BLD-Final | 7/22/2015 | 7/23/2015 | 7/23/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Paul Thompson
|
DOC - Permit Finaled | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 | A | NR |
Mike Jordan
|
|
|
key is in receptacle at front door Phone #: ###-#### Inspection requested via web by Paul Thompson. Install code compliant handrail.
|
CHANGE STATUS TO (ISS) | | | 5/19/2015 | | DONE |
Christina Prado
|
|
|
Plan mod paid and issued
|
(F) Reprint permit | | | 5/19/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 5/18/2015 | | |
|
|
|
|
Plan assigned to (JG) | 5/12/2015 | 5/12/2015 | 5/18/2015 | | PASS |
Javier Guzman
|
|
|
5/22 F Plan Mod ePlan
|
Routing - PLAN CHECK | 5/14/2015 | | 5/18/2015 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2015 | | DONE |
|
|
|
****DO NOT RE-ISSUE***
|
Routing - PLANNING | 5/14/2015 | | 5/14/2015 | | PASS |
David Moser
|
|
|
Approved as per the revised site plan and elevations dated 5-14-15
|
Plan Modification Accepted | | | 5/12/2015 | | DONE |
Christina Prado
|
|
|
Per Paul with Habitat for Humanity - Start plan mod workflow to allow him to reupload changes to front porch columns relocations
|
BLD-Energy code compliance | 5/6/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Paul Thompson
|
BLD-Framing/Rough-in | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | FAIL |
Mike Jordan
|
|
|
Have corrected issues this a.m. Phone #: ###-#### Inspection requested via web by Paul Thompson. Provide additional engineering for 3ply LVL that has been drilled in several places. Provide lateral bracing on A1 trusses in garage. Provide header for door under stairs. Ok to insulate.
|
BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Paul Thompson. Complete airseal prior to framing inspection. Inspection cancelled from web by: Paul Thompson
|
BLD-Wall Bracing | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Phil Shearer
|
|
|
Second floor sheer inspection Phone #: ###-#### Inspection requested via web by Paul Thompson
|
BLD-Wall Bracing | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Mike Jordan
|
|
|
Inspection for shear nailing first floor. Would like to cover with house wrap if it''s good. Phone #: ###-#### Inspection requested via web by Paul Thompson
|
BLD-Foundation | 2/23/2015 | 2/24/2015 | 2/24/2015 | P | PASS |
Mike Jordan
|
|
|
early Pm if possible please Phone #: ###-#### Inspection requested via web by Paul Thompson
|
BLD-Footing | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Mike Jordan
|
|
|
Early pm if possible..... Thanks Phone #: ###-#### Inspection requested via web by Paul Thompson
|
Inspection Record Card- Bld | | | 2/19/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 2/19/2015 | | |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 2/18/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 2/18/2015 | | DONE |
Christina Prado
|
|
|
all requirements met
|
Plan assigned to (JG) | 2/4/2015 | 2/4/2015 | 2/17/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 2/16 M L1 ePlan** Pending Planning
|
Routing - PLANNING | 2/17/2015 | | 2/17/2015 | | PASS |
David Moser
|
|
|
The covered front porch has been removed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2015 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 2/4/2015 | | 2/13/2015 | | PASS |
Jennifer Bruner
|
|
|
Signed off in ePlan by Jennifer Bruner
|
1st review completed | | | 2/13/2015 | | FAIL |
Javier Guzman
|
|
|
pending Planning
|
Routing - PLAN CHECK | 2/4/2015 | | 2/13/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 2/4/2015 | | 2/6/2015 | | FAIL |
David Moser
|
|
|
Failed: The covered front porch is in the utility easement. need to remove the covered front porch.
|
Routing - Addressing | 2/4/2015 | | 2/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - MECHANICAL | 2/4/2015 | | 2/4/2015 | | FAIL |
Troy James
|
|
|
Emailed corrections to Idaho HVAC
|
Intake Approval | | | 2/4/2015 | | PASS |
|
|
|
|
Routing - MECHANICAL | 2/4/2015 | | 2/4/2015 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 1/30/2015 | | FAIL |
|
|
|
Still missing Cross section, No manuals, not showing attice vents and/or crawlspace and missing stair section detail
|
Intake Approval | | | 1/30/2015 | | FAIL |
|
|
|
Still missing Cross section, No manuals, not showing attice vents and/or crawlspace and missing stair section detail. Call to Paul
|
Intake Approval | | | 1/27/2015 | | FAIL |
|
|
|
No cross section
|
Application received | | | 1/26/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 26 2015 1:13PM
|