Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03711
StatusFinaled
Name TOEWS RICHARD
Site Address 723 N PIERCE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan Modification to add a dormer to the existing plans at the upper bedroom area** This permit is for an extensive remodel and 663s.f. addition to an existing 1197s.f. single family dwelling. The project will include the creation of a new 247s.f addition to the kitchen area including 93s.f. of new code complying stair to the upper level. the project will also include the remodel of the rear (west) portion of the upper level to allow for a new 323s.f. master suite. Separate electrical, plumbing, mechanical and ESC permits are required. R-1C setback proposed are approved by Sue Cummings. All per the approved plans as marked, Energy per prescriptive method, engineering calculations, ACCA report along with the plan review report. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20177/24/20177/24/2017PPASS
DetailsDave Hannah
Rick Phone #: ###-####
DOC - Permit Finaled7/24/20177/24/20177/24/2017PPASS
DetailsDave Hannah
BLD-Conference5/1/20175/1/20175/2/2017PDONE
DetailsDave Hannah
Call hour before // Rich Phone #: ###-####
BLD-Conference1/26/20171/26/20171/26/2017PDONE
DetailsJim Sly
Call hour before // Rick Phone #: ###-####
Told Rick to call Bill Vandergrift for advice on hood loaction.
BLD-Conference6/2/20166/3/20166/3/2016PPASS
DetailsDave Hannah
Rick Phone #: ###-####please call 45 minutes prior for access
BLD-Conference5/18/20165/19/20165/19/2016PDONE
DetailsPhil Shearer
Rick Phone #: ###-####. Stained glass window in shower.
BLD-Energy code compliance10/30/201510/30/201510/30/2015PPASS
DetailsDave Hannah
would like call ahead; Rick Phone #: ###-####
BLD-Framing/Rough-in10/20/201510/20/201510/20/2015PPASS
DetailsDave Hannah
Rick Phone #: ###-####-please call 1 prior to meet
BLD-Conference10/5/201510/5/201510/5/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference9/29/20159/30/20159/30/2015ADONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference8/20/20158/20/20158/20/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference8/11/20158/11/20158/11/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
CHANGE STATUS TO (ISS)  8/10/2015 DONE
no fees due as per Troy James
Routing - MECHANICAL8/7/2015 8/10/2015 PASS
DetailsTroy James
Routing Walk-In (BLD)8/7/20158/7/20158/7/2015PCANC
DetailsBrian McGowan
revision dropped off
Plan Modification Accepted  8/7/2015 DONE
revised manual D&J
BLD-Conference8/6/20158/6/20158/6/2015PDONE
DetailsDave Hannah
Rich Phone #: ###-####
BLD-Conference7/29/20157/29/20157/29/2015PPASS
DetailsJim Storey
Rick Phone #: ###-####
BLD-Conference7/15/20157/15/20157/16/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference6/16/20156/16/20156/17/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference6/15/20156/15/20156/15/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
Routing Walk-In (BLD)6/4/20156/4/20156/4/2015APASS
DetailsJavier Guzman
Case Summary (BLD)  6/4/2015 DONE
DetailsJavier Guzman
Inspection Record Card- Bld  6/4/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/4/2015 DONE
CHANGE STATUS TO (ISS)  6/4/2015 DONE
plan mod complete-no fees assessed
BLD-Conference6/2/20156/3/20156/3/2015ADONE
DetailsDave Hannah
Rich Phone #: ###-#### needs to resubmit plans for change to second floor
BLD-Conference5/28/20155/28/20155/28/2015PCANC
DetailsTony Young
Rick// please call before Phone #: ###-####
BLD-Conference5/26/20155/26/20155/26/2015PDONE
DetailsJim Storey
Rick Phone #: ###-#### going to add dormer to front of house.fyi
BLD-Conference4/16/20154/16/20154/17/2015PDONE
DetailsDave Hannah
Rich Phone #: ###-####
BLD-Conference3/30/20153/30/20153/30/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Foundation3/23/20153/23/20153/23/2015PPASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Footing3/19/20153/19/20153/19/2015PPASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference3/4/20153/5/20153/5/2015APASS
DetailsDave Hannah
Please call ahead for access -Richard Phone #: ###-####
Issue PAID IN FULL permit  2/27/2015 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  2/27/2015 DONE
DetailsCandy A. Nichols
OVERRIDE  2/24/2015  
Routing Walk-In (BLD)2/24/20152/24/20152/24/2015ADONE
DetailsPerry Paine
Routing Walk-In (BLD)12/31/201412/31/20142/24/2015ADONE
DetailsCandy A. Nichols
Plan resubmittals received  2/24/2015 DONE
new engineering for roof beam details and plan sheets to match
2-24-2025 pep
Routing - PLAN CHECK12/31/2014 2/24/2015 PASS
DetailsPerry Paine
Telephone call  2/24/2015 DONE
called Richard- let him know permit is ready for pick up and fees due
PLANS/APPL TAKEN TO FRONT DESK  2/24/2015 DONE
Permit Ready to Issue  2/24/2015 DONE
all requirements met- FEES DUE
Plan assigned to (PEP)1/9/20151/9/20151/9/2015 DONE
DetailsPerry Paine
Inspection Record Card- Bld  1/9/2015  
1st review completed  1/9/2015 FAIL
need engineering
Routing Walk-In (Zoning)12/31/201412/31/201412/31/2014APASS
DetailsSue Cummings
Routing - MECHANICAL12/31/2014 12/31/2014 PASS
DetailsTroy James
Application received 12/31/2014