Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-00137
StatusFinaled
Name U S TRUST CONSTRUCTION LLC
Site Address 312 S 3RD ST
Project NameGeorges Cycle
Customer Number 
ePlanReviewYes
Description
(GEORGE'S CYCLE)Mechanical drawings submitted with structrual engineering. **ajs** 10/6/15 Conversion of an existing auto parts warehouse and retail building into a bicycle retail shop and warehouse. This is a partial change of occupancy 15,611 sq ft on the main level and 7,735 sq ft of existing basement storage. . The Work to include exterior modifications as shown on approved plans. New opening cut in existing slab to relocate the stairs from the basement to meet the required separation, new accessible route, new nonbearing interior partition walls. This building will have a fire sprinkler system installed as part of this project to remove the existing fire wall. The site work taking place in within ACHD right of way. The mechanical design and equipment is a deferred submittal. . This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/8/2016 DONE
Second Notice 4/22/20165/11/2016 DONE
Mailed 5-12-16
First Notice 4/11/20164/12/2016 DONE
Mailed 4-13-16
Zoning Approval4/1/20164/1/20164/1/2016 PASS
DetailsJosh Wilson
Permanent Occupancy  4/1/2016 DONE
BLD-Aging Inspection3/16/20163/16/20163/17/2016 PEND
DetailsDave Hannah
Temporary Occupancy1/27/20164/26/20161/27/2016 DONE
DetailsKristal Soland
Zoning Approval Temp1/25/20161/25/20161/25/2016 PASS
DetailsJosh Wilson
90 day temp ok for completion of building exterior
Print Occupancy Form  1/22/2016 DONE
Print Occupancy Form  1/22/2016 DONE
BLD-Final1/15/20161/19/20161/19/2016PPASS
DetailsDave Hannah
Andy Phone #: ###-####
FIRE-Final Inspection1/15/20161/19/20161/19/2016APASS
DetailsJim Page
Previously noted items complete. Fire sprinkler inspections complete, fire alarm inspections complete. Life fire safety passed/complete
BLD-Final12/31/20151/4/20161/4/2016APART
DetailsDave Hannah
Andy Phone #: ###-#### ok for temp occ
FIRE-Final Inspection12/11/201512/11/201512/11/2015PPART
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety inspection peformed, only item not in place for inspection is the emergency exit discharge light located in the west canopy, all other items inspected/passed, will final life fire safety when emergency egress light is installed/operational.
BLD-Ceiling Grid Inspection12/4/201512/7/201512/7/2015APASS
DetailsDave Hannah
Andy Phone #: ###-####
BLD-Framing/Rough-in11/6/201511/9/201511/9/2015APASS
DetailsDave Hannah
canopy at main entrance - Traon Phone #: ###-####
BLD-Other10/28/201510/28/201510/29/2015PPASS
DetailsDave Hannah
Andy-- inspection for rebar and metal deck Phone #: ###-####
CHANGE STATUS TO (ISS)  10/13/2015 DONE
DetailsChristina Prado
no fees due
BLD-Framing/Rough-in10/9/201510/9/201510/9/2015PPART
DetailsDave Hannah
Andy Phone #: ###-#### ramp and stairs
OVERRIDE  10/6/2015  
Plan assigned to (AJS)9/30/20159/30/201510/6/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed, Plan mod George's Cycle
Routing - PLAN CHECK10/6/2015 10/6/2015 PASS
DetailsAdele J Schaffeld-Griffin
mechanical and structral engineering for 7 new RTU units on roof
PLANS/APPL TAKEN TO FRONT DESK  10/6/2015 DONE
Permit Ready to Issue  10/6/2015 DONE
DO NOT REISSUE
Routing - PLAN CHECK10/5/2015 10/5/2015 FAIL
DetailsAdele J Schaffeld-Griffin
need calculations
Routing - PLAN CHECK10/1/2015 10/1/2015 FAIL
DetailsAdele J Schaffeld-Griffin
mechaincal plan modification failed
Plan resubmittals requested  9/30/2015 DONE
DetailsChristina Prado
Plan mod accepted to enable mechanical submittal for final approval
BLD-Framing/Rough-in9/28/20159/28/20159/28/2015PPART
DetailsJim Sly
Andy Phone #: ###-####
West wall Main flr. and Soffit above front entry....OK.
