Plan resubmittals received | | | 1/31/2020 | | DONE |
|
|
|
three copies of plan sheets A0.0, A1.0, A2.0, A2.1, A3.0, A3.1, A3.2, A3.3, A3.4, A4.0, A4.0.1, A4.1, A4.2, A4.3, A5.0, A10.0, A11.0, A11.1 and A11.2. Taken to Carl W
|
Route to Impact Fee Review | 1/29/2020 | 2/1/2020 | 1/30/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - Design Review | 1/29/2020 | | 1/29/2020 | | FAIL |
KayCee Babb
|
|
|
DRH20-00023 has been submitted, but is still under review. After decision, there will be a ten day appeal period.
|
Permanent Occupancy | | | 6/1/2016 | | DONE |
|
|
|
|
BLD-Final | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | NR |
Dave Hannah
|
|
|
Please call ahead for access - Mike Phone #: ###-#### needs fire final
|
FIRE-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Jim Page
|
|
|
No fire spinklers, no fire alarms, fire extinguisher will be installed in common area entry for suites 101 and 201, will verify extinguisher install at final life fire safety inspection for suite 201. Final life fire safety inspection for suite 101 passed/complete.
|
BLD-Framing/Rough-in | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PASS |
Jim Sly
|
|
|
Call 15mins before to meet // Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
FIRE-Final Inspection | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | DONE |
Jim Page
|
|
|
Not a final life fire safety inspection, inspection request for rough to cover on rock-wool installation and fire caulk penetrations. No fire sprinklers, no fire alarms. Life fire safety inspection will need to be performed at project completion.
|
BLD-Conference | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PART |
Mike Jordan
|
|
|
would like call ahead; Kevin Phone #: ###-####. Reviewed 1hr. assembly, fireblock all furouts and furdowns. Will call for reinspection when complete.
|
CHANGE STATUS TO (ISS) | | | 12/3/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 11/18/2015 | 11/18/2015 | 11/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/18/2015 | | 11/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 11/27/2015 | | DONE |
|
|
|
Plan Mod Fee under BLD15-00085. DO NOT RE ISSUE PLAN MODS; PERMITS BLD15-00085-BLD00100 (16 PERMITS IN ALL)
|
Plan Modification Accepted | | | 11/18/2015 | | DONE |
|
|
|
Provided through penetration detail sheets A11.0, A11.1, A11.2. Provided additional information for intumescent paint to be used at first flppor north bedroom ceilings to provide 1-hour floor/ceiling construction between first and second floor dwelling units. Two copies of sheet A0.0, A3.1, A11.0, A11.1 and A11.2. One copie of letter to Carl M, one copy of ForceFiel FireGuard E-84 intumescent paint packet and one copy of FireFree Coatings Inc Packet. Plans taken to Carl M
|
BLD-Framing/Rough-in | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | FAIL |
Jim Storey
|
|
|
Kevin-please call to meet Phone #: ###-#### resubmit for assembly on floor above back porch not protected/ patch exsiting ceilling/ fire collor and fire stop ceilling.
|
BLD-Framing/Rough-in | 9/16/2015 | 9/17/2015 | 9/16/2015 | A | CANC |
Phil Shearer
|
|
|
|
BLD-Framing/Rough-in | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | DEFR |
Phil Shearer
|
|
|
Out of time
|
BLD-Conference | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Tony Young
|
|
|
kevin Phone #: ###-####,, general ?s,, fire blocks
|
Permit Ready to Issue | | | 2/17/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/17/2015 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2015 | | DONE |
Christina Prado
|
|
|
Called John to advise review is complete
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
|
|
|
Need GC Form and Revised Value
|
Print Occupancy Form | | | 2/12/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | | 1/14/2015 | 2/11/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | | | 2/11/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/11/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/11/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 2/2/2015 | | 2/2/2015 | | PASS |
Troy James
|
|
|
see bld15-00085 for acca reports
|
Plan resubmittals received | | | 1/29/2015 | | DONE |
Christina Prado
|
|
|
Received one set of upper floor manual J calcs and one set of lower floor manual j calcs; calcs stamped and taken to Carl M for review
|
Routing - MECHANICAL | | | 1/23/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 1/20/2015 | | 1/21/2015 | | PASS |
Jason C. Taylor
|
|
|
Addresses all updated. Jason Taylor ###-####
|
Routing - PUBLIC WORKS | 1/21/2015 | | 1/21/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 1/21/2015 | | 1/21/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 1/20/2015 | | PASS |
Carl D Madsen
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/14/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/14/2015 | | FAIL |
Carl D Madsen
|
|
|
addressing corrections
|
Recd Pcfee & Taken To Pln CK | | | 1/14/2015 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 6/11/2016 | | | |
|
|
|
|
First Notice | 5/31/2016 | 5/31/2016 | | | |
Dave Hannah
|
|
|
|
Application received | | 1/14/2015 | | | |
|
|
|
|