Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD15-00040
StatusFinaled
Name LEVEL CONSTRUCTION LLC
Site Address 427 N CURTIS RD
Project NameCoyote Design
Customer Number 
ePlanReviewYes
Description
(COYOTE DESIGN & MFG. INC.)(REHAB SYSTEMS BOISE, INC)(Plan Modificatoin 3/20/15 Redesign layout of prosthetic fitting room, add new column and flloting along gridl ine C 16ft from east wall per structural calculaitons and remove door between Gait hallway 112 and hall 105. **ajs**Plan Modification 2/27/15 Revised plans submitted after verification at site that there is NO fire alarm system in the facility. **ajs** A new industrial tenant improvement including offices, manufacturing and storage area within an entire existing building. Work to include the removal of existing interior walls, doors, exterior windows, ceiling grid, finish materials and woodwork, mechanical and electrical fixtures. Installations of new interior nonbearing walls, windows, doors, finish materials, millwork and ceiling grid etc. Plumbing, mechanical and electrical permits are required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/5/20156/10/2015 DONE
Mailed out 6-10-15
BLD-Final5/26/20155/26/20155/26/2015PPASS
DetailsMike Jordan
Andy Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  5/26/2015 DONE
Permanent Occupancy  5/26/2015 DONE
BLD-Final5/12/20155/13/20155/13/2015APART
DetailsMike Jordan
Andy Phone #: ###-####. Ok for temp occ.
Temporary Occupancy5/13/20158/11/20155/13/2015 DONE
DetailsCandy A. Nichols
Zoning Approval5/13/20155/13/20155/13/2015 PASS
DetailsJosh Wilson
FIRE-Final Inspection5/12/20155/12/20155/12/2015PPASS
DetailsTroy Cobbley
life safety passed
BLD-Ceiling Grid Inspection5/6/20155/7/20155/7/2015APASS
DetailsMike Jordan
Andy Phone #: ###-####
BLD-Framing/Rough-in3/24/20153/25/20153/25/2015APASS
DetailsMike Jordan
Andy Phone #: ###-####. Interio steel stud walls and infill ok.
Plan assigned to (AJS)3/19/20153/19/20153/24/2015 PASS
DetailsAdele J Schaffeld-Griffin
my review complete Plan Mod - Coyote Design
Routing - PLAN CHECK3/24/2015 3/24/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/24/2015 DONE
CHANGE STATUS TO (ISS)  3/24/2015 DONE
Plan Mod fees paid
Routing - FIRE3/19/20153/19/20153/23/2015 PASS
DetailsScott Arellano
No change to 3/2 Fire review comments.
Routing - PLAN CHECK3/19/2015 3/20/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - Design Review3/20/2015 3/20/2015 PASS
DetailsSarah Schafer
adding small ramp on exterior Signed off as part of the building permit.
Plan Modification Accepted  3/17/2015 DONE
BLD-Footing3/11/20153/11/20153/11/2015PPASS
DetailsMike Jordan
Andy Phone #: ###-####
Plan assigned to (AJS)2/27/20152/27/20153/2/2015 PASS
DetailsAdele J Schaffeld-Griffin
my review completed Plan Mod - Coyote Design
Routing - FIRE2/27/20152/27/20153/2/2015 PASS
DetailsScott Arellano
Revised Plan review comments. Attached comments to case.
CHANGE STATUS TO (ISS)  3/2/2015 DONE
No Plan review fees for Plan Mod per Adele
Routing - PLAN CHECK2/27/2015 2/27/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan Modification Accepted  2/27/2015 DONE
Per Rob T.
FIRE-Conference2/20/20152/23/20152/23/2015ADONE
DetailsForrest France
Conference with contractor regarding scope of work indicated. Per contractor the building is not equipped with an existing fire alarm system as noted.
Issue PAID IN FULL permit  2/19/2015 DONE
DetailsChristina Prado
Print Occupancy Form  2/19/2015 DONE
DetailsChristina Prado
Route to Impact Fee Review2/9/20152/12/20152/13/2015 PASS
DetailsCindy M. Gould
OVERRIDE  2/10/2015  
Plan assigned to (AJS)1/21/20151/21/20152/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 3 TI - ePlanReview - Coyote Design
Routing - PLAN CHECK2/10/2015 2/10/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK2/10/2015 2/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/10/2015 DONE
Permit Ready to Issue  2/10/2015 DONE
DetailsCandy A. Nichols
need GC and rev cert of val
1st review completed  2/9/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK1/21/2015 2/9/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE1/21/20151/21/20151/27/2015 PASS
DetailsScott Arellano
Attached Fire Code comments to plans.
Routing - MECHANICAL1/21/2015 1/22/2015 PASS
DetailsTroy James
Dust collection-grinding, lamination bench exhaust
Routing - PUBLIC WORKS1/21/2015 1/22/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment1/21/2015 1/22/2015 PASS
DetailsEvan Jenkins
A new industrial type tenant improvement with office, manufacturing and storage to occupy the entire existing building. Work to include minor saw cutting for 6 new sinks and interior modifications for new tenant.
Routing - PLUMBING1/21/2015 1/22/2015 PASS
DetailsBill VanDegrift
Routing PW Sewer Rating1/22/2015 1/22/2015 PASS
DetailsJennifer Bruner
Routing PW Environmental1/22/2015 1/22/2015 PASS
DetailsRick Christenson
No Production work. Design and Research.
Routing - Addressing1/21/2015 1/21/2015 PASS
DetailsEmily Dixon
Routing - Design Review1/21/2015 1/21/2015 PASS
DetailsSarah Schafer
Sarah Schafer - some new/replaced exterior doors Window replacement approved through building permit.
Routing - PLANNING1/21/2015 1/21/2015 PASS
DetailsCody Riddle
Per discussion with Planning Director and Zoning Administrator, this is an allowed use, similar to a medical office/laboratory.
Pending Assignment by JCB1/21/2015 1/21/2015 DONE
DetailsJason Blais
Plan Reviewer's activity  1/20/2015 DONE
DetailsAdele J Schaffeld-Griffin
Planning approval needs sent to Cody for the F1 occupancy in the commercial zone per Cody.
Sarah approved submittal with no zoning certificate she asked that it be routed to her to approve.
Intake Approval  1/20/2015 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Intake Approval  1/15/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1-provide zoning certificate for exterior changes
2- verify use okay for zone

1-12-15 Please provide zoning certificate for exterior changes.

1-15-15 Please provide zoning certificate for exterior changes.
Intake Approval  1/12/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1-provide zoning certificate for exterior changes
2- verify use okay for zone

1-12-15 Please provide zoning certificate for exterior changes.
Intake Approval  1/9/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1-provide zoning certificate for exterior changes
2- verify use okay for zone
Application received  1/8/2015 DONE