Permit Information
Permit NumberBLD15-00224
StatusFinaled
Name DOUGLAS PETERSON
Site Address 510 W HAYS ST
Project NameDouglas Peterson Tri-plex
Customer Number 
ePlanReviewNo
Description
"PLAN MODIFICATION TO COMPLETE THE SECOND STORY UNIT"" To remodel an existing mixed use building into a three unit (Tri-plex) building. The main floor will be remodeled into two separate dwelling units rather than 1 dwelling unit and a professional office. An existing apartment is located on the 2nd story. Work to include: build dwelling unit separation walls and horizontal separation per plans; install new exterior doors and windows; add insulation per plan locations; provide separate electrical services; construct a new kitchen and bathroom for the new dwelling unit; install smoke detectors; electrical, mechanical, and plumbing work. All work per the approved plans, attached plan review report, and adopted codes. NOTE: This building is fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20201/8/20201/8/2020ADONE
DetailsTony Young
All agencies/trades have signed off final.
DOC - Permit Finaled  1/8/2020 DONE
BLD - Request for Extension3/21/20193/22/20193/25/2019APEND
DetailsTony Young
Martha-(wife)would like a 4 month extenion because her husband is out of county until the end of July Phone #: ###-####
BLD-Conference3/4/20193/5/20193/13/2019ANR
DetailsTony Young
Status review/// still needing fire pass
BLD-Conference2/27/20193/1/20193/4/2019PPEND
DetailsTony Young
Status review
Zoning Approval2/28/20192/28/20192/28/2019 DONE
DetailsLeon Letson
BLD-Other2/25/20192/27/20192/27/2019AFAIL
DetailsTony Young
Status?,, appears to occupied,, left a correction notice to have fire, building and zoning approvals, and a "do not occupy" red tag
BLD-Final9/5/20179/7/20179/7/2017PNR
DetailsTony Young
Doug or ###-#### Marsha Phone #: ###-####,, need trades 1st,, no inspection made
BLD-Wall Bracing7/14/20177/14/20177/14/2017PPART
DetailsJim Storey
Douglas-please call when on way Phone #: ###-#### sheer wall ok/ blocking raffters to header bed room needed/ ok to insulate with ele aproval
(F) Reprint permit  7/13/2017 DONE
CHANGE STATUS TO (ISS)  7/13/2017 DONE
Plan Mod
Plan assigned to (CDM)6/7/20176/7/20177/3/2017 PASS
DetailsCarl D Madsen
1st Comp Triplex Plan Mod
Routing - PLAN CHECK6/28/2017 7/3/2017 PASS
DetailsCarl D Madsen
Case Summary (BLD)  7/3/2017 DONE
Permit Ready to Issue  7/3/2017 DONE
All Met, fees are high due to Sewer fees not getting paid/routed in 2015. Any questions talk with Rachael
Telephone call  7/3/2017 DONE
Left a message for Martha informing that this plan mod is ready to be picked up and the fee amount due. Informed her that it looks like most are due to sewer and left rachael's number as well
Routing - Design Review6/17/2017 6/28/2017 PASS
DetailsSarah Schafer
Approved per DRH15-00025
Routing - PLAN CHECK6/13/2017 6/16/2017 FAIL
DetailsCarl D Madsen
Routing - PUBLIC WORKS6/13/2017 6/13/2017 PASS
DetailsRachael Beierle
Permited as SFD. Sewer credit applied to capacity fees for SFD. Triplex sewer permit must be obtained.
Routing - Addressing6/13/2017 6/13/2017 PASS
DetailsLaura Hunter
Added 3 apartment numbers for tri-plex. Apt 101, 102, and 201
Plan Modification Accepted  6/7/2017 DONE
Plan modification. Take to Carl M per Carl W.
