Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-00088
StatusUnder Review
Name STATE STREET APARTMENT ASSOCIATES
Site Address 1326 W STATE ST STE 201
Project NameState Street Apartments
Customer Number 
ePlanReviewNo
Description
(State Street Apartments - APT 201) ""PLAN MODIFICATION TO ADDRESS ACTUAL CONDITIONS OF THE PORCH AREAS THAT HAD BEEN PREVIOUSLY CONVERTED TO BEDROOMS. THE CEILNS OF THE CONVERTED AREAS ARE TO BE COATED WITH AN INTUMESCENT MATERIAL PER THE ATTACHED DOCUMENTS. THESE PLAN ALSO PROVIDE DETAILS ADDRESSING PENETRATIONS OF RATED ASSEMBLIES. PLUMBING THAT WAS PREVIOULSY CAST IRON AND GALVANIZED HAS BEEN REPLACED WITH PEX AND ABS REQUIRING THESE PENETRATIONS TO BE APPROPRIATLY FIRESTOPPED. For interior improvements limited to the kitchen and bathroom areas with work to include the removal and installation of new kitchen and bathroom cabinets and fixtures, installation of new applicances as well as kitchen and bathroom plumbing fixtures. The drop ceiling area below the kitchen and bathroom areas will be removed and replaced with a new suspended gypsum board ceiling system per the attached documents. Any openings created or exposed in the existing floor/ceiling assembly shall be repaired and/or fire caulked to maintain the existing assembly. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan resubmittals received  1/31/2020 DONE
three copies of plan sheets A0.0, A1.0, A2.0, A2.1, A3.0, A3.1, A3.2, A3.3, A3.4, A4.0, A4.0.1, A4.1, A4.2, A4.3, A5.0, A10.0, A11.0, A11.1 and A11.2. Taken to Carl W
Route to Impact Fee Review1/29/20202/1/20201/30/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - Design Review1/29/2020 1/29/2020 FAIL
DetailsKayCee Babb
DRH20-00023 has been submitted, but is still under review. After decision, there will be a ten day appeal period.
Permanent Occupancy  10/11/2016 DONE
BLD-Final10/10/201610/10/201610/10/2016PPASS
DetailsDave Hannah
Mike Phone #: ###-####
FIRE-Final Inspection10/6/201610/7/201610/7/2016APASS
DetailsJim Page
No fire sprinklers, smoke detectors are stand-alone and not monitored, fire extinguisher is in common area with a current inspection tag. Final life fire safety inspection passed/complete.
BLD-Aging Inspection6/2/20166/2/20166/3/2016 PEND
DetailsTony Young
BLD-Aging Inspection6/1/20166/1/20166/2/2016 PEND
DetailsTony Young
BLD-Framing/Rough-in1/19/20161/19/20161/19/2016PPASS
DetailsTony Young
Kevin Phone #: ###-####
FIRE-Final Inspection1/19/20161/19/20161/19/2016PDONE
DetailsJim Page
Not a final life fire safety inspection, inspection request for rough to cover on rock-wool installation and fire caulk penetrations. No fire sprinklers, no fire alarms. Life fire safety inspection will need to be performed at project completion.
BLD-Foundation1/4/20161/5/20161/5/2016ACANC
DetailsTony Young
Matt Phone #: ###-####,, wrong permit
CHANGE STATUS TO (ISS)  12/3/2015 DONE
Plan assigned to (CDM)11/18/201511/18/201511/27/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK11/18/2015 11/27/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/27/2015 DONE
Plan Modification Accepted  11/18/2015 DONE
Provided through penetration detail sheets A11.0, A11.1, A11.2. Provided additional information for intumescent paint to be used at first flppor north bedroom ceilings to provide 1-hour floor/ceiling construction between first and second floor dwelling units. Two copies of sheet A0.0, A3.1, A11.0, A11.1 and A11.2. One copie of letter to Carl M, one copy of ForceFiel FireGuard E-84 intumescent paint packet and one copy of FireFree Coatings Inc Packet. Plans taken to Carl M
Permit Ready to Issue  2/17/2015 DONE
Issue PAID IN FULL permit  2/17/2015 DONE
Telephone call  2/13/2015 DONE
DetailsChristina Prado
Called John to advise review is complete
Permit Ready to Issue  2/12/2015 DONE
Need GC Form and Revised Value
Print Occupancy Form  2/12/2015 DONE
Plan assigned to (CDM) 1/14/20152/11/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK  2/11/2015 PASS
DetailsCarl D Madsen
1st review completed  2/11/2015 DONE
Case Summary (BLD)  2/11/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/11/2015 DONE
Routing - MECHANICAL2/2/2015 2/2/2015 PASS
DetailsTroy James
see bld15-00085 for acca reports
Plan resubmittals received  1/29/2015 DONE
DetailsChristina Prado
Received one set of upper floor manual J calcs and one set of lower floor manual j calcs; calcs stamped and taken to Carl M for review
Routing - MECHANICAL1/21/2015 1/23/2015 FAIL
DetailsTroy James
Routing - Addressing1/20/2015 1/21/2015 PASS
DetailsJason C. Taylor
Addresses all updated. Jason Taylor ###-####
Routing - PUBLIC WORKS1/21/2015 1/21/2015 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating1/21/2015 1/21/2015 PASS
DetailsConnie Baumgartner
Intake Approval  1/20/2015 PASS
DetailsCarl D Madsen
Plans ACCEPTED BY PLAN TECH  1/14/2015 DONE
DetailsChristina Prado
Intake Approval  1/14/2015 FAIL
DetailsCarl D Madsen
addressing corrections
Recd Pcfee & Taken To Pln CK  1/14/2015 DONE
DetailsChristina Prado
First Notice 10/21/2016   
Application received 1/14/2015