BLD-Conference | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PART |
Tony Young
|
|
|
Screened- vacant- was inform that inspection is up to inspectors discretion-Leo Phone #: ###-####// ?s on fire seperation,, hard lid to main structure, seal with fire caulk, also will do dropped hard lid
|
Plan resubmittals received | | | 1/31/2020 | | DONE |
|
|
|
three copies of plan sheets A0.0, A1.0, A2.0, A2.1, A3.0, A3.1, A3.2, A3.3, A3.4, A4.0, A4.0.1, A4.1, A4.2, A4.3, A5.0, A10.0, A11.0, A11.1 and A11.2. Taken to Carl W
|
Routing - Design Review | 1/29/2020 | | 1/29/2020 | | FAIL |
KayCee Babb
|
|
|
DRH20-00023 has been submitted, but is still under review. After decision, there will be a ten day appeal period.
|
Route to Impact Fee Review | 1/16/2020 | 1/19/2020 | 1/17/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 1/16/2020 | | DONE |
|
|
|
Plan mod - Add mezzanie level bedroom to units #200, 202, 203, 204, 205, 206. Revise kitchen and bathroom design units #100, 102, 103, 104, 105, 106. Add new north emtry to units #102, 103, 104, 105, 106. Revise kitchen and bathroom designs in units #200,202, 203 204, 205, 206 Add new north entry to units #202,203, 204, 205, 206
|
BLD-Aging Inspection | 4/13/2018 | 4/13/2018 | 4/19/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/12/2018 | 4/12/2018 | 4/19/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PART |
Jim Storey
|
|
|
Leo Phone #: ###-#### tennent wall ok to cover
|
BLD - Request for Extension | 7/18/2017 | 7/19/2017 | 7/18/2017 | A | PASS |
Tony Young
|
|
|
Just starting these appartments, please extend permits - Lio Phone #: ###-####
|
Plan assigned to (CDM) | 11/18/2015 | 11/18/2015 | 12/30/2015 | | DONE |
Carl D Madsen
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/3/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 11/27/2015 | | DONE |
|
|
|
Plan Mod Fee under BLD15-00085. DO NOT RE ISSUE PLAN MODS; PERMITS BLD15-00085-BLD00100 (16 PERMITS IN ALL)
|
Plan Modification Accepted | | | 11/18/2015 | | DONE |
|
|
|
Provided through penetration detail sheets A11.0, A11.1, A11.2. Provided additional information for intumescent paint to be used at first flppor north bedroom ceilings to provide 1-hour floor/ceiling construction between first and second floor dwelling units. Two copies of sheet A0.0, A3.1, A11.0, A11.1 and A11.2. One copie of letter to Carl M, one copy of ForceFiel FireGuard E-84 intumescent paint packet and one copy of FireFree Coatings Inc Packet. Plans taken to Carl M
|
Routing - Design Review | 11/9/2015 | | 11/9/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00434.
|
Routing - PLANNING | 11/9/2015 | | 11/9/2015 | | PASS |
Susan Riggs
|
|
|
ok per CUP15-00086.
|
Permit Ready to Issue | | | 2/17/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/17/2015 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2015 | | DONE |
Christina Prado
|
|
|
Called John to advise review is complete
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
|
|
|
Need GC Form and Revised Value
|
Print Occupancy Form | | | 2/12/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | | 1/14/2015 | 2/11/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | | | 2/11/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/11/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/11/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 2/2/2015 | | 2/2/2015 | | PASS |
Troy James
|
|
|
see bld15-00085 for acca reports
|
Plan resubmittals received | | | 1/29/2015 | | DONE |
Christina Prado
|
|
|
Received one set of upper floor manual J calcs and one set of lower floor manual j calcs; calcs stamped and taken to Carl M for review
|
Routing - MECHANICAL | 1/21/2015 | | 1/23/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 1/20/2015 | | 1/21/2015 | | PASS |
Jason C. Taylor
|
|
|
Addresses all updated. Jason Taylor ###-####
|
Routing - PUBLIC WORKS | 1/21/2015 | | 1/21/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 1/21/2015 | | 1/21/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 1/20/2015 | | PASS |
Carl D Madsen
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/14/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/14/2015 | | FAIL |
Carl D Madsen
|
|
|
addressing corrections
|
Recd Pcfee & Taken To Pln CK | | | 1/14/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/14/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | 11/18/2015 | | | | |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 1/16/2020 | | | | |
Carl D Madsen
|
|
|
|