | 7/6/2015 | | DONE |
|
|
|
Spoke with Michael informing him that this permit is 12 days past its expiration and that all we need from the GC is the 302 and 306. I recommended to him to send an extension email to Jason Blais just to be safe.
|
Routing - MECHANICAL | 6/23/2015 | | 6/30/2015 | | PASS |
Troy James
|
|
|
Approved in E-Plan. TLW
|
Permit Ready to Issue | | | 6/30/2015 | | DONE |
|
|
|
need GC and rev cert of val
|
Routing Off Site - C.D.H | 1/23/2015 | | 6/30/2015 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 4/27/2015 | | 6/30/2015 | | PASS |
John Menard
|
|
|
|
Plan assigned to (TLW) | 5/5/2015 | | 6/30/2015 | | PASS |
Tim L. Woodard
|
|
|
Simplot Headquarters TI - Reassigned from John Menard
|
Routing - PLAN CHECK | 5/18/2015 | | 6/30/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 5/28/2015 | | 6/30/2015 | | PASS |
Rick Christenson
|
|
|
Approved in E-Plan Review. TLW
|
Routing - PLAN CHECK | 6/23/2015 | | 6/23/2015 | | PASS |
Tim L. Woodard
|
|
|
A review to see if Previous "Changemarks" was completed. The original review was conducted by John Menard. Changemarks were all addressed. TLW
|
Plan resubmittals received | | | 6/18/2015 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/28/2015 | | 5/28/2015 | | PASS |
Jennifer Bruner
|
|
|
Revised plumbing sheets added
|
Routing PW Sewer Rating | 5/28/2015 | | 5/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 5/18/2015 | | 5/28/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2015 | | 5/19/2015 | | PASS |
Jennifer Bruner
|
|
|
New plumbing sheets resubmitted.
|
Routing PW Sewer Rating | 5/19/2015 | | 5/19/2015 | | PASS |
Jennifer Bruner
|
|
|
No change to customer service area. Therefore, no change to fee.
|
Routing PW Environmental | 1/23/2015 | | 5/19/2015 | | PASS |
Rick Christenson
|
|
|
Interceptor installed for bleach injection
|
Routing - PLUMBING | 5/18/2015 | | 5/18/2015 | | PASS |
Daryl Spivey
|
|
|
New plumbing sheets resubmitted.
See redline marks.
|
Plan resubmittals received | | | 5/18/2015 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 1/23/2015 | | 5/5/2015 | | DEFR |
John Menard
|
|
|
1st Review Complete 3/12/2015
Reassigned to Tim Woodard.
|
Routing - MECHANICAL | 4/27/2015 | | 4/29/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLAN CHECK | 4/15/2015 | | 4/27/2015 | | FAIL |
John Menard
|
|
|
|
Routing - MECHANICAL | 4/15/2015 | | 4/24/2015 | | FAIL |
Troy James
|
|
|
|
1st review completed | | | 3/19/2015 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 2/5/2015 | | 3/19/2015 | | FAIL |
John Menard
|
|
|
|
Routing - MECHANICAL | 2/5/2015 | | 2/12/2015 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - PLUMBING | 2/5/2015 | | 2/5/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLAN CHECK | 1/23/2015 | | 2/4/2015 | | FAIL |
John Menard
|
|
|
Not yet reviewed, failed to allow upload of revised MEP plans. JCM
|
Routing - FIRE | 1/23/2015 | | 2/2/2015 | | PASS |
Scott Arellano
|
|
|
Attached Fire Code comments to plans.
|
Routing PW Sewer Rating | 1/23/2015 | | 1/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 1/23/2015 | | 1/29/2015 | | FAIL |
Troy James
|
|
|
Need Idaho Stamped Mechanical Engineer for the sheets that apply.
|
Routing - PLUMBING | 1/23/2015 | | 1/27/2015 | | FAIL |
Daryl Spivey
|
|
|
re-submit with Idaho Engineer stamp
|
Routing - PUBLIC WORKS | 1/23/2015 | | 1/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 1/23/2015 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 1/23/2015 | | 1/23/2015 | | DONE |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 1/16/2015 | | PASS |
Carl Westfall
|
|
|
2nd plan intake review completed. OK to submit.
|
Intake Approval | | | 1/7/2015 | | FAIL |
Carl Westfall
|
|
|
(1-7-15) Please resolve the circled items on the plan intake checklist.
|
Temporary Occupancy | 1/18/2017 | 4/18/2017 | | | |
|
|
|
|
Application received | | 12/26/2014 | | | |
|
|
|
|