Third Notice | | 6/17/2017 | 6/21/2017 | | DONE |
|
|
|
This permit finaled on the web by Joe Swinford
|
Second Notice | | 5/20/2017 | 6/12/2017 | | DONE |
|
|
|
Mailed 6-13-17
|
First Notice | | 5/8/2017 | 5/10/2017 | | DONE |
|
|
|
Mailed 5-11
|
BLD-Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Jim Sly
|
|
|
Scott Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 4/28/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/26/2017 | 4/27/2017 | 4/27/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 4/27/2017 | 4/27/2017 | 4/27/2017 | | DONE |
Andrea Tuning
|
|
|
|
OVERRIDE | | | 4/26/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 4/19/2017 | 4/19/2017 | 4/26/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/19/2017 | | 4/26/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/26/2017 | | DONE |
|
|
|
plan mod fee paid
|
Permit Ready to Issue | | | 4/26/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
Routing - FIRE | 4/19/2017 | 4/19/2017 | 4/24/2017 | | PASS |
Katie Marron
|
|
|
Minor modifications to the floor plan layout. Site plan no longer indicates a vehicle gate to the north.
|
Route to Impact Fee Review | 4/19/2017 | 4/22/2017 | 4/20/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - Design Review | 4/19/2017 | | 4/20/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PUBLIC WORKS | 4/19/2017 | | 4/20/2017 | | PASS |
Rachael Beierle
|
|
|
CREDITS UTILIZED. NO NEW FEES.
|
FIRE-Final Inspection | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans indicating the removal of the proposed fence/gate and fenced area at the south side of building, deletion of the south exit door from the Conference Room, deletion of exit signs, all interior door hardware needs addressed, indicator on main exit
|
Plan Modification Accepted | | | 4/17/2017 | | DONE |
|
|
|
Plan mod workflow in ePlan started to change design professionals
|
BLD-Final | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | NR |
Jim Sly
|
|
|
Scott Phone #: ###-#### Need Zoning and Fire / Life Safety finals.
|
PubWorks Occupancy Approval | 11/16/2016 | 11/16/2016 | 11/16/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 11/14/2016 | | DONE |
|
|
|
|
BLD-Wall cover | 11/4/2016 | 11/7/2016 | 11/7/2016 | A | PASS |
Jim Sly
|
|
|
Call 15 minutes before // Scott Phone #: ###-#### Resubmittal for non rated wall to replace 1hr wall.....OK. Insulation OK and all framing OK.
|
OVERRIDE | | | 11/4/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 10/10/2016 | 10/10/2016 | 11/4/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed
|
Routing - PLAN CHECK | 11/4/2016 | | 11/4/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
change from storage to mercantile for part of building
|
Permit Ready to Issue | | | 11/4/2016 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
CHANGE STATUS TO (ISS) | | | 11/4/2016 | | DONE |
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 10/21/2016 | | 10/21/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plans submitted and the corrections have not been made. I called architect and left message.
|
Routing - PLAN CHECK | 10/20/2016 | | 10/20/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Modification Accepted | | | 10/10/2016 | | DONE |
|
|
|
plan mod excepted in e plan review
|
BLD-Framing/Rough-in | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PART |
Jim Sly
|
|
|
Mechanical and plumbing inspections are also scheduled for this afternoon. If we need to wait until those inspection are complete, we can reschedule the framing inspection to Monday. Please call with any questions. Phone #: ###-#### Inspection requested via web by Joe Swinford FRaming OK.........Need Detail and listing from Architect for 1 hr wall. 1 hr wall hhas had no inspection.
|
FIRE-Conference | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | DONE |
Troy Cobbley
|
|
|
I spoke to the architect about emergency lighting. It does not appear that it is required.
|
FIRE-Conference | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | DONE |
Katie Marron
|
|
|
Phone call with Applicant about Exit signs. Due to low occupancy discussed that exit signs are not required but if installed need to meet all code requirements.
