Telephone call | | | 7/1/2015 | | DONE |
|
|
|
Left a message with Nick asking if Mechanical work was done and they didn't pull the permit or where the mechanical value came from.
|
Telephone call | | | 7/1/2015 | | DONE |
|
|
|
Mechanical work was so minor that a permit wasn't needed. Spoke with Christina Prado
|
First Notice | 5/1/2015 | 5/1/2015 | 6/10/2015 | | DONE |
Jim Sly
|
|
|
Mailed out 6-10-15
|
BLD-Final | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Jim Sly
|
|
|
Rodney Phone ###-####
|
DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Per Lee the fire alarm is not required to be extended into the new space
|
BLD-Final | 4/27/2015 | 5/1/2015 | 5/1/2015 | A | NR |
Jim Sly
|
|
|
Rodney Phone #: ###-#### Need Fire......
|
BLD-Ceiling Grid Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 | P | PASS |
Jim Sly
|
|
|
Rodney Phone #: ###-####
|
BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | PASS |
Jim Sly
|
|
|
Rodney Phone #: ###-####
|
Inspection Record Card- Bld | | | 4/27/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/27/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 2/18/2015 | 2/18/2015 | 2/19/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/18/2015 | | 2/19/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/19/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/19/2015 | | DONE |
|
|
|
NEED GC form and Cerificate of Value. ALL REQUIREMENTS MET blh 3/27/15
|
Routing - Addressing | 2/18/2015 | | 2/18/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 2/18/2015 | | 2/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 2/18/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 1/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 15 2015 2:29PM
|
Intake Approval | | | 1/15/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1. Please upload the completed 518 checklist. The pre screen will be completed once this is recieved.
2. Please submit the 304 design professional form
3. Please rename the drawing files to meet the conventional naming standards. A.1- Cover Sheet, A.2 Floor Plan for example.
4. Please refer to the electronic submittal standards for the required stamping area required to be provided on the plans.
|