BLD-Conference5/17/20165/20/20165/20/2016PPEND
DetailsTony Young
status review,, may be occupied without approval per fire inspector JP
BLD-Conference5/16/20165/17/20165/17/2016AFAIL
DetailsTony Young
status review,, may be occupied without approval per fire inspector JP,, C/N POSTED AND OCCUPANCY VIOLATION NOTICE POSTED
BLD-Energy code compliance8/27/20158/28/20158/28/2015ADONE
DetailsTony Young
Martha Phone #: ###-####
BLD-Energy code compliance8/27/20158/27/20158/28/2015PPASS
DetailsTony Young
Martha Phone #: ###-####
BLD-Framing/Rough-in8/26/20158/27/20158/27/2015APASS
DetailsTony Young
Martha Phone #: ###-####
BLD-Framing/Rough-in8/12/20158/12/20158/12/2015PPART
DetailsTony Young
Martha// please call before Phone #: ###-####,, need fireblocking
BLD-Framing/Rough-in8/5/20158/6/20158/6/2015ANR
DetailsTony Young
would like call ahead; Lane Phone #: ###-####,, follow up
BLD-Conference8/3/20158/5/20158/5/2015APEND
DetailsTony Young
would like call ahead; Lane Phone #: ###-####,, follow up
BLD-Framing/Rough-in7/31/20158/3/20158/3/2015AFAIL
DetailsTony Young
would like call ahead; Lane Phone #: ###-####,, conf only,, need trades
Route to Impact Fee Review6/15/20156/15/20156/18/2015 PASS
DetailsCindy M. Gould
Issue PAID IN FULL permit  6/17/2015 DONE
Plan assigned to (AJS)5/12/20155/12/20156/16/2015 PASS
DetailsAdele J Schaffeld-Griffin
Level 3 TI - Paper - Tri-plex - Reassigned from Sam Zahorka
Case Summary (BLD)  6/16/2015 DONE
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK6/16/2015 6/16/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/16/2015 DONE
Permit Ready to Issue  6/16/2015 DONE
NEED GC form
OWNER IS ACTING AS GC
Print Occupancy Form  6/16/2015 DONE
Telephone call  6/16/2015 DONE
called Douglas to let know permit is ready and how much is owed-left message on phone
Routing - PLAN CHECK6/12/2015 6/15/2015 FAIL
DetailsAdele J Schaffeld-Griffin
emailed architect with additional comments
Routing - FIRE6/12/20156/12/20156/12/2015 PASS
DetailsKatie Marron
Comments attached to plans
Plan resubmittals received  6/11/2015 DONE
received two sets of Floor Plan (A-1)
Plan assigned to (SRZ)3/25/20153/25/20155/12/2015 DEFR
DetailsSam Zahorka
1st review completed.
Reassigned to Adele Schaffeld-Griffin
Routing - FIRE4/15/20154/15/20155/4/2015 FAIL
DetailsScott Arellano
Pending Building Official evaluation on change of use.
Routing - PLANNING4/15/2015 4/15/2015 PASS
DetailsMatthew A Halitsky
Routing - PLAN CHECK4/15/2015 4/15/2015 FAIL
DetailsSam Zahorka
Routing - PLAN CHECK3/25/2015 4/14/2015 FAIL
DetailsSam Zahorka
Routing - MECHANICAL4/14/2015 4/14/2015 PASS
DetailsTroy James
Plan Reviewer's activity  4/14/2015 DONE
DetailsSam Zahorka
In researching the history on this building through the records department it has been found this is an occupancy conversion from an office to a Tri-plex. Additional information is required to process this building permit. The applicant will be notified.
1st review completed  4/14/2015 FAIL
DetailsSam Zahorka
Intake Approval  3/25/2015 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN TECH  3/25/2015 DONE
DetailsChristina Prado
Override - Parcel Holds  3/25/2015  
Recd Pcfee & Taken To Pln CK  3/25/2015 DONE
DetailsChristina Prado
Telephone call  2/24/2015 DONE
DetailsSam Zahorka
I spoke with Douglas Peterson on the telephone and requested a Major T.I. useing the multi-family checklist for submittal requirements. I suggested once he gathers his submittals to schedule a pre-application meeting for submittals information verification prior to his intake meeting.
Meeting  2/23/2015 DONE
DetailsSam Zahorka
Met with a Douglas Peterson. Gave him the Major Tenant Improvment applications and submittal checklist. Informed him of the permits required to change this building into a Tri-Plex.
BLD-Conference2/17/20152/17/20152/17/2015PDONE
DetailsBob Archibald
Verified two existing dwelling units one upstairs and one on the main level, northwest end. Main level was gutted of wall and ceiling finishes and was reported that it would become the third dwelling unit.
Routing Walk-In (BLD)1/29/20151/29/20151/29/2015PFAIL
DetailsTisha Gallop
this is Triplex. Needs planning approval and submit major TI for any remodel.
Application received 1/29/2015