PubWorks Occupancy Approval | 6/6/2016 | 6/6/2016 | 6/6/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 4/5/2016 | | DONE |
|
|
|
|
BLD-Final | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 3/10/2016 | 3/10/2016 | 3/10/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 3/8/2016 | 3/8/2016 | 3/8/2016 | | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Ok for temp occ.call inspection in after p&z approval is complete
|
Temporary Occupancy | 1/7/2016 | 4/6/2016 | 1/7/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 1/7/2016 | 4/6/2016 | 1/7/2016 | | DONE |
Candy A. Nichols
|
|
|
|
FIRE-Final Inspection | 12/23/2015 | 12/24/2015 | 12/24/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety passed/complete.
|
Zoning Approval Temp | 12/18/2015 | 12/18/2015 | 12/18/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Other | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Mike Jordan
|
|
|
RC Channel // Pat Phone #: ###-####
|
BLD-Energy code compliance | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Amar. Seal penetrations in draft stop, complete firecaulking on ventilation fans. ok to insulate.
|
BLD-Framing/Rough-in | 10/23/2015 | 10/23/2015 | 10/23/2015 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Amar. Electrical rough in inspection has failed.
|
BLD-Framing/Rough-in | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PART |
Mike Jordan
|
|
|
ok for morning if you are in the area. Phone #: ###-####. Underfllor.
|
BLD-Foundation | 7/29/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Mike Jordan
|
|
|
Manual Phone #: ###-####
|
BLD-Footing | 7/28/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
OVERRIDE | | | 4/28/2015 | | |
|
|
|
|
Issue & PRINT permit | | | 4/28/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/28/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2015 | | DONE |
Sam Zahorka
|
|
|
|
Permit Ready to Issue | | | 4/28/2015 | | DONE |
|
|
|
all requirments met
|
Plan assigned to (SRZ) | 2/6/2015 | | 4/28/2015 | | PASS |
Sam Zahorka
|
|
|
Pending others to PASS
|
Routing PW Solid Waste | 4/10/2015 | | 4/27/2015 | | PASS |
Megan Durrell
|
|
|
Trash enclosure dimensions still differs on each site drawing.
|
Routing - PLANNING | 4/23/2015 | | 4/23/2015 | | PASS |
Cody Riddle
|
|
|
Bond for amenities received today.
|
Routing - Design Review | 4/23/2015 | | 4/23/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 4/13/2015 | 4/13/2015 | 4/15/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLANNING | 4/14/2015 | | 4/14/2015 | | FAIL |
Cody Riddle
|
|
|
Bonding for amenities has not been provided.
|
Routing PW Sewer Rating | 4/10/2015 | | 4/14/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 4/13/2015 | | 4/13/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 4/13/2015 | | 4/13/2015 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Design Review | 4/10/2015 | | 4/10/2015 | | FAIL |
Andrea Tuning
|
|
|
Install a Class II tree in the planter island to the west of Building 3.
|
Routing - Addressing | 4/10/2015 | | 4/10/2015 | | PASS |
Emily Dixon
|
|
|
Address corrected to 896 N Maple Grove Rd. 4 unit addresses added.
|
Route to Impact Fee Review | 2/27/2015 | 3/2/2015 | 3/6/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Drainage | 3/5/2015 | | 3/5/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 2/6/2015 | | 2/27/2015 | | FAIL |
Megan Durrell
|
|
|
Site plan, site details and civil site plan dimensions for trash enclosure do not match. Double enclosure minimum interior dimensions are 18' x 12' and single enclosure minimum interior dimensions are 12' x 12'.
|
1st review completed | | | 2/27/2015 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 2/6/2015 | | 2/27/2015 | | FAIL |
Sam Zahorka
|
|
|
See change mark corrections in ePlanReview
|
Routing Off Site - STRUCTURAL | 2/6/2015 | | 2/27/2015 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 2/6/2015 | | 2/25/2015 | | FAIL |
Susan Riggs
|
|
|
Amenities must be bonded for prior to issuance of a building permits. Amenities consist of walking paths, gazebo, picnic area, and benches. I have left 2 voice messages with the applicant Jeramy.
|
Routing PW Drainage | 2/6/2015 | | 2/24/2015 | | FAIL |
Brian Murphy
|
|
|
NEED LETTER FROM IRRIGATION DISTRICT
|
Routing - FIRE | 2/6/2015 | | 2/17/2015 | | FAIL |
Scott Arellano
|
|
|
emailed comments to architect. Attached comments to case.
|
Routing - MECHANICAL | 2/6/2015 | | 2/12/2015 | | FAIL |
Troy James
|
|
|
|
Routing PW Street Lights | 2/6/2015 | | 2/9/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PLANNING Land Div | 2/6/2015 | | 2/9/2015 | | PASS |
Dave Abo
|
|
|
|
Routing PW Sewer Rating | 2/6/2015 | | 2/9/2015 | | FAIL |
Jennifer Bruner
|
|
|
Corrected addressing required
|
Routing - Erosion and Sediment | 2/6/2015 | | 2/9/2015 | | PASS |
Evan Jenkins
|
|
|
Please Reference existing ESC14-01052 (Approved on 11-18-14) for requirements and BLD14-03267. (13 PERMITS UNDER CASE BLD15-00237 in ePlanReview) Bldg A (1) - Type 3 (Elev 3, A-203): Multifamily 4-Plex project consisting of 14 two-story buildings on 3.79 acre site located at 826 N Maple Grove, just north of Emerald. 13 buildings (52 units) will be 2 bedroom, 2 bathroom and 1 building (4 units) will be 1 bedroom, 1 bathroom.
Of the 13, 2 bedroom buildings, the two buildings located adjacent to Maple Grove have a different rear elevation and roof line and are designated as Building Type 3 while the other 2 bedroom buildings are Building Type 1. The 1 bedroom building is designated as Building Type 2.
Since all 14 buildings will be on the same parcel, they will all share the 826 N Maple Grove address. We propose to individually identify each building with a letter (A thru N) as shown on the site plan A-101. Within the plans, the buildings also have a number designation (1 thru 14) for plan referencing.
|
Routing - Addressing | 2/6/2015 | | 2/6/2015 | | FAIL |
Emily Dixon
|
|
|
Each building needs to have a unique street number that will be assigned by the City of Boise.
|
Routing - PUBLIC WORKS | 2/6/2015 | | 2/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Design | 2/6/2015 | | 2/6/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
NO REVIEW: Public portion of the sewer line reviewed under BLD14-03267.
|
Routing - PLUMBING | 2/6/2015 | | 2/6/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 2/6/2015 | | 2/6/2015 | | FAIL |
Andrea Tuning
|
|
|
All planters shall be 8-feet in width.
Install a landscape planter in the parking row so parkign does not exceed 10 spaces.
The site plan and landscape plan should match one another.
All pole lighting and utilities can not be located within the required planter islands.
|
Intake Approval | | | 2/6/2015 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 2/6/2015 | | 2/6/2015 | | DONE |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 2/5/2015 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 2/3/2015 | | FAIL |
|
|
|
(2-3-15) See the redlines on the plan intake form. Please resolve the circled items.
|
Application received | | | 1/30/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 30 2015 11:32AM
|
First Notice | | 4/15/2016 | | | |
|
|
|
|