BLD-Final | 7/21/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 7/17/2015 | 7/17/2015 | 7/17/2015 | A | PASS |
Jim Sly
|
|
|
pouring concrete too close to property line-there should be 3' landscape buffer between contrete and propline-can you please make sure they meet requirements? Measured and appears OK.......Verifiied with Sue C. Zoning ...... that sidewalk area within 1' of property line .......starting approx 4' from front of garage OK. Because you can not drive a car into that area.
|
BLD-Wall Bracing | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Jim Sly
|
|
|
Matt// interior gb inspection Phone #: ###-####
|
BLD-Energy code compliance | 4/13/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Wall Bracing | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PART |
Jim Sly
|
|
|
Matt Phone #: ###-#### Need to check interior Gyp shear.
|
BLD-Framing/Rough-in | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Wall Bracing | 3/22/2015 | 3/23/2015 | 3/23/2015 | A | PART |
Jim Sly
|
|
|
Phone #: 2088180141 >> Inspection requested via mobile web by Matt Exterior nailing only.....OK.
|
BLD-Foundation | 2/23/2015 | 2/24/2015 | 2/24/2015 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Footing | 2/20/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
OVERRIDE | | | 2/13/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 2/12/2015 | | |
|
|
|
|
Plan assigned to (JG) | 1/29/2015 | 1/29/2015 | 2/12/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 2/10 T L1 ePlan**
|
Routing - PLAN CHECK | 2/10/2015 | | 2/12/2015 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
|
|
|
All requirements have been met
|
1st review completed | | | 2/10/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/29/2015 | | 2/10/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - MECHANICAL | 1/29/2015 | | 2/4/2015 | | FAIL |
Troy James
|
|
|
Emailed corrections to Western
|
Routing - MECHANICAL | 2/4/2015 | | 2/4/2015 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 1/29/2015 | | FAIL |
|
|
|
The shear plan can't be TBD. If it's engineered, you must provide engineering.
|
Intake Approval | | | 1/29/2015 | | PASS |
|
|
|
|
Routing - PLANNING | 1/29/2015 | | 1/29/2015 | | PASS |
Colleen T Carroll
|
|
|
Provide a 3' landscape buffer between drive way and adjoining property.
|
Routing - Addressing | 1/29/2015 | | 1/29/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 1/29/2015 | | 1/29/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | | 1/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2015 5:41PM
|