Permanent Occupancy | | | 2/6/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 2/3/2015 | 2/4/2015 | 2/4/2015 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-#### OK for Perm Occ/.
|
FIRE-Final Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 1/27/2015 | 1/29/2015 | 1/28/2015 | P | NR |
Jim Sly
|
|
|
John-please call 1 hr prior to meet Phone #: 724-185 Called Contr. left Mssg. NR Need fire final prior to calling for Structural final.
|
FIRE-Final Inspection | 1/27/2015 | 1/28/2015 | 1/28/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguishers and then mount one upstairs and one in the basement. Remove the thumbturn deadbolt from the east side main level exit door and provide single action as discussed. Remove the dead bolt from the door in the basement at the south end. Provide exit sign on the interior main level secondary exit as per the approved plans. Repair the basement emergency light.
|
Plan assigned to (AJS) | 1/15/2015 | 1/15/2015 | 1/27/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed owner submitting revised floor plan 1/23/15
|
Case Summary (BLD) | | | 1/27/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/27/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/27/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 1/26/2015 | | DONE |
Christina Prado
|
|
|
Received one revised copy of Basement & Main floor plans; Taken to Adele for review
|
Routing - FIRE | 1/20/2015 | 1/20/2015 | 1/21/2015 | | PASS |
Scott Arellano
|
|
|
Plans are approved for inspection with attached General comments to plans. Any questions regarding clarification of egress provisions, new construction, or red lined annotations shall be directed the IBC plan reviewer (Adele Schaffeld-Griffin) at ###-####.
|
1st review completed | | | 1/21/2015 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 1/20/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PUBLIC WORKS | 1/15/2015 | | 1/20/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 1/20/2015 | | 1/20/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 1/20/2015 | | 1/20/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 1/20/2015 | | 1/20/2015 | | PASS |
Terry Alber
|
|
|
|
Routing - Design Review | 1/20/2015 | | 1/20/2015 | | PASS |
Sarah Schafer
|
|
|
Addition of exterior door into parking area approved on building permit.
|
Routing - Addressing | 1/15/2015 | | 1/16/2015 | | PASS |
Jason C. Taylor
|
|
|
|
First Notice | | 2/16/2015 | | | |
|
|
|
|
Application received | | 1/15/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | 1/21/2015 | | | | |
|
|
|
|