Telephone call | | | 10/20/2015 | | DONE |
|
|
|
Left a message for Mike to find out who gets the extar value for PLM and to see if there was MEC work done since there is no permit and he gave a value.
|
First Notice | | 9/25/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
BLD-Final | 9/14/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Jim Sly
|
|
|
Phone number is for job superintendent, Tim Mitchell. Phone #: ###-#### Inspection requested via web by Kent Mussell OK for perm Occ.
|
FIRE-Final Inspection | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 9/15/2015 | 9/15/2015 | 9/15/2015 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 9/15/2015 | | DONE |
|
|
|
|
BLD-Final | 9/11/2015 | 9/15/2015 | 9/14/2015 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kent Mussell Inspection cancelled from web by: Kent Mussell
|
FIRE-Final Inspection | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire dept access per sheet A 1-0, provide fire extinguisher as discussed, remove the thumbturn dead bolt from the exit door and provide keyed with indicator and sticker or provide single action lever type.
|
BLD-Final | 9/9/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Kent Mussell. Needs finals on MEP's life/safety and zoning first.
|
BLD-Energy code compliance | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kent Mussell
|
BLD-Framing/Rough-in | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Kent Mussell
|
BLD-Wall Bracing | 7/24/2015 | 7/24/2015 | 7/28/2015 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kent Mussell
|
Routing - PLUMBING | 7/15/2015 | | 7/15/2015 | | PASS |
Daryl Spivey
|
|
|
Sand/oil interceptor to be vented out seperately
|
Plan assigned to (CDM) | 6/23/2015 | | 7/13/2015 | | DONE |
Carl D Madsen
|
|
|
Plan Mod.
|
BLD-Foundation | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Jim Sly
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PART |
Jim Sly
|
|
|
Ryan Phone #: ###-#### Started pouring right before I arrived. Checked rebar .rebar OK per plan. Plan lacking small Docs. Unable to determine if special insp Req. Called Kent Mussel Constr. Notified of problem.
|
OVERRIDE | | | 6/26/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/26/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/26/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2015 | | DONE |
|
|
|
Spoke with Kent and recommended Kent send Jason a letter for an extension just in case. Plans were turn in for a plan mod
|
Permit Ready to Issue | | | 6/26/2015 | | DONE |
|
|
|
need GC, RP, ACHD contractor is applicant so no rev cert of val needed
|
Routing - PLAN CHECK | 6/23/2015 | | 6/26/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Rating | 6/23/2015 | | 6/25/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Environmental | 6/23/2015 | | 6/25/2015 | | PASS |
Rick Christenson
|
|
|
Sand and Oil Interceptor shown connected to floor drains.
|
Routing - PUBLIC WORKS | 6/23/2015 | | 6/23/2015 | | PASS |
Jennifer Bruner
|
|
|
Adding grease trap and floor drains
|
Plan Modification Accepted | | | 6/23/2015 | | DONE |
|
|
|
Mod to add grease interceptor. TLW
|
Plan resubmittals requested | | | 6/22/2015 | | DONE |
|
|
|
per Kent Mussell- he wants to do resubmittal
|
CHANGE STATUS TO (REV) | | | 6/22/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/30/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 3/4/2015 | | 4/30/2015 | | PASS |
Carl D Madsen
|
|
|
new due 4/1 First review completed 4/1/15
|
Routing - PUBLIC WORKS GRADING | 4/22/2015 | | 4/30/2015 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/30/2015 | | DONE |
|
|
|
need GC, RP, ACHD contractor is applicant so no rev cert of val needed
|
Routing - PLAN CHECK | 4/22/2015 | | 4/22/2015 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 4/1/2015 | 4/4/2015 | 4/7/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 4/1/2015 | | FAIL |
|
|
|
|
Routing PW Drainage | 3/5/2015 | | 4/1/2015 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 3/4/2015 | | 4/1/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Environmental | 3/5/2015 | | 3/16/2015 | | PASS |
Rick Christenson
|
|
|
Service area to be dry shop.
|
Routing PW Solid Waste | 3/6/2015 | | 3/12/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - Design Review | 3/4/2015 | | 3/10/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 3/4/2015 | | 3/6/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PUBLIC WORKS | 3/4/2015 | | 3/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 3/4/2015 | | 3/5/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED)
Construction of a new 28' x 40' shop to be used for the repair of motor vehicles.
|
Routing - PLANNING Land Div | 3/4/2015 | | 3/5/2015 | | PASS |
Dave Abo
|
|
|
Lots 3-5 of J-Bar-J Subdivision.
|
Routing - Addressing | 3/4/2015 | | 3/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 3/4/2015 | | PASS |
John Menard
|
|
|
|
Intake Approval | | | 1/16/2015 | | FAIL |
Tim L. Woodard
|
|
|
Kent,
I've tried to call you about this project. This being commercial it will need full engineering. Also you will need to review the "Electronic Submittal Standards" for commercial. They require each plan sheet to be uploaded individually. The #502 submittal checklist will also require additional documents and possible additional plans to be submitted. When you have time it might be best to come down and review the project. I notice there isn't a Design Review approval for the site either that may take addtional time to get through our Planning and Zoning Division.
Best regards,
Tim Woodard
City of Boise / Plans Examiner II
208 3843817
twoodard@cityofboise.org
|
Application received | | | 1/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 8 2015 4:56PM
|
Expiration Notice | 6/17/2015 | 7/9/2015 | | | |
|
|
|
|
Pending Assignment by JCM | 3/4/2015 | | | | |
John Menard
|
|
|
|