Print Statement | | | 6/8/2016 | | DONE |
|
|
|
|
Second Notice | | 4/22/2016 | 5/11/2016 | | DONE |
|
|
|
Mailed 5-12-16
|
First Notice | | 4/11/2016 | 4/12/2016 | | DONE |
|
|
|
Mailed 4-13-16
|
Zoning Approval | 4/1/2016 | 4/1/2016 | 4/1/2016 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 4/1/2016 | | DONE |
|
|
|
|
BLD-Aging Inspection | 3/16/2016 | 3/16/2016 | 3/17/2016 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 1/27/2016 | 4/26/2016 | 1/27/2016 | | DONE |
Kristal Soland
|
|
|
|
Zoning Approval Temp | 1/25/2016 | 1/25/2016 | 1/25/2016 | | PASS |
Josh Wilson
|
|
|
90 day temp ok for completion of building exterior
|
Print Occupancy Form | | | 1/22/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/22/2016 | | DONE |
|
|
|
|
BLD-Final | 1/15/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
FIRE-Final Inspection | 1/15/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items complete. Fire sprinkler inspections complete, fire alarm inspections complete. Life fire safety passed/complete
|
BLD-Final | 12/31/2015 | 1/4/2016 | 1/4/2016 | A | PART |
Dave Hannah
|
|
|
Andy Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety inspection peformed, only item not in place for inspection is the emergency exit discharge light located in the west canopy, all other items inspected/passed, will final life fire safety when emergency egress light is installed/operational.
|
BLD-Ceiling Grid Inspection | 12/4/2015 | 12/7/2015 | 12/7/2015 | A | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 11/6/2015 | 11/9/2015 | 11/9/2015 | A | PASS |
Dave Hannah
|
|
|
canopy at main entrance - Traon Phone #: ###-####
|
BLD-Other | 10/28/2015 | 10/28/2015 | 10/29/2015 | P | PASS |
Dave Hannah
|
|
|
Andy-- inspection for rebar and metal deck Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/13/2015 | | DONE |
Christina Prado
|
|
|
no fees due
|
BLD-Framing/Rough-in | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PART |
Dave Hannah
|
|
|
Andy Phone #: ###-#### ramp and stairs
|
OVERRIDE | | | 10/6/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 9/30/2015 | 9/30/2015 | 10/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed, Plan mod George's Cycle
|
Routing - PLAN CHECK | 10/6/2015 | | 10/6/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
mechanical and structral engineering for 7 new RTU units on roof
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2015 | | DONE |
|
|
|
DO NOT REISSUE
|
Routing - PLAN CHECK | 10/5/2015 | | 10/5/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
need calculations
|
Routing - PLAN CHECK | 10/1/2015 | | 10/1/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
mechaincal plan modification failed
|
Plan resubmittals requested | | | 9/30/2015 | | DONE |
Christina Prado
|
|
|
Plan mod accepted to enable mechanical submittal for final approval
|
BLD-Framing/Rough-in | 9/28/2015 | 9/28/2015 | 9/28/2015 | P | PART |
Jim Sly
|
|
|
Andy Phone #: ###-#### West wall Main flr. and Soffit above front entry....OK.
|
BLD-Other | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Jim Storey
|
|
|
Rebar - Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 8/5/2015 | 8/5/2015 | 8/6/2015 | P | PASS |
Dave Hannah
|
|
|
andy Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | PART |
Dave Hannah
|
|
|
Andy Phone #: ###-#### east half ok to cover
|
Print Occupancy Form | | | 3/25/2015 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 3/16/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 3/4/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 1/23/2015 | 1/23/2015 | 3/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
2/23-Resubmittals 1st review completed Level 3 TI - ePlanReview - George's Cycles
|
Routing - PLAN CHECK | 2/23/2015 | | 3/4/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Street Lights | 2/23/2015 | | 3/4/2015 | | PASS |
Mike D Hedge
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2015 | | DONE |
|
|
|
Need Res. Person for ESC
|
Routing - FIRE | 2/23/2015 | 2/23/2015 | 2/26/2015 | | PASS |
Scott Arellano
|
|
|
Attached plan review report to case and plans.
|
Routing - PUBLIC WORKS | 2/23/2015 | | 2/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
1st review completed | | | 2/12/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 1/23/2015 | | 2/12/2015 | | PASS |
Peter J. McCullough
|
|
|
Solid Waste/Recyclong is to be stored inside the building only.
|
Routing - PLAN CHECK | 1/23/2015 | | 2/12/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 1/23/2015 | 1/23/2015 | 1/28/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed architect plan review report. Attached correction item and plan review report to case.
|
Routing - Design Review | 1/23/2015 | | 1/27/2015 | | PASS |
Josh Wilson
|
|
|
ok per DRH14-00449
|
Routing PW Street Lights | 1/23/2015 | | 1/27/2015 | | FAIL |
Mike D Hedge
|
|
|
Working directly with electrical engineer to get drawings corrected.
|
Routing PW Sewer Rating | 1/23/2015 | | 1/26/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Drainage | 1/23/2015 | | 1/23/2015 | | PASS |
Brian Murphy
|
|
|
work in achd right of way
|
Intake Approval | | | 1/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Sheets C3.00, C4.01, C4.10 did not upload.
Form 310 statement of special inspection needs engineers stamp with seal.
Com Check needs to be in plan set and to the 2009 IECC
|
Intake Approval | | | 1/23/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adel Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 1/23/2015 | | 1/23/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - Erosion and Sediment | 1/23/2015 | | 1/23/2015 | | PASS |
Evan Jenkins
|
|
|
(GEORGE'S CYCLE) Conversion of an existing auto parts warehouse and retail building into a bicycle retail shop and warehouse. Interior Demo, Demo of curb and sidewalks. installation of permeable pavers, sidewalks and curb. Regular Site Improvements
|
Plan Reviewer's activity | | | 1/23/2015 | | DONE |
Jason Blais
|
|
|
Emailed architect to provide written verification from ACHD for any required inspection or additional impact fees due. To be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 1/23/2015 | | 1/23/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 1/23/2015 | | 1/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | | 1/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 20 2015 4:18PM
|