PubWorks Occupancy Approval | 4/8/2016 | 4/8/2016 | 4/8/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 12/10/2015 | 12/14/2015 | 12/14/2015 | A | PASS |
Phil Shearer
|
|
|
Change day and time per Robert Phone #: ###-#### (bond posted for site stabilization)
|
DOC - Permit Finaled | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 12/11/2015 | 12/11/2015 | 12/11/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Other | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Phil Shearer
|
|
|
Drywall/soffit/firewall inspection please Phone #: ###-#### Inspection requested via web by Janene Dodds
|
BLD-Framing/Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 | P | CANC |
Jim Storey
|
|
|
Re-inspection for Framing Phone #: ###-#### Inspection requested via web by Janene Dodds passed previously
|
BLD-Energy code compliance | 8/24/2015 | 8/25/2015 | 8/26/2015 | P | PASS |
Dave Hannah
|
|
|
Insulation Inspection please Phone #: ###-#### Inspection requested via web by Janene Dodds
|
BLD-Framing/Rough-in | 8/24/2015 | 8/25/2015 | 8/26/2015 | P | PASS |
Dave Hannah
|
|
|
Framing Re-Inspection please Phone #: ###-#### Inspection requested via web by Janene Dodds
|
BLD-Framing/Rough-in | 8/20/2015 | 8/24/2015 | 8/24/2015 | A | PART |
Phil Shearer
|
|
|
CN posted Fire blocking upstairs and down stairs, truss bracing and girder nailing, truss hanger nailing, Engineering for headers in the bacement.
|
Plan Modification Accepted | | | 8/21/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/21/2015 | | 8/21/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 8/5/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Dave Hannah
|
|
|
Re-inspection plus inspection for fire soffits Phone #: ###-#### Inspection requested via web by Janene Dodds
|
BLD-Wall Bracing | 8/4/2015 | 8/5/2015 | 8/6/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Janene Dodds ok to cover ext
|
BLD-Wall Bracing | 8/5/2015 | 8/6/2015 | 8/5/2015 | A | CANC |
Dave Hannah
|
|
|
Reinspection Plus Fire Soffit Phone #: ###-#### >> Inspection requested via web by Janene Dodds Inspection cancelled from web by: Janene Dodds
|
BLD-Foundation | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Foundation | 4/13/2015 | 4/13/2015 | 4/13/2015 | A | NR |
Phil Shearer
|
|
|
ready at 11:00 Phone #: ###-#### Inspection requested via web by Jay Jones
|
BLD-Footing | 4/2/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Phil Shearer
|
|
|
Will be ready around 10 Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 3/30/2015 | 3/30/2015 | 3/30/2015 | | DONE |
Jason C. Taylor
|
|
|
Crawl Space & Basement Footings Only****A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 3/19/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 3/18/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 3/18/2015 | | DONE |
Candy A. Nichols
|
|
|
requirements met
|
Plan assigned to (JG) | 2/23/2015 | 2/23/2015 | 3/17/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 3/11 W L2 Hillside ePlan**
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/27/2015 | | 3/17/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 3/13/2015 | | 3/13/2015 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 2/27/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 2/23/2015 | | 2/27/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 2/23/2015 | 2/23/2015 | 2/26/2015 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department vehicle access.
|
Routing - MECHANICAL | 2/23/2015 | | 2/25/2015 | | FAIL |
Troy James
|
|
|
emailed a1 heating
|
Routing - PLANNING | 2/23/2015 | | 2/23/2015 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 2/23/2015 | | 2/23/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 2/23/2015 | | 2/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 2/23/2015 | | 2/23/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED)
Permit for the construction of a new 5035 sq. ft., two story (upper level 2931 sq. ft., lower level 2104 sq. ft.) single family dwelling with 4 bedrooms, 2 bathrooms, 2 half bathrooms , approximately 330 sq. ft. of covered patio/porch and a 1066 sq. ft. attached garage per the approved plans,
|
Plans ACCEPTED BY PLAN TECH | | | 2/23/2015 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 2/23/2015 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/23/2015 | | PASS |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 2/23/2015 | | 2/23/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Application received | | | 1/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2015 4:16PM
|