Print Statement | | | 2/9/2016 | | DONE |
|
|
|
sent past due notice
|
Print Statement | | | 10/29/2015 | | DONE |
|
|
|
|
First Notice | | 10/2/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
FIRE-Final Inspection | 9/22/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
PubWorks Occupancy Approval | 9/22/2015 | 9/22/2015 | 9/22/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 9/22/2015 | | DONE |
|
|
|
|
BLD-Final | 9/20/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Rex Frazier
|
PubWorks Occupancy Approval | 9/21/2015 | 9/21/2015 | 9/21/2015 | | DONE |
Jason C. Taylor
|
|
|
Recieved Civil Engineers letter of approval. Project Completed.
|
FIRE-Alarm Testing | 9/15/2015 | 9/16/2015 | 9/15/2015 | A | DONE |
Jim Page
|
|
|
Needed final signature on Fire Alarm section of permit card, signature complete on card.
|
BLD-Conference | 9/13/2015 | 9/14/2015 | 9/14/2015 | A | PART |
Jim Storey
|
|
|
Requesting life safety. Not seeing the option on drop down menu. Phone #: ###-#### Inspection requested via web by Rex Frazier need plm/fire sign offs/si close out/ weight posting racking.
|
BLD-Conference | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Rex Frazier
|
BLD-Conference | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Storey
|
|
|
Relocation of 2 hour fire wall on existing loading dock. Phone #: ###-#### Inspection requested via web by Rex Frazier
|
BLD-Footing | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PART |
Jim Storey
|
|
|
Late morning or around noon. Footing rebar inspection we are scheduled to pour concrete approximately 2:00 pm Friday afternoon Phone #: ###-#### Inspection requested via web by Rex Frazier rebar ok si ok for concrete and massonary.
|
BLD-Other | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | DEFR |
Jim Storey
|
|
|
We are requesting a SWPPP inspection for the above project. I left a voice mail on the Public Works department system as well. According to the Erosion and Sediment Control Program information, inspections are requested through the PDS system. Phone #: ###-#### Inspection requested via web by Greg Baisch esc long
|
Issue PAID IN FULL permit | | | 3/19/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/19/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 2/24/2015 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/17/2015 | | 2/24/2015 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2015 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 2/24/2015 | | DONE |
Christina Prado
|
|
|
Need ACHD, RP, GC form and Revised Cert of Value to issue. All requirements have been met 3-17-15 blh
|
Plan assigned to (JCM) | 1/12/2015 | | 2/24/2015 | | PASS |
John Menard
|
|
|
1st Review Completed 2/5/2015
|
Routing - FIRE | 2/17/2015 | | 2/20/2015 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 2/17/2015 | | 2/19/2015 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 1/12/2015 | | 2/5/2015 | | FAIL |
John Menard
|
|
|
|
1st review completed | | | 2/5/2015 | | DONE |
John Menard
|
|
|
|
Routing - Addressing | 2/2/2015 | | 2/2/2015 | | PASS |
Emily Dixon
|
|
|
Address changed to 1125 W Amity Rd.
|
Routing Off Site - STRUCTURAL | 1/12/2015 | | 1/26/2015 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 1/12/2015 | | 1/20/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 1/12/2015 | | 1/20/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to architect. Attached report to case.
|
Routing PW Solid Waste | 1/12/2015 | | 1/14/2015 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 1/12/2015 | | 1/14/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Rating | 1/12/2015 | | 1/13/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 1/12/2015 | | 1/13/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 1/12/2015 | | 1/12/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
Addition to expand warehouse 8,904 s.f. plus 2,973 s.f. of mezzanine and connect two existing covered dock areas.
|
Routing - PLANNING Land Div | 1/12/2015 | | 1/12/2015 | | PASS |
Dave Abo
|
|
|
Parcel a of ROS 9917.
|
Routing - Design Review | 1/12/2015 | | 1/12/2015 | | PASS |
Andrea Tuning
|
|
|
|
Pending Assignment by JCM | 1/12/2015 | | 1/12/2015 | | DONE |
John Menard
|
|
|
|
Routing PW Street Lights | 1/12/2015 | | 1/12/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Intake Approval | | | 1/9/2015 | | PASS |
John Menard
|
|
|
|
Application received | | | 12/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2014 11:44AM
|