BLD-Final | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Dave Hannah
|
|
|
As late as possible // Brandon Phone #: ###-####
|
DOC - Permit Finaled | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 5/3/2016 | 5/3/2016 | 5/3/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Concrete | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Dave Hannah
|
|
|
Front stairs - Brandon Phone #: ###-####
|
PubWorks Subgrade Approval | 8/18/2015 | 8/18/2015 | 8/18/2015 | | DONE |
Jason C. Taylor
|
|
|
**STAIR SUBGRADE ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Other | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Dave Hannah
|
|
|
Fire rated soffits - Brandon Phone #: ###-####
|
BLD-Energy code compliance | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
OVERRIDE | | | 8/10/2015 | | |
|
|
|
|
Plan assigned to (JG) | 8/3/2015 | 8/3/2015 | 8/10/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 8/07 Plan mod #2
|
Telephone call | | | 8/10/2015 | | DONE |
|
|
|
called Josh to let know plan mod is ready and how much is owed-left message
|
CHANGE STATUS TO (ISS) | | | 8/10/2015 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 8/10/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 8/10/2015 | | 8/10/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 8/10/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/10/2015 | | DONE |
|
|
|
please do not re issue
|
Routing - PLAN CHECK | 8/7/2015 | | 8/7/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 8/4/2015 | | 8/7/2015 | | FAIL |
Troy James
|
|
|
emailed idaho hvac
|
Routing - MECHANICAL | 8/7/2015 | | 8/7/2015 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 8/7/2015 | | DONE |
Christina Prado
|
|
|
Received two full sets of plans marked A0.0, A1.0, A2.0, A3.0, S1.0, S2.0, S3.0, S4.0 & E1.0; Plans stamped and taken to Javier for further review
|
Plan resubmittals received | | | 8/4/2015 | | DONE |
|
|
|
received two copies of shhet A2.0- put on Javier's desk
|
Routing - PLANNING | 8/4/2015 | | 8/4/2015 | | PASS |
Brent Moore
|
|
|
|
Plan Modification Accepted | | | 8/3/2015 | | DONE |
Christina Prado
|
|
|
Plan mod accepted for changes to the entrance stairway as well as minor interior wall changes. Received two sets fo revised plan sheets marked A0.0, A1.0, A2.0, A3.0, E1.0, S1.0, S2.0, S3.0 & S4.0 as well as one revised manual J and two revised 8 1/2 X 11 site plans; Plans stamped and taken to Javier for review
|
BLD-Framing/Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | FAIL |
Mike Jordan
|
|
|
Josh phone ###-####. Noted no engineering to coorect any of the wall bracing issues from previous inspection and correction notice. Portal frame nailing not complete. Provide h2.5 on interior bearing on T40, T41 and T42 trusses. Provide an approved fix from truss engineer for T46 truss. Provide (2) 2x at interior bearing for 2ply T02. Complete lateral bracing on on 2ply T47 and instsall the required bearing blocks. South bearing on trussesT17 thru T21 and J02 thru J05 aRE BEARING AT THE INCOORECT LOCATION. Provide approved fix or that the beaRING location ids ok from truss engineer. Provide blocking at interior bearing for t36 thru t39 trusses and h2.5. Fireblock the concealed space in garage above electrical panel at ceiling level. A correction notice has been posted. No insulation or exterior cover at this time.
|
BLD-Framing/Rough-in | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | NR |
Jim Sly
|
|
|
Josh Phone #: ###-#### Correction notice posted.....Tried to do Shear and framing........was only able to complete shear (some what) because it was so incomplete. Ran out of time.
|
BLD-Wall Bracing | 7/20/2015 | 7/20/2015 | 7/21/2015 | P | FAIL |
Dave Hannah
|
|
|
Shear // Josh Phone #: ###-#### needs to restapel
|
BLD-Wall Bracing | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | FAIL |
Dave Hannah
|
|
|
Josh Phone #: ###-#### c/n on site
|
BLD-Footing | 4/28/2015 | 4/28/2015 | 4/29/2015 | P | PASS |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Foundation | 4/29/2015 | 4/29/2015 | 4/29/2015 | A | PASS |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 4/23/2015 | 4/23/2015 | 4/23/2015 | P | PASS |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 4/20/2015 | 4/21/2015 | 4/23/2015 | A | NR |
Dave Hannah
|
|
|
JR Phone #: ###-#### needs geo sign off no inspection done
|
PubWorks Subgrade Approval | 4/23/2015 | 4/23/2015 | 4/23/2015 | | DONE |
Jason C. Taylor
|
|
|
*RETAINING WALLS ONLY*A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 4/15/2015 | | |
|
|
|
|
Plan assigned to (JG) | 4/13/2015 | 4/13/2015 | 4/15/2015 | | PASS |
Javier Guzman
|
|
|
Plan mod retaining wall
|
Routing - PLAN CHECK | 4/13/2015 | | 4/15/2015 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 4/15/2015 | | DONE |
|
|
|
called office- left message with the receptionist- plan mod ready for pick up and fees due
|
CHANGE STATUS TO (ISS) | | | 4/15/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/15/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/15/2015 | | DONE |
|
|
|
DO NOT RE-ISSUE PLAN MOD.