|
BLD-Wall Bracing | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
Jim Sly
|
|
|
Shear // Scott Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/12/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/16/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 5/11/2016 | 5/11/2016 | 5/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 5/16/2016 | | 5/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
no change to building, site drainage and civil work
|
Permit Ready to Issue | | | 5/16/2016 | | DONE |
|
|
|
plan mod fees due (PWK16-00054) - DO NOT RE-ISSUE
|
Routing PW Drainage | 5/13/2016 | | 5/13/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 5/11/2016 | | 5/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, valid RP designated. note: Project is already active.
|
Routing - PLUMBING | 5/11/2016 | | 5/11/2016 | | PASS |
Daryl Spivey
|
|
|
|
Routing PW Drainage | 5/11/2016 | | 5/11/2016 | | PASS |
Brian Murphy
|
|
|
less than 1000 sq feet new bld
|
Routing - Design Review | 5/11/2016 | | 5/11/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - Addressing | 5/11/2016 | | 5/11/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2016 | | 5/11/2016 | | PASS |
Rachael Beierle
|
|
|
Sent to Brian Murphy in Drainage
|
BLD-Foundation | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Jim Sly
|
|
|
Cal Phone #: ###-####
|
BLD-Footing | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Jim Sly
|
|
|
Cal Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/2/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/2/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/4/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/26/2015 | 8/26/2015 | 1/4/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - Energy Seal
|
Routing Off Site - STRUCTURAL | 12/29/2015 | | 1/4/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2016 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 2-2-16 /CEV
please see attached-no ACHD required CAN 2-1-16-Need ACHD, RP, GC form, and revised certificate of vlaue for issuance
|
Routing - PLAN CHECK | 12/29/2015 | | 12/30/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Extend Review Timeline | | | 12/21/2015 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 12/17/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
emailed experation letter, see documents
|
Routing - PLAN CHECK | 11/10/2015 | | 11/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 11/10/2015 | | 11/18/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 11/10/2015 | | 11/12/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 11/10/2015 | 11/10/2015 | 11/10/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - Erosion and Sediment | 11/10/2015 | | 11/10/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(ENERGY SEAL) Demolition of approximately 1,281 sq foot of existing building. Approximately 1,454 sq footage will remain after construction of a 458 sq foot new addition is constructed under this permit. Scope of work to include site work as shown on approved plans, foundation, structural frame, finish material, plumbing, mechanical and electrical work
|
Plan Reviewer's activity | | | 11/10/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
LeGrand, I am sending this project back to you to be corrected prior to being able to route for review. Please re upload the structural calculations they are blank. You may need to contact the engineer due to the fact that there is always an issue with their specific documents not uploading. Also the structural drawings have to be upload with the same exact name in order to version on top of the old sheet. Please correct the naming and re upload the sheets.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
Planning and Development Services
City of Boise
###-####
|
1st review completed | | | 9/25/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 8/27/2015 | | 9/25/2015 | | PASS |
Brian Murphy
|
|
|
NO REVEIW NEEDED NO NEW SQ FOOTAGE
|
Routing - PLAN CHECK | 8/26/2015 | | 9/25/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 8/26/2015 | | 9/24/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 8/26/2015 | | 9/8/2015 | | FAIL |
Josh Wilson
|
|
|
Comply with conditions of DRH15-00359
|
Routing - FIRE | 8/26/2015 | 8/26/2015 | 8/31/2015 | | FAIL |
Scott Arellano
|
|
|
Comments attached to case and emailed to architect.
|
Routing - MECHANICAL | 8/26/2015 | | 8/27/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 8/27/2015 | | 8/27/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing PW Sewer Rating | 8/27/2015 | | 8/27/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 8/26/2015 | | 8/27/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/26/2015 | | 8/27/2015 | | FAIL |
Evan Jenkins
|
|
|
Need to Protect Drop Inlets around the entire Project (located along N. Phillippi St, W. Bond St. and N. Latah St..
Where is the access (Construction Entrance) for this project?
