Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-00076
StatusFinaled
Name ESI
Site Address 2755 S BEVERLY ST Unit: 101
Project NameZippy - Building #1 - Ste#101
Customer Number 
ePlanReviewYes
Description
(Zippy Shell – Building #1 - North end - Ste# 101) Permit is to build out a 5,000 square foot new tenant space in an existing 19,600 square foot shell building (shell constructed under BLD14-01651). Approval contingent upon adhering to the approved plans on file. Note: envelope was approved with the shell permit. Work to include: construction of new interior partition walls, installation of a family assist accessible restroom, new plumbing, new electrical, new mechanical, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/14/20156/17/2015 DONE
This permit finaled on the web by Penny Dennis
Second Notice 5/14/20156/9/2015 DONE
sent in mail
First Notice 4/6/20155/4/2015 DONE
Case Summary (BLD)  3/30/2015 DONE
BLD-Final3/26/20153/27/20153/27/2015APASS
DetailsPhil Shearer
Curtis Phone #: ###-####
FIRE-Final Inspection3/26/20153/27/20153/27/2015APASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  3/27/2015 DONE
FIRE-Final Inspection3/23/20153/24/20153/24/2015ACANC
DetailsTroy Cobbley
Curtis Phone #: ###-####
BLD-Framing/Rough-in3/6/20153/9/20153/10/2015APASS
DetailsPhil Shearer
Zippy Shell office/demising wall Phone #: ###-#### Inspection requested via web by Murph Naughtin
BLD-Framing/Rough-in3/3/20153/4/20153/4/2015ANR
DetailsPhil Shearer
Zippy Shell wall framing Phone #: ###-#### Inspection requested via web by Murph Naughtin
Permit Ready to Issue  2/13/2015 DONE
Issue PAID IN FULL permit  2/13/2015 DONE
Print Occupancy Form  2/13/2015 DONE
Plan assigned to (TLW)1/22/2015 2/4/2015 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK1/22/2015 2/4/2015 PASS
DetailsTim L. Woodard
1st review completed  2/4/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/4/2015 DONE
Permit Ready to Issue  2/4/2015 DONE
DetailsCandy A. Nichols
need GC & rev cert of val
All requirements met///cdp 2/12/15
Routing - FIRE1/22/20151/22/20151/27/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - PUBLIC WORKS1/22/2015 1/23/2015 PASS
DetailsJennifer Bruner
Intake Approval  1/22/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing1/22/2015 1/22/2015 PASS
DetailsEmily Dixon
Application received  1/13/2015 DONE
Application submitted via PDS Online on Jan 13 2015 10:39AM
Intake Approval  1/13/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please name the drawings as per the conventional naming standards, such at G.01 Cover sheet, A1.0 Floor Plan.