Print Statement | | | 7/13/2015 | | DONE |
|
|
|
|
Second Notice | | 6/20/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
First Notice | 6/8/2015 | 6/8/2015 | 6/10/2015 | | DONE |
Mike Jordan
|
|
|
Mailed out 6-10-15
|
BLD-Final | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Jim Page
|
|
|
Life safety passed/complete
|
CHANGE STATUS TO (ISS) | | | 6/5/2015 | | DONE |
|
|
|
was finaled by mistake
|
FIRE-Final Inspection | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | CANC |
Troy Cobbley
|
|
|
cancel per Mike Phone #: ###-####
|
FIRE-Final Inspection | 5/12/2015 | 5/13/2015 | 5/13/2015 | A | FAIL |
Troy Cobbley
|
|
|
I met Mike at the project site and discussed the fire alarm requirements.
|
FIRE-Final Inspection | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | CANC |
Troy Cobbley
|
|
|
Need a fire alarm permit prior to the life safety inspection for the new Consulting Room at the Pharmacy and the two disable duct smoke detectors on the Mezzanine.
|
BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 | P | NR |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | NR |
Mike Jordan
|
|
|
MIKE Phone #: ###-####. Needs fire/life/safety finals.
|
BLD-Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | NR |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | FAIL |
Troy Cobbley
|
|
|
life safety ok to final when Pharmacy Consult Room is provided with fire alarm notification coverage.
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. INteior steel stud framing for phase 3 soffits.
|
CHANGE STATUS TO (ISS) | | | 2/24/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/18/2015 | 2/18/2015 | 2/19/2015 | P | PART |
Troy Cobbley
|
|
|
Life safety in new Deli area passed. Area ok to occupy
|
BLD-Framing/Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. ceiling grid phase 1 ok.
|
Case Summary (BLD) | | | 2/18/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/18/2015 | | DONE |
|
|
|
DO NOT ISSUE PLAN MOD. Need signature on application
|
Telephone call | | | 2/18/2015 | | DONE |
Christina Prado
|
|
|
Called Lee to advise permit is ready and gave fees due
|
Routing - PLAN CHECK | 2/13/2015 | | 2/18/2015 | | PASS |
Carl D Madsen
|
|
|
|
BLD-Framing/Rough-in | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. phase 2 soffit ok. Noted that contractorhas stated that engineer has reviewed the in place work for phase 1 and has accepted the in place work. Still awaiting for letter.
|
Routing - PLANNING | 2/13/2015 | | 2/13/2015 | | PASS |
Sarah Schafer
|
|
|
Approved per CZC15-00013.
|
Plan resubmittals received | | | 2/12/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of revised sheets marked A-1; Plans stamped and taken to Carl Madsen for review
|
Routing - PLAN CHECK | 2/9/2015 | | 2/9/2015 | | FAIL |
Carl D Madsen
|
|
|
No structural plan sheets or elevaions were provided. E-Mailed Lee Young requesting additional plan sheets. CDM
|
BLD-Framing/Rough-in | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PART |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Interior steel stud framing for half wall and new restroom. Aslo inspected framing for new soffit. Soffit no built per approved plans, provide additional deatails and engineering calcs showing that bottom chords of existing trusses will supprt the additional load.
|
Plan Modification Accepted | | | 2/5/2015 | | DONE |
Candy A. Nichols
|
|
|
received plan mods: 2 apps, 3 struc calcs & 3 each sheet G0.1, A1.1, A2.1, A8.1, A8.2 took to John M to see if it needs to go to off site structural
|
Routing - PLAN CHECK | 1/30/2015 | | 2/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Permit Ready to Issue | | | 2/4/2015 | | DONE |
Candy A. Nichols
|
|
|
need GC Form and rev cert of val
|
Telephone call | | | 2/4/2015 | | DONE |
|
|
|
called Lee- left message that we need GC form and Certificate of value- then we will be able to add the fees and the permit can be issued
|
Issue PAID IN FULL permit | | | 2/4/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 1/27/2015 | | 1/30/2015 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 1/22/2015 | 1/22/2015 | 1/27/2015 | | PASS |
Scott Arellano
|
|
|
Attached Fire Comments to plans.
|
1st review completed | | | 1/27/2015 | | FAIL |
|
|
|
Failed mechanical.
|
Routing - PLAN CHECK | 1/27/2015 | | 1/27/2015 | | PEND |
Carl D Madsen
|
|
|
Just waiting on Mechanical Signoff. TLW
|
Plan resubmittals received | | | 1/27/2015 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plan sheets marked A8.1, one response letter, one set each of rotisserie oven calcs, Pressure fryer calcs & Fire Barrier duct wrap; Plans stamped and taken to Carl Madsen for review
|
Routing - PLAN CHECK | 1/22/2015 | | 1/22/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 1/20/2015 | | 1/22/2015 | | FAIL |
Troy James
|
|
|
emailed corrections to the architect
|
Routing PW Sewer Rating | 1/15/2015 | | 1/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 1/14/2015 | | 1/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 1/14/2015 | | 1/14/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/13/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/13/2015 | | DONE |
|
|
|
|
Intake Approval | | | 1/13/2015 | | |
|
|
|
|
Application received | | 1/13/2015 | | | |
|
|
|
|