Need Full ESC Narrative to go along with ammended ESC Site Map. Evan Jenkins 794.3958
|
Routing - Addressing | 8/26/2015 | | 8/26/2015 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 8/26/2015 | | 8/26/2015 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 8/26/2015 | | DONE |
Jason Blais
|
|
|
Contacted architect to have him contact ACHD for evaluation of any impact fees or inspection required. Written verification to be provided to our Permit Counter prior to the building permit being issued.
|
Intake Approval | | | 8/25/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Intake Approval | | | 8/20/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1-9-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-Please upload the 304 design professional form.
3- A design professional of record will need to stamp these plans.
4- Please provide complete structural plans stamped by a licensed Idaho engineer.
5- Please contact Bob Archibald in regards to the bonding required for this demolition.
Other comments may need to be added once check list is completed and uploaded.
1-27-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-2-15 Please see items in red on the major check list. These items are missing for the pre screen to be accepted.
8-17-15- Please see items in red on major check list that is still missing.
Please complete and upload the 304 form.
8/19/15-Please re upload the structural calculations, the pages on the document you uploaded are blank.
Please stamp and sign the drawings that are currently not. All drawings are required to be stamped and signed by a design professional.
|
Intake Approval | | | 8/20/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1-9-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-Please upload the 304 design professional form.
3- A design professional of record will need to stamp these plans.
4- Please provide complete structural plans stamped by a licensed Idaho engineer.
5- Please contact Bob Archibald in regards to the bonding required for this demolition.
Other comments may need to be added once check list is completed and uploaded.
1-27-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-2-15 Please see items in red on the major check list. These items are missing for the pre screen to be accepted.
8-17-15- Please see items in red on major check list that is still missing.
Please complete and upload the 304 form.
8/19/15-Please re upload the structural calculations, the pages on the document you uploaded are blank.
Please stamp and sign the drawings that are currently not. All drawings are required to be stamped and signed by a design professional.
8/19/20-Please re upload the structural calculations, the pages on the document you uploaded are blank.
|
Intake Approval | | | 8/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1-9-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-Please upload the 304 design professional form.
3- A design professional of record will need to stamp these plans.
4- Please provide complete structural plans stamped by a licensed Idaho engineer.
5- Please contact Bob Archibald in regards to the bonding required for this demolition.
Other comments may need to be added once check list is completed and uploaded.
1-27-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-2-15 Please see items in red on the major check list. These items are missing for the pre screen to be accepted.
8-17-15- Please see items in red on major check list that is still missing.
Please complete and upload the 304 form.
|
Telephone call | | | 8/13/2015 | | DONE |
|
|
|
Left a message with LeGrand informing him to just sign off on the task that was sent to him
|
BLD-Conference | 2/3/2015 | 2/3/2015 | 2/4/2015 | P | DONE |
Bob Archibald
|
|
|
Set demo bond. $9000.00 demo bond required. Also need engineering review for new exterior wall.
|
Intake Approval | | | 2/2/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1-9-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-Please upload the 304 design professional form.
3- A design professional of record will need to stam these plans.
4- Please provide complete structural plans stamped by a licensed Idaho engineer.
5- Please contact Bob Archibald in regards to the bonding required for this demolition.
Other comments may need to be added once check list is completed and uploaded.
1-27-15
1- This is not a minor TI. Please complete upload the major TI checklist.
2-2-15 Please see items in red on the major check list. These items are missing for the pre screen to be accepted.
|
Intake Approval | | | 1/27/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1-27-15
1- This is not a minor TI. Please complete upload the major TI checklist.
4- Please provide complete structural plans stamped by a licensed Idaho engineer.
5- Please contact Bob Archibald in regards to the bonding required for this demolition.
Other comments may need to be added once check list is completed and uploaded.
|
Intake Approval | | | 1/9/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1- This is not a minor TI. Please complete upload the major TI checklist.
2-Please upload the 304 design professional form.
3- A design professional of record will need to stam these plans.
4- Please provide complete structural plans stamped by a licensed Idaho engineer.
5- Please contact Bob Archibald in regards to the bonding required for this demolition.
Other comments may need to be added once check list is completed and uploaded.
|
Application received | | | 1/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 8 2015 4:10PM
|