Permit Information
Permit NumberBLD15-00220
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 350 N MILWAUKEE ST Unit: 1179
Project NameBTS - #1179
Customer Number 
ePlanReviewYes
Description
(THE WALKING COMPANY) MODIFICATION TO CHANGE THE FIXTURE PLAN For interior tenant improvements to an existing 1,338 tenant space with work to include the removal of existing interior nonbearing partition walls, construction of a new interior nonbearing partition wall for the storage room and the intallation of related interior finishes and fixtures per the approved plans and any notations. The mall bulkhead is not being attached to and the existing heating and cooling unit is being maintained with only minor duct work being done. The storage racking is not approved under this permit and a separate racking permit is required. This is a fully fire sprinklered building for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/14/20156/24/2015 DONE
This permit finaled on the web by Karen Trusty
Second Notice 5/16/20156/9/2015 DONE
sent in mail
First Notice 4/3/20155/6/2015 DONE
Permanent Occupancy  3/24/2015 DONE
FIRE-Final Inspection3/23/20153/23/20153/23/2015PCANC
DetailsTroy Cobbley
Duplicate inspection
BLD-Final3/23/20153/23/20153/23/2015PPASS
DetailsMike Jordan
Rocko Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection3/20/20153/23/20153/23/2015PCANC
DetailsTroy Cobbley
Duplicate inspection
FIRE-Final Inspection3/20/20153/23/20153/23/2015APASS
DetailsTroy Cobbley
Life safety passed. One additional exit sign is required in the Stock Room and I will verify at the racking permit inspection.
CHANGE STATUS TO (ISS)  3/20/2015 DONE
DetailsCandy A. Nichols
as per Carl M no plan mod fees due
Permit Ready to Issue  3/19/2015 DONE
DetailsCandy A. Nichols
please do no re issue, no plan mod fees due
Routing - PLAN CHECK3/18/2015 3/18/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/18/2015 DONE
BLD-Framing/Rough-in3/3/20153/4/20153/4/2015APASS
DetailsJim Sly
Rocko Phone #: ###-####
Issue PAID IN FULL permit  2/26/2015 DONE
DetailsChristina Prado
Print Occupancy Form  2/26/2015 DONE
DetailsChristina Prado
Plan assigned to (CDM)2/11/20152/11/20152/18/2015 PASS
DetailsCarl D Madsen
BTS #1179
Routing - PLAN CHECK2/11/2015 2/18/2015 PASS
DetailsCarl D Madsen
1st review completed  2/18/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/18/2015 DONE
Permit Ready to Issue  2/18/2015 DONE
NEED GC form and Certificate of Value
All requirements met 2-25-15 cdp
Routing PW Sewer Rating2/11/2015 2/12/2015 PASS
DetailsJennifer Bruner
Intake Approval  2/11/2015 FAIL
DetailsAdele J Schaffeld-Griffin
2-3-15
Please see the electronic submittal standards at http://pds.cityofboise.org/pds-online/e-services/eplanreview/

Each drawing, document in the folders shall meet the standard naming convention.

Please upload the completed 304 form.

All drawings shall be uploaded individually and named correctly.

Once upload complete a pre screen will be completed.

2-4-15 none of the above items were addressed. If you have having issues with e plan review please contac Alex at adeyoung@cityofboise.org

2-6-15 None of the items were addressed.

2-11-15 plan sheets were deleted by permit tech by applicants request prior to pre screen being completed. I can not complete a pre screen until the sheets are re up loaded.
Intake Approval  2/11/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing2/11/2015 2/11/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS2/11/2015 2/11/2015 PASS
DetailsJennifer Bruner
Intake Approval  2/6/2015 FAIL
DetailsAdele J Schaffeld-Griffin
2-3-15
Please see the electronic submittal standards at http://pds.cityofboise.org/pds-online/e-services/eplanreview/

Each drawing, document in the folders shall meet the standard naming convention.

Please upload the completed 304 form.

All drawings shall be uploaded individually and named correctly.

Once upload complete a pre screen will be completed.

2-4-15 none of the above items were addressed. If you have having issues with e plan review please contac Alex at adeyoung@cityofboise.org

2-6-15 None of the items were addressed.
Intake Approval  2/4/2015 FAIL
DetailsAdele J Schaffeld-Griffin
2-3-15
Please see the electronic submittal standards at http://pds.cityofboise.org/pds-online/e-services/eplanreview/

Each drawing, document in the folders shall meet the standard naming convention.

Please upload the completed 304 form.

All drawings shall be uploaded individually and named correctly.

Once upload complete a pre screen will be completed.

2-4-15 none of the above items were addressed. If you have having issues with e plan review please contac Alex at adeyoung@cityofboise.org
Intake Approval  2/3/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please see the electronic submittal standards at http://pds.cityofboise.org/pds-online/e-services/eplanreview/

Each drawing, document in the folders shall meet the standard naming convention.

Please upload the completed 304 form.

All drawings shall be uploaded individually and named correctly.

Once upload complete a pre screen will be completed.
Application received  1/29/2015 DONE
Application submitted via PDS Online on Jan 29 2015 10:20AM