Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-00110
StatusFinaled
Name HORIZON RETAIL CONSTRUCTION INC
Site Address 8100 W FAIRVIEW AVE
Project NameWalgreens -Strore #4942
Customer Number 
ePlanReviewYes
Description
(WALGREENS #4942) For tenant improvements to an existing 14,418 sq. ft. Wallgreens with work to include the construction of a new 96 sq. ft. pharmacy consulting room per the approved plans and any notations. This is a fully sprinklered building. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  7/1/2015 DONE
Left a message with Nick asking if Mechanical work was done and they didn't pull the permit or where the mechanical value came from.
Telephone call  7/1/2015 DONE
Mechanical work was so minor that a permit wasn't needed. Spoke with Christina Prado
First Notice5/1/20155/1/20156/10/2015 DONE
DetailsJim Sly
Mailed out 6-10-15
BLD-Final5/1/20155/1/20155/1/2015PPASS
DetailsJim Sly
Rodney Phone ###-####
DOC - Permit Finaled5/1/20155/1/20155/1/2015PPASS
DetailsJim Sly
FIRE-Final Inspection5/1/20155/1/20155/1/2015PPASS
DetailsTroy Cobbley
life safety passed. Per Lee the fire alarm is not required to be extended into the new space
BLD-Final4/27/20155/1/20155/1/2015ANR
DetailsJim Sly
Rodney Phone #: ###-####
Need Fire......
BLD-Ceiling Grid Inspection4/29/20154/29/20154/29/2015PPASS
DetailsJim Sly
Rodney Phone #: ###-####
BLD-Framing/Rough-in4/27/20154/28/20154/28/2015APASS
DetailsJim Sly
Rodney Phone #: ###-####
Inspection Record Card- Bld  4/27/2015 DONE
Issue PAID IN FULL permit  4/27/2015 DONE
Plan assigned to (CDM)2/18/20152/18/20152/19/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK2/18/2015 2/19/2015 PASS
DetailsCarl D Madsen
1st review completed  2/19/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/19/2015 DONE
Permit Ready to Issue  2/19/2015 DONE
NEED GC form and Cerificate of Value. ALL REQUIREMENTS MET blh 3/27/15
Routing - Addressing2/18/2015 2/18/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS2/18/2015 2/18/2015 PASS
DetailsJennifer Bruner
Intake Approval  2/18/2015 PASS
DetailsAdele J Schaffeld-Griffin
Application received  1/15/2015 DONE
Application submitted via PDS Online on Jan 15 2015 2:29PM
Intake Approval  1/15/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1. Please upload the completed 518 checklist. The pre screen will be completed once this is recieved.
2. Please submit the 304 design professional form
3. Please rename the drawing files to meet the conventional naming standards. A.1- Cover Sheet, A.2 Floor Plan for example.
4. Please refer to the electronic submittal standards for the required stamping area required to be provided on the plans.