|
Routing - PLANNING | 4/13/2015 | | 4/14/2015 | | PASS |
Colleen T Carroll
|
|
|
Retaining walls cannot exceed 3' in heigh in 20' frontyard setback
|
Routing PW Grading-Hillside | 4/13/2015 | | 4/13/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan Modification Accepted | | | 4/13/2015 | | DONE |
|
|
|
received three copies of sheet GR-1.0 and engineering calcs, and one copy of soil & foundation evaluation- gave to Javier
|
BLD-Footing | 3/31/2015 | 3/31/2015 | 4/1/2015 | P | PASS |
Dave Hannah
|
|
|
JR// pour time is 4pm// please call before Phone #: ###-####
|
BLD-Foundation | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Dave Hannah
|
|
|
basement walls ok to pour
|
BLD-Footing | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | CANC |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | PART |
Dave Hannah
|
|
|
JR Phone #: ###-#### basement section ok to place
|
PubWorks Subgrade Approval | 3/17/2015 | 3/17/2015 | 3/17/2015 | | DONE |
Jason C. Taylor
|
|
|
*ENTIRE STRUCTURE ONLY*A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 2/17/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/17/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/17/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/17/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | | 1/12/2015 | 2/13/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 1/28 W L2 Hillside** pending planning, email also lineardesign@yahoo.com if revisions needed
|
Routing - PLAN CHECK | 1/26/2015 | | 2/13/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 2/13/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 2/13/2015 | | 2/13/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Plan resubmittals received | | | 2/10/2015 | | DONE |
|
|
|
received two full sets of plans-plus 2 sets engineered calcs- put with plans on Javier's desk
|
Routing - PLANNING | 1/26/2015 | | 1/28/2015 | | FAIL |
Colleen T Carroll
|
|
|
Eave can not extend more than 2 feet into rear setback.
|
Routing - Erosion and Sediment | 1/28/2015 | | 1/28/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE).
WUI Zone A, Class A Roof, Permit for the construction of a new 2838 sq. ft., two story (first story 103 sq. ft., second story 2728 sq. ft.) single family dwelling with 3 bedrooms, 4 bathrooms, approximately 520 sq. ft. of covered patio/porch and a 1285 sq. ft. attached garage per the approved plans,
|
Routing - PUBLIC WORKS | 1/27/2015 | | 1/27/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 1/26/2015 | | 1/27/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | | | 1/26/2015 | | FAIL |
Javier Guzman
|
|
|
emailed applicant review report
|
1st review completed | | | 1/26/2015 | | FAIL |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 1/23/2015 | | DONE |
|
|
|
Two copies of A0.0, A1.0, A2.0, A3.0, S1.0, S2.0, S3.0, S4.0, E1.0, ESC-1.0 and three copies of GR-1.0
|
Routing - MECHANICAL | 1/20/2015 | | 1/20/2015 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 1/14/2015 | 1/12/2015 | 1/14/2015 | | PASS |
Scott Arellano
|
|
|
This structure has been approved for Fire Department Vehicle Access.
|
Routing - Erosion and Sediment | 1/14/2015 | | 1/14/2015 | | FAIL |
Evan Jenkins
|
|
|
Failed. ESC Site Map does not match grading/building plans.
Resubmit 2 copies of ammended/corrected ESC Site Maps for Review and Approval
|
Routing - MECHANICAL | 1/13/2015 | | 1/14/2015 | | FAIL |
Troy James
|
|
|
Emailed corrections
|
Routing - PLANNING | 1/13/2015 | | 1/13/2015 | | FAIL |
Colleen T Carroll
|
|
|
Retaining wall is over 6' in side yard setback, this would require a varaince.
|
Routing - Addressing | 1/12/2015 | | 1/13/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 1/13/2015 | | 1/13/2015 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Hillside
|
Routing PW Grading-Hillside | | | 1/13/2015 | | FAIL |
Jason C. Taylor
|
|
|
Need retaining wall engineering and revised grading plans prior to approval. Jason Taylor ###-####.
|
Intake Approval | | | 1/12/2015 | | FAIL |
|
|
|
Missing stamped foundation, attic/crawl access & 3rd grading set
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/12/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/12/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/12/2015 | | | |
|
|
|
|