BLD-Other9/16/20159/17/20159/17/2015APASS
DetailsJim Storey
Rebar - Andy Phone #: ###-####
BLD-Framing/Rough-in8/5/20158/5/20158/6/2015PPASS
DetailsDave Hannah
andy Phone #: ###-####
BLD-Framing/Rough-in6/2/20156/2/20156/3/2015PPART
DetailsDave Hannah
Andy Phone #: ###-#### east half ok to cover
Print Occupancy Form  3/25/2015 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  3/16/2015 DONE
OVERRIDE  3/4/2015  
Plan assigned to (AJS)1/23/20151/23/20153/4/2015 PASS
DetailsAdele J Schaffeld-Griffin
2/23-Resubmittals 1st review completed Level 3 TI - ePlanReview - George's Cycles
Routing - PLAN CHECK2/23/2015 3/4/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Street Lights2/23/2015 3/4/2015 PASS
DetailsMike D Hedge
PLANS/APPL TAKEN TO FRONT DESK  3/4/2015 DONE
Permit Ready to Issue  3/4/2015 DONE
Need Res. Person for ESC
Routing - FIRE2/23/20152/23/20152/26/2015 PASS
DetailsScott Arellano
Attached plan review report to case and plans.
Routing - PUBLIC WORKS2/23/2015 2/23/2015 PASS
DetailsJennifer Bruner
1st review completed  2/12/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Solid Waste1/23/2015 2/12/2015 PASS
DetailsPeter J. McCullough
Solid Waste/Recyclong is to be stored inside the building only.
Routing - PLAN CHECK1/23/2015 2/12/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE1/23/20151/23/20151/28/2015 FAIL
DetailsScott Arellano
Emailed architect plan review report. Attached correction item and plan review report to case.
Routing - Design Review1/23/2015 1/27/2015 PASS
DetailsJosh Wilson
ok per DRH14-00449
Routing PW Street Lights1/23/2015 1/27/2015 FAIL
DetailsMike D Hedge
Working directly with electrical engineer to get drawings corrected.
Routing PW Sewer Rating1/23/2015 1/26/2015 PASS
DetailsJennifer Bruner
Routing PW Drainage1/23/2015 1/23/2015 PASS
DetailsBrian Murphy
work in achd right of way
Intake Approval  1/23/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Sheets C3.00, C4.01, C4.10 did not upload.
Form 310 statement of special inspection needs engineers stamp with seal.
Com Check needs to be in plan set and to the 2009 IECC
Intake Approval  1/23/2015 PASS
DetailsJason Blais
Prescreen approved by Adel Schaffeld-Griffin and plan review fees paid.
Pending Assignment by JCB1/23/2015 1/23/2015 DONE
DetailsJason Blais
Routing - Erosion and Sediment1/23/2015 1/23/2015 PASS
DetailsEvan Jenkins
(GEORGE'S CYCLE) Conversion of an existing auto parts warehouse and retail building into a bicycle retail shop and warehouse. Interior Demo, Demo of curb and sidewalks. installation of permeable pavers, sidewalks and curb. Regular Site Improvements
Plan Reviewer's activity  1/23/2015 DONE
DetailsJason Blais
Emailed architect to provide written verification from ACHD for any required inspection or additional impact fees due. To be provided to our Permit Counter prior to the building permit being issued.
Routing - Addressing1/23/2015 1/23/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS1/23/2015 1/23/2015 PASS
DetailsJennifer Bruner
Application received  1/20/2015 DONE
Application submitted via PDS Online on Jan 20 2015 4:18PM