First Notice | | 8/29/2015 | 9/15/2015 | | DONE |
|
|
|
Mailed 9/6/15
|
Permanent Occupancy | | | 8/19/2015 | | DONE |
|
|
|
|
BLD-Final | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Dave Hannah
|
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
|
FIRE-Final Inspection | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
Zoning Approval | 8/18/2015 | 8/18/2015 | 8/18/2015 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | CANC |
Jim Page
|
|
|
Fire life safety inspection Shane Treasure Phone #: ###-#### >> Inspection requested via web by Shane Treasure Inspection cancelled from web by: Shane Treasure
|
BLD-Ceiling Grid Inspection | 8/3/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Dave Hannah
|
|
|
Rich Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2015 | 7/21/2015 | 7/22/2015 | P | PASS |
Dave Hannah
|
|
|
First floor lobby framing inspection Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD-Conference | 7/20/2015 | 7/21/2015 | 7/20/2015 | P | CANC |
Dave Hannah
|
|
|
Lobby framing inspection Phone #: ###-#### >> Inspection requested via web by Shane Treasure Inspection cancelled from web by: Shane Treasure
|
BLD-Concrete | 7/9/2015 | 7/13/2015 | 7/13/2015 | A | PASS |
Dave Hannah
|
|
|
New pan deck for inspection Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD-Ceiling Grid Inspection | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Dave Hannah
|
|
|
Framing inspection for stairways and first floor except front lobby Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD-Conference | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PEND |
Tony Young
|
|
|
First floor alley egress design Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure,,, referred to plan review
|
BLD-Energy code compliance | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PART |
Tony Young
|
|
|
Second floor insulation Phone #: ###-#### Inspection requested via web by Shane Treasure,, walls ok to cover on 2nd floor
|
BLD-Framing/Rough-in | 5/13/2015 | 5/14/2015 | 5/14/2015 | A | PART |
Dave Hannah
|
|
|
Structural improvements and second floor framing for cover Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure second frool and basement ok
|
BLD-Framing/Rough-in | 5/12/2015 | 5/13/2015 | 5/13/2015 | P | CANC |
Dave Hannah
|
|
|
Structural framing improvement in basement and second floor. Shane Treasure Phone #: ###-#### >> Inspection requested via web by Shane Treasure Inspection cancelled from web by: Shane Treasure
|
Issue PAID IN FULL permit | | | 4/10/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/10/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/2/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 3/3/2015 | 3/3/2015 | 4/2/2015 | | PASS |
Carl Westfall
|
|
|
LUNCHBOX - Level 3 TI - ePlanReview - (15 days - Mar 23)
|
Routing - PLAN CHECK | 4/1/2015 | | 4/2/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
All requirements met///4/8/15 cdp
|
Routing - PLAN CHECK | 3/31/2015 | | 4/1/2015 | | FAIL |
Carl Westfall
|
|
|
Items not resolved. Talked to the Architect about what needs to be changed.
|
Plan resubmittals requested | | | 4/1/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/1/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/31/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/20/2015 | | DONE |
|
|
|
|
1st review completed | | | 3/20/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/3/2015 | | 3/20/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 3/3/2015 | 3/3/2015 | 3/6/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Erosion and Sediment | 3/3/2015 | | 3/4/2015 | | PASS |
Evan Jenkins
|
|
|
(LUNCHBOX) Tenant improvement on the front elevation new storefront system on the main floor and painting of existing elevation. On the back elevation stucco on the vertical circulation, replacement of windows and the protection of graphics in "Freak Alley" where possible.
|
Routing PW Sewer Rating | 3/3/2015 | | 3/4/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLUMBING | 3/3/2015 | | 3/4/2015 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 3/3/2015 | | 3/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 3/3/2015 | | 3/3/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 3/3/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 3/3/2015 | | 3/3/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - Design Review | 3/3/2015 | | 3/3/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00006
|
Plan Reviewer's activity | | | 2/12/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
uploaded email from ACHD on fees and inspecitons, None required
|
Intake Approval | | | 2/6/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please upload your completed checklist and 304 form so that I can complete the prescreen.
Thank you
|
Application received | | | 2/5/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2015 1:53